A MAS Model for Spacecraft TT & C Resources Scheduling
暂无分享,去创建一个
[1] Simon de Givry,et al. Bounds Arc Consistency for Weighted CSPs , 2009, J. Artif. Intell. Res..
[2] T. Nagata,et al. A Multiagent Approach to Power System Restoration , 2002, IEEE Power Engineering Review.
[3] Timothy D Gooley. Automating the Satellite Range Scheduling Process , 1993 .
[4] J. F. Ereau,et al. Modeling and simulation of a satellite constellation based on Petri nets , 1996, Proceedings of 1996 Annual Reliability and Maintainability Symposium.
[5] Stefano Riemma,et al. A negotiation scheme for autonomous agents in job shop scheduling , 2002, Int. J. Comput. Integr. Manuf..
[6] Donald A. Parish. A Genetic Algorithm Approach to Automating Satellite Range Scheduling , 1994 .
[7] T. P. Bagchi,et al. Near Optimal Ground Support in Multi-Spacecraft Missions: A GA Model and its Results , 2009, IEEE Transactions on Aerospace and Electronic Systems.
[8] Azim Eskandarian,et al. ENHANCING INTELLIGENT AGENT COLLABORATION FOR FLOW OPTIMIZATION OF RAILROAD TRAFFIC , 2002 .
[9] Wu Bin,et al. The existing limitation and corresponding improvements of LEO multi-satellite TTC , 2003 .