Production planning with order acceptance and demand uncertainty

Traditional production planning models assume that all orders must be satisfied when capacity is available. In this paper, we analyze the value of providing decision makers with the flexibility to accept or reject orders, when order quantity is uncertain. We introduce this demand flexibility in two production planning problems. The first problem integrates order acceptance in the capacitated lot sizing problem, providing the option to reject an order if it requires a high setup cost and cannot be aggregated with additional orders to take advantage of economies of scale. The second problem integrates order acceptance in the order release planning problem with load-dependent lead times (LDLTs). This problem provides the option to reject an order if it increases the workload causing the delay of other orders due to congestion effects. Robust counterparts of both integrated problems are formulated as linear mixed integer programs (MIPs). The deterministic integrated problems and their robust counterparts are shown to be NP-hard and a two-stage MIP heuristic is proposed as a solution procedure. A relax and fix (RF) heuristic is adapted to efficiently construct feasible solutions to the robust problems, which are then improved by a fix and optimize (FO) heuristic. Numerical results show that the proposed heuristics give promising results in terms of solution quality and computation time. Simulation experiments are conducted to assess the value of demand flexibility and to study the effects of various parameters on economical performance.

[1]  Reinaldo Morabito,et al.  Production planning in furniture settings via robust optimization , 2012, Comput. Oper. Res..

[2]  Joseph Geunes Demand Flexibility in Supply Chain Planning , 2012 .

[3]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[4]  Stephen C. Graves,et al.  A Tactical Planning Model for a Job Shop , 1986, Oper. Res..

[5]  Kerem Akartunali,et al.  A heuristic approach for big bucket multi-level production planning problems , 2009, Eur. J. Oper. Res..

[6]  Zhongping Zhai,et al.  The Order Selection and Lot Sizing Problem in the Make-to-Order Environment , 2011 .

[7]  Arkadi Nemirovski,et al.  Robust solutions of Linear Programming problems contaminated with uncertain data , 2000, Math. Program..

[8]  El-Houssaine Aghezzaf,et al.  Integrating order acceptance decisions with flexible due dates in a production planning model with load-dependent lead times , 2015 .

[9]  William W. Trigeiro,et al.  Capacitated lot sizing with setup times , 1989 .

[10]  Awi Federgruen,et al.  Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems , 1999 .

[11]  Hubert Missbauer,et al.  Bestandsregelung als Basis für eine Neugestaltung von PPS-Systemen , 1998 .

[12]  David L. Woodruff,et al.  Production planning with load dependent lead times , 2005, 4OR.

[13]  William S. Lovejoy,et al.  Quantity Flexibility Contracts and Supply Chain Performance , 1999, Manuf. Serv. Oper. Manag..

[14]  Rosa G. González-Ramírez,et al.  A heuristic approach for a multi-product capacitated lot-sizing problem with pricing , 2011 .

[15]  Ravi Anupindi,et al.  Analysis of supply contracts with total minimum commitment , 1997 .

[16]  Hubert Missbauer,et al.  Aggregate order release planning for time-varying demand , 2002 .

[17]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[18]  John R. Birge,et al.  Introduction to Stochastic Programming , 1997 .

[19]  Tarik Aouam,et al.  Integrated production planning and order acceptance under uncertainty: A robust optimization approach , 2013, Eur. J. Oper. Res..

[20]  Laurence A. Wolsey,et al.  The uncapacitated lot-sizing problem with sales and safety stocks , 2001, Math. Program..

[21]  Alain Bernard,et al.  Towards a holistic sustainability index for measuring sustainability of manufacturing companies , 2015 .

[22]  Reha Uzsoy,et al.  The impact of lot-sizing in multiple product environments with congestion , 2014 .

[23]  R. Uzsoy,et al.  Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times , 2012 .

[24]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[25]  Feng Chu,et al.  A forward algorithm for capacitated lot sizing problem with lost sales , 2004, Fifth World Congress on Intelligent Control and Automation (IEEE Cat. No.04EX788).

[26]  Anton J. Kleywegt,et al.  The Dynamic and Stochastic Knapsack Problem with Random Sized Items , 2001, Oper. Res..

[27]  Gerald L. Thompson,et al.  A Forward Algorithm for the Capacitated Lot Size Model with Stockouts , 1990, Oper. Res..

[28]  Reha Uzsoy,et al.  Zero-order production planning models with stochastic demand and workload-dependent lead times , 2015 .

[29]  C. Floudas,et al.  A Comparative Theoretical and Computational Study on Robust Counterpart Optimization: I. Robust Linear Optimization and Robust Mixed Integer Linear Optimization. , 2011, Industrial & engineering chemistry research.

[30]  Stéphane Dauzère-Pérès,et al.  Single-item dynamic lot-sizing problems: An updated survey , 2017, Eur. J. Oper. Res..

[31]  Joseph Geunes,et al.  Requirements Planning with Pricing and Order Selection Flexibility , 2006, Oper. Res..

[32]  Hans A. ten Kate,et al.  Towards a Better Understanding of Order Acceptance , 1994 .

[33]  Awi Federgruen,et al.  Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..

[34]  Deniz Aksen,et al.  Loss of customer goodwill in the uncapacitated lot-sizing problem , 2007, Comput. Oper. Res..

[35]  Reha Uzsoy,et al.  Using a mathematical programming model to examine the marginal price of capacitated resources , 2011 .

[36]  Harvey M. Wagner,et al.  Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..

[37]  Erwin W. Hans,et al.  Workload based order acceptance in job shop environments , 2005, OR Spectr..

[38]  J. Geunes,et al.  Uncapacitated production and location planning models with demand fulfillment flexibility , 2006 .

[39]  Dimitris Bertsimas,et al.  A Robust Optimization Approach to Inventory Theory , 2006, Oper. Res..

[40]  Raul Poler,et al.  Models for production planning under uncertainty: A review ☆ , 2006 .

[41]  Hartmut Stadtler,et al.  Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows , 2003, Oper. Res..

[42]  H. Romeijn,et al.  Demand Selection and Assignment Problems in Supply Chain Planning , 2005 .

[43]  Melvyn Sim,et al.  The Price of Robustness , 2004, Oper. Res..

[44]  Julia L. Higle,et al.  Production Planning Under Supply and Demand Uncertainty: A Stochastic Programming Approach , 2010 .

[45]  R. Uzsoy,et al.  Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.

[46]  Reha Uzsoy,et al.  Production planning with resources subject to congestion , 2009 .