Capacity expansion of stochastic power generation under two-stage electricity markets
暂无分享,去创建一个
[1] P. Pinson,et al. A Transmission-Cost-Based Model to Estimate the Amount of Market-Integrable Wind Resources , 2012, IEEE Transactions on Power Systems.
[2] H. Madsen,et al. On the market impact of wind energy forecasts , 2010 .
[3] C. Genesi,et al. Generation Expansion Planning in the Age of Green Economy , 2011 .
[4] Frieder Borggrefe,et al. Balancing and Intraday Market Design: Options for Wind Integration , 2011 .
[5] Michael C. Caramanis,et al. The Introduction of Non-Dispatchable Technologies as Decision Variables in Long-Term Generation Expansion Models , 1982, IEEE Power Engineering Review.
[6] Stephan Dempe,et al. Solution algorithm for an optimistic linear Stackelberg problem , 2014, Comput. Oper. Res..
[7] Jonathan F. Bard,et al. An explicit solution to the multi-level programming problem , 1982, Comput. Oper. Res..
[8] A. C. Zambroni de Souza,et al. Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model , 2011 .
[9] Lizhi Wang,et al. Designing effective and efficient incentive policies for renewable energy in generation expansion planning , 2011 .
[10] F. Bouffard,et al. Stochastic security for operations planning with significant wind power generation , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
[11] H. Minkowski,et al. Space and time , 1952 .
[12] H. Madsen,et al. Pool Strategy of a Price-Maker Wind Power Producer , 2013, IEEE Transactions on Power Systems.
[13] Victor M. Zavala,et al. A Stochastic Electricity Market Clearing Formulation with Consistent Pricing Properties , 2015, Oper. Res..
[14] S. A. Farghal,et al. Generation expansion planning including the renewable energy sources , 1988 .
[15] Juan M. Morales,et al. Intraday Trading of Wind Energy , 2015, IEEE Transactions on Power Systems.
[16] Douglas Hilleman,et al. Power Plant Cycling Costs , 2012 .
[17] Yves Smeers,et al. Generation Capacity Investments in Electricity Markets: Perfect Competition , 2013 .
[18] Frederic H. Murphy,et al. Evaluating the impacts of priority dispatch in the European electricity market , 2014 .
[19] A. Conejo,et al. Strategic Generation Investment Using a Complementarity Approach , 2011, IEEE Transactions on Power Systems.
[20] Jitka Dupacová,et al. Scenario reduction in stochastic programming , 2003, Math. Program..
[21] M. Shahidehpour,et al. Market-based transmission expansion planning , 2004, IEEE Transactions on Power Systems.
[22] Juan Álvarez Lopez,et al. Risk Minimization in Power System Expansion and Power Pool Electricity Markets , 2007 .
[23] Panos Parpas,et al. A stochastic multiscale model for electricity generation capacity expansion , 2013, Eur. J. Oper. Res..
[24] Matthias Altmann,et al. Market Designs for a Completely Renewable Power Sector , 2012 .
[25] A. Fabbri,et al. Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market , 2005, IEEE Transactions on Power Systems.
[26] Christoph Weber,et al. Adequate intraday market design to enable the integration of wind energy into the European power systems , 2010 .
[27] S. Stoft. Power System Economics: Designing Markets for Electricity , 2002 .
[28] Antonio J. Conejo,et al. Wind power investment within a market environment , 2011 .
[29] P. Pinson,et al. Trading Wind Generation From Short-Term Probabilistic Forecasts of Wind Power , 2007, IEEE Transactions on Power Systems.
[30] Jacqueline Morgan,et al. Weak via strong Stackelberg problem: New results , 1996, J. Glob. Optim..
[31] Anthony Papavasiliou,et al. Wind farm portfolio optimization under network capacity constraints , 2015, Eur. J. Oper. Res..
[32] John R. Birge,et al. Multistage stochastic programming model for electric power capacity expansion problem , 2003 .
[33] A. Conejo,et al. A Bilevel Approach to Transmission Expansion Planning Within a Market Environment , 2009, IEEE Transactions on Power Systems.
[34] Benjamin F. Hobbs,et al. Locational-based coupling of electricity markets: benefits from coordinating unit commitment and balancing markets , 2011 .
[35] D. J. Burke,et al. Optimal firm wind capacity allocation to power systems with security constraints , 2009, 2009 IEEE/PES Power Systems Conference and Exposition.
[36] A. J. Conejo,et al. Strategic Generation Investment Considering Futures and Spot Markets , 2012, IEEE Transactions on Power Systems.
[37] Jin Zhong,et al. Pricing Electricity in Pools With Wind Producers , 2012, IEEE Transactions on Power Systems.
[38] G. Latorre,et al. Classification of publications and models on transmission expansion planning , 2003 .
[39] Frederic H. Murphy,et al. Generation Capacity Expansion in Imperfectly Competitive Restructured Electricity Markets , 2005, Oper. Res..
[40] Jeremy Lin,et al. Wind Power and Electricity Prices at the PJM Market , 2013, IEEE Transactions on Power Systems.
[41] V. Miranda,et al. Wind power forecasting uncertainty and unit commitment , 2011 .
[42] Pedro Linares,et al. Incorporating oligopoly, CO2 emissions trading and green certificates into a power generation expansion model , 2008, Autom..
[43] José Fortuny-Amat,et al. A Representation and Economic Interpretation of a Two-Level Programming Problem , 1981 .
[44] T. S. Chung,et al. Optimal generation expansion planning via improved genetic algorithm approach , 2004 .
[45] Yves Smeers,et al. Stochastic Equilibrium Models for Generation Capacity Expansion , 2010 .
[46] Geoffrey Pritchard,et al. A Single-Settlement, Energy-Only Electric Power Market for Unpredictable and Intermittent Participants , 2010, Oper. Res..
[47] Erik Ela,et al. Evolution of Wholesale Electricity Market Design with Increasing Levels of Renewable Generation , 2014 .
[48] Neil Hewitt,et al. Estimating power plant start costs in cyclic operation , 2013 .
[49] William D'haeseleer,et al. Determining optimal electricity technology mix with high level of wind power penetration , 2011 .
[50] Stefan Scholtes,et al. Mathematical Programs with Complementarity Constraints: Stationarity, Optimality, and Sensitivity , 2000, Math. Oper. Res..
[51] Stephan Dempe,et al. Foundations of Bilevel Programming , 2002 .
[52] S. Wogrin,et al. Generation Capacity Expansion in Liberalized Electricity Markets: A Stochastic MPEC Approach , 2011, IEEE Transactions on Power Systems.
[53] S. Stoft. Power System Economics: Designing Markets for Electricity , 2002 .
[54] Pierre Pinson,et al. Electricity market clearing with improved scheduling of stochastic production , 2014, Eur. J. Oper. Res..
[55] Sarah M. Ryan,et al. Temporal Versus Stochastic Granularity in Thermal Generation Capacity Planning With Wind Power , 2014, IEEE Transactions on Power Systems.
[56] M. Shahidehpour,et al. Strategic Generation Capacity Expansion Planning With Incomplete Information , 2009, IEEE Transactions on Power Systems.
[57] V. Nanduri,et al. Generation Capacity Expansion in Energy Markets Using a Two-Level Game-Theoretic Model , 2009, IEEE Transactions on Power Systems.
[58] Mohammad Shahidehpour,et al. Generation expansion planning in wind-thermal power systems , 2010 .
[59] Andreas Ehrenmann,et al. Space and Time: Wind in an Investment Planning Model , 2006 .
[60] Bryan Palmintier,et al. Impact of unit commitment constraints on generation expansion planning with renewables , 2011, 2011 IEEE Power and Energy Society General Meeting.
[61] C. Floudas. Nonlinear and Mixed-Integer Optimization: Fundamentals and Applications , 1995 .
[62] ScheelHolger,et al. Mathematical Programs with Complementarity Constraints , 2000 .
[63] Yves Smeers,et al. Generation Capacity Expansion in a Risky Environment: A Stochastic Equilibrium Analysis , 2011, Oper. Res..
[64] Stephan Dempe,et al. Is bilevel programming a special case of a mathematical program with complementarity constraints? , 2012, Math. Program..
[65] C. Kongnam,et al. Development of Investment Strategies for Wind Power Generation , 2007, 2007 IEEE Canada Electrical Power Conference.
[66] Antonio J. Conejo,et al. Short-Term Trading for a Wind Power Producer , 2010 .