PROBABILISTIC SIMULATION STUDIES FOR REPETITIVE CONSTRUCTION PROCESSES
暂无分享,去创建一个
[1] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[2] J. P. Royston,et al. Algorithm AS 181: The W Test for Normality , 1982 .
[3] E. S. Pearson,et al. Tests for departure from normality: Comparison of powers , 1977 .
[4] W. David Kelton,et al. Statistical design and analysis , 1986, WSC '86.
[5] J. Royston. The W Test for Normality , 1982 .
[6] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .
[7] LeRoy T. Boyer,et al. Modeling Method-Productivity , 1976 .
[8] Daniel W. Halpin,et al. Design of construction and process operations , 1976 .
[9] Averill M. Law,et al. Pitfalls in the simulation of manufacturing systems , 1986, WSC '86.
[10] J. J. Swain,et al. Least-squares estimation of distribution functions in johnson's translation system , 1988 .
[11] William E. Biles. Introduction to simulation , 1987, WSC '87.
[12] James R. Wilson,et al. Visual interactive fitting of bounded Johnson distributions , 1989, Simul..
[13] N. Cox. Statistical Models in Engineering , 1970 .
[14] Leland S. Riggs. INTERACTIVE GRAPHING OF SIMULATION NETWORKS , 1989 .
[15] Bruce W. Schmeiser,et al. Batch Size Effects in the Analysis of Simulation Output , 1982, Oper. Res..
[16] George S. Fishman,et al. Solution of Large Networks by Matrix Methods , 1976, IEEE Transactions on Systems, Man, and Cybernetics.
[17] Simaan M. AbouRizk,et al. Effect of Input Modeling on Simulation Output , 1989 .