A combinatorial approach to multi-skill workforce scheduling
暂无分享,去创建一个
[1] Kmr Kristel Hoen,et al. Effect of carbon emission regulations on transport mode selection in supply chains , 2010 .
[2] Bert De Reyck,et al. The multi-mode resource-constrained project scheduling problem with generalized precedence relations , 1999, Eur. J. Oper. Res..
[3] Bob Walrave,et al. Preventing or escaping the suppression mechanism: intervention conditions , 2010 .
[4] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[5] Geert-Jan van Houtum,et al. Separate tools or tool kits:an exploratory study of engineers' preferences , 2010 .
[6] Elias W. Hans,et al. Vehicle Routing with Traffic Congestion and Drivers' Driving and Working Rules , 2010 .
[7] Rji Rob Basten,et al. An iterative method for the simultaneous optimization of repair decisions and spare parts stocks , 2009 .
[8] Herbert Kopfer,et al. Dynamic programming algorithm for the vehicle routing problem with time windows and EC social legislation , 2009 .
[9] Giri Kumar Tayi,et al. A decision aid for the selection and scheduling of software maintenance projects , 1996, IEEE Trans. Syst. Man Cybern. Part A.
[10] Haitao Li,et al. Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm , 2009, J. Sched..
[11] Erwin W. Hans,et al. Vehicle routing under time-dependent travel times: The impact of congestion avoidance , 2012, Comput. Oper. Res..
[12] Paul Grefen,et al. An efficient method to construct minimal protocol adaptors , 2009 .
[13] Krishnamurthy Vidyasankar,et al. Supporting process control in business collaborations , 2009 .
[14] Egon Lüftenegger,et al. The state of the art of innovation-driven business models in the financial services industry , 2010 .
[15] Bertrand Estellon,et al. High-Performance Local Search for Task Scheduling with Human Resource Allocation , 2009, SLS.
[16] Cor A. J. Hurkens,et al. Incorporating the strength of MIP modeling in schedule construction , 2009, RAIRO Oper. Res..
[17] Muh-Cherng Wu,et al. A project scheduling and staff assignment model considering learning effect , 2006 .
[18] Erik Demeulemeester,et al. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .
[19] Herbert Kopfer,et al. Distributed Decision Making in Combined Vehicle Routing and Break Scheduling , 2009, LDIC.
[20] Rainer Kolisch,et al. Scheduling and staffing multiple projects with a multi-skilled workforce , 2010, OR Spectr..
[21] X. Cai,et al. A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..
[22] Roland Heilmann,et al. Discrete Optimization A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags , 2002 .
[23] Odile Bellenguez-Morineau,et al. A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem , 2007, RAIRO Oper. Res..
[24] Gilbert Laporte,et al. Scheduling technicians and tasks in a telecommunications company , 2008, J. Sched..
[25] N. Litvak,et al. A Survey of Health Care Models that Encompass Multiple Departments , 2009 .
[26] Jirachai Buddhakulsomsiri,et al. Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting , 2006, Eur. J. Oper. Res..
[27] Osman Alp,et al. Inventory control with partial batch ordering , 2009 .
[28] Richard J. Boucherie,et al. An exact approach for relating recovering surgical patient workload to the master surgical schedule , 2009, J. Oper. Res. Soc..
[29] Marco Slikker,et al. Spare parts inventory pooling games , 2009 .
[30] Walter J. Gutjahr,et al. Competence-driven project portfolio selection, scheduling and staff assignment , 2008, Central Eur. J. Oper. Res..
[31] Herbert Kopfer,et al. Analyzing combined vehicle routing and break scheduling from a distributed decision making perspective , 2009 .
[32] Martin Grunow,et al. Capacity flexibility allocation in an outsourced supply chain with reservation , 2011 .
[33] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[34] Ben Vermeulen,et al. Toward meso-level product-market network indices for strategic product selection and (re)design guidelines over the product life-cycle , 2010 .
[35] V. Maniezzo,et al. An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation , 1998 .
[36] Rolf H. Möhring,et al. Solving Project Scheduling Problems by Minimum Cut Computations , 2002, Manag. Sci..
[37] Matt Bassett. Assigning projects to optimize the utilization of employees' time and expertise , 2000 .
[38] Paul Grefen,et al. Minimal protocol adaptors for interacting services , 2010 .
[39] Hideki Hashimoto,et al. A GRASP-based approach for technicians and interventions scheduling for telecommunications , 2011, Ann. Oper. Res..
[40] Ben Vermeulen,et al. Co-evolution of demand and supply under competition , 2009 .
[41] Masataka Yoshimura,et al. Decision-making support system for human resource allocation in product development projects , 2006 .
[42] Murat Firat,et al. Stability in multi-skill workforce scheduling , 2010 .
[43] Jean-Charles Billaut,et al. A project scheduling problem with labour constraints and time-dependent activities requirements , 2008 .
[44] Paul Grefen,et al. Design of complex architectures using a three dimension approach : the crosswork case , 2010 .
[45] Sönke Hartmann,et al. A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[46] Peter Brucker,et al. A linear programming and constraint propagation-based lower bound for the RCPSP , 2000, Eur. J. Oper. Res..
[47] M. Sacramento Quintanilla,et al. Skilled workforce scheduling in Service Centres , 2009, Eur. J. Oper. Res..