Optimum operation of a multiple reservoir system including salinity effects

Many studies have been carried out regarding the development of optimum operating policies for multiple reservoir systems but few of these have considered water quality as an objective. This study considers operations of the headworks system for Adelaide, Australia. The system is rather unusual because of its high salt concentrations which impose large economic costs on the consumers. In addition, a significant fraction of the supply is pumped from a distant river. An existing linear programming model for operation of the Adelaide system is modified to identify policies which minimize total system costs (including salt damage costs). These changed procedures can reduce the average salinity of the supplied water significantly but at some increase in annual pumping costs. The benefit-cost ratio of the changes is estimated to be 3.0 for the entire system.

[1]  Daniel P. Loucks,et al.  Computer Models for Reservoir Regulation , 1968 .

[2]  C. Revelle,et al.  The Linear Decision Rule in Reservoir Management and Design: 1, Development of the Stochastic Model , 1969 .

[3]  Rolf A. Deininger,et al.  Optimal Reservoir Releases for Water Quality Control , 1970 .

[4]  Charles ReVelle,et al.  Linear Decision Rule in Reservoir Management and Design: 2. Performance Optimization , 1970 .

[5]  Joe C. Moseley,et al.  Simulation/optimization Techniques for Multi-Basin Water Resource Planning , 1970 .

[6]  Henry D. Jacoby,et al.  9 FLOW REGULATION FOR WATER QUALITY MANAGEMENT , 1972 .

[7]  Nathan Buras Scientific allocation of water resources : water resources development and utilization--a rational approach , 1972 .

[8]  Donald R. F. Harleman,et al.  Prediction of Water Quality in Stratified Reservoirs , 1973 .

[9]  Gerald T. Orlob,et al.  12 – Ecologic Simulation for Aquatic Environments , 1975 .

[10]  Miguel A. Mariño,et al.  Reliability programing in reservoir management: 1. Single multipurpose reservoir , 1980 .

[11]  J. Stedinger,et al.  Water resource systems planning and analysis , 1981 .

[12]  A. Turgeon Optimal short-term hydro scheduling from the principle of progressive optimality , 1981 .

[13]  Edward A. McBean,et al.  Decision making for hydrosystems : forecasting and operation , 1982 .

[14]  Z. Kaczmarek,et al.  The Operation of Multiple Reservoir Systems , 1982 .

[15]  G. T. Orlob Mathematical Modeling of Water Quality: Streams, Lakes and Reservoirs , 1983 .

[16]  William W.-G. Yeh,et al.  Reservoir Management and Operations Models: A State‐of‐the‐Art Review , 1985 .

[17]  G. Dandy Developing Reliability-cost Tradeoffs for a Multiple Reservoir System , 1988 .