Are deterministic methods suitable for short term reserve planning
暂无分享,去创建一个
[1] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[2] Roy Billinton,et al. A reliability framework for generating unit commitment , 2000 .
[3] Ronald N. Allan,et al. Bibliography on the Application of Probability Methods in Power System Reliability Evaluation 1996-1999 , 1984 .
[4] G. Sheblé,et al. Power generation operation and control — 2nd edition , 1996 .
[5] Brendan Kirby,et al. Operating reserves and bulk-power reliability , 1998 .
[6] J. Gheury,et al. Assessing the Impact of Operating Constraints and Operating Policy on the Reliability Level of a Generation System , 1996 .
[7] Allen J. Wood,et al. Power Generation, Operation, and Control , 1984 .
[8] Shmuel S. Oren,et al. Price-based adaptive spinning reserve requirements in power system scheduling 1 The authors remain solely responsible for the errors in this paper. This paper does not represent the views of PG&E or its members. 1 , 1999 .
[9] C.K. Pang,et al. Optimal short-term thermal unit commitment , 1976, IEEE Transactions on Power Apparatus and Systems.
[10] Fushuan Wen,et al. Coordination of bidding strategies in day-ahead energy and spinning reserve markets , 2002 .
[11] Lester H. Fink. Ancillary transmission services , 1996 .
[12] Eric Hirst,et al. Technical and Market Issues for Operating Reserves , 1999 .
[13] L. L. Garver. Reserve Planning Using Outage Probabilities and Load Uncertainties , 1970 .