Estimating Highway Construction Production Rates during Design: Elements of a Useful Estimation Tool

Construction scheduling for highway projects is an important process during the design stage. Numerous research studies have attempted to apply new techniques to improve the accuracy of construction scheduling. Many of these studies, however, failed to address the practicality of the scheduling methods and the needs of highway designers. The authors conducted literature reviews, surveys, and interviews to study the challenges designers face in estimating production rates for highway construction. We found that estimation tools for production rates should be flexible, user friendly, and efficient yet comprehensive. Data should be collected from reliable sources and analyzed appropriately and efficiently before being applied to a production rate tool. This study suggested that combining designers’ experience and reliable tools is the most effective way to develop realistic production rates for highway construction scheduling.

[1]  Edward T. Harrigan,et al.  NAtioNAl CooperAtive HigHwAy reseArCH progrAm , 2013 .

[2]  Didier Gourc,et al.  Where Do We Stand with Fuzzy Project Scheduling , 2004 .

[3]  Awad S. Hanna,et al.  Quantitative Definition of Projects Impacted by Change Orders , 2002 .

[4]  Ali Touran,et al.  Case study of obsolescence and equipment productivity , 2002 .

[5]  Iris D. Tommelein,et al.  Boiler Erection Scheduling Using Product Models and Case-Based Reasoning , 1997 .

[6]  Dong-Eun Lee Probability of Project Completion Using Stochastic Project Scheduling Simulation , 2005 .

[7]  Su-Ling Fan,et al.  Object-Oriented Scheduling for Repetitive Projects with Soft Logics , 2006 .

[8]  Khaled El-Rayes,et al.  Impact of Rainfall on the Productivity of Highway Construction , 2001 .

[9]  Feniosky Peña-Mora,et al.  DYNAMIC PLANNING AND CONTROL METHODOLOGY FOR DESIGN/BUILD FAST-TRACK CONSTRUCTION PROJECTS , 2001 .

[10]  Ronald McCaffer,et al.  FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .

[11]  Simaan M. AbouRizk,et al.  Combined discrete-event/continuous simulation for project planning , 1997 .

[12]  R Ellis,et al.  DETERMINATION OF CONTRACT TIME FOR HIGHWAY CONSTRUCTION PROJECTS , 1995 .

[13]  D. V. Rosowsky,et al.  Accounting for Human Error during Design and Construction , 1995 .

[14]  Paul S.H. Poh,et al.  The Singapore buildable design appraisal system: a preliminary review of the relationship between buildability, site productivity and cost. , 1998 .

[15]  H. Randolph Thomas,et al.  Masonry Productivity Forecasting Model , 1993 .

[16]  Anil Sawhney,et al.  Adaptive Probabilistic Neural Network-Based Crane Type Selection System , 2002 .

[17]  Hojjat Adeli,et al.  Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .

[18]  Young-Ki Huh,et al.  Development of Improved Information for Estimating Construction Time , 2004 .

[19]  Daniel W. Halpin,et al.  QUANTITATIVE ASSESSMENT FOR PILES PRODUCTIVITY FACTORS , 2004 .

[20]  Enno Koehn,et al.  Climatic Effects on Construction , 1985 .

[21]  David Arditi,et al.  Automated Statistical Analysis in Stochastic Project Scheduling Simulation , 2006 .

[22]  Mario Vanhoucke Work Continuity Constraints in Project Scheduling , 2006 .

[23]  David R. Riley,et al.  Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .

[24]  R M Wideman,et al.  A pragmatic approach to using resource loading, production, and learning curves on construction projects , 1994 .

[25]  Feniosky Peña-Mora,et al.  Reliability Buffering for Construction Projects , 2004 .

[26]  Simaan M. AbouRizk,et al.  Simplified CPM/PERT Simulation Model , 2000 .

[27]  W D McFarland,et al.  Construction contract time determination , 1992 .

[28]  Jonathan Jingsheng Shi,et al.  EXACT ALGORITHM FOR SOLVING PROJECT SCHEDULING PROBLEMS UNDER MULTIPLE RESOURCE CONSTRAINTS , 2005 .

[29]  Yakov Ben-Haim,et al.  ROBUST RELIABILITY OF PROJECTS WITH ACTIVITY-DURATION UNCERTAINTY , 1998 .

[30]  Samuel T. Ariaratnam,et al.  Applications of Horizontal Characterization Techniques in Trenchless Construction , 2001 .