Calculating and addressing uncertainty for risk-based allowable outage times
暂无分享,去创建一个
[1] B. Atefi,et al. Feasibility assessment of a risk-based approach to technical specifications , 1991 .
[2] P. K. Samanta,et al. Evaluation of risks associated with AOT and STI requirements at the ANO-1 nuclear power plant , 1988 .
[3] P. K. Samanta,et al. Risk-based evaluation of Allowed Outage Times (AOTs) considering risk of shutdown , 1992 .
[4] W. E. Vesely. Evaluation of allowed outage times (AOTs) from a risk and reliability standpoint , 1989 .
[5] K. D. Russell,et al. Systems analysis programs for hands-on integrated reliability evaluations (SAPHIRE), Version 5.0 , 1995 .
[6] W E Vesely,et al. Study of operational risk-based configuration control , 1991 .
[7] Curtis Smith. Calculating Conditional Core Damage Probabilities for Nuclear Power Plant Operations Reliability Eng , 1998 .
[8] R. C. Bertucio,et al. Analysis of core damage frequency, Surry, Unit 1 internal events appendices , 1990 .