Turbine-Generator Shaft Related System Planning Criteria, Operating Experiences and Selected Study Results

Existing planning and operating criteria are reviewed and found inadequate in defining acceptable levels of network disturbance induced turbine-generator shaft fatigue. These criteria do not explicitly require automatic transmission line reclosing; however, operating experiences document significant, tangible benefits to system security, particularly under widespread, meteorological disturbances.