High Level Wind Conditions at Prospective Wind Farm Sites on the Central Mediterranean Island of Malta

wind resources at a proposed offshore wind farm site known as Is-Sikka l-Bajda is being collected. The measurements here are being conducted off an 80 metre guyed, tubular mast with ten MEASNET-calibrated anemometers (80, 70, 60, 50, 40, 35 and 10 metres a.g.l.), three wind direction sensors (78.5, 55 and 33 metres a.g.l.), two temperature and humidity probes (73 and 3 metres a.g.l.) and a pressure sensor, along with a dedicated data logger