Scheduling design process with workflow for armored vehicle transmission
暂无分享,去创建一个
Studying the scheduling problems of product design process is great significance to shorten the cycle of product development and to speed up product development. The problem of optimal scheduling of transmission design flow of armored vehicle can be regarded as an optimal problem of resource constrained project scheduling. Due to the complexity of the factors affecting project, the traditional perspective is difficult to establish the proper model. Through workflow modeling we can fully describe information of the processes. In this article, based on the problem of optimal scheduling of transmission design flow of armored vehicle, we studied scheduling optimization problems based on product design process of workflow, then provided the optimal model based on the product design process of workflow. At last, we developed a system platform based on product design project scheduling of workflow to allow users to define process of product design according to their requirements and to optimize the design task scheduling through optimal scheduling modules in the platform in order to achieve the goal of shortening project duration.
[1] D. Hollingsworth. The Workflow Reference Model: 10 Years On , 2004 .
[2] Tyson R. Browning,et al. A Survey of Activity Network‐Based Process Models for Managing Product Development Projects , 2007 .
[3] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[4] Daniel Alami,et al. Process Modeling Using Event-Driven Process Chains , 2016 .