Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using @ risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

[1]  Daniel W. Halpin,et al.  Pile construction productivity assessment , 2005 .

[2]  T. Mezher,et al.  Causes of delays in the construction industry in Lebanon , 1998 .

[3]  Mohammed Al-Aghbari,et al.  Factors Affecting Construction Speed of Industrialized Building System in Malaysia , 2005 .

[4]  Essam Zaneldin,et al.  Construction claims in United Arab Emirates: Types, causes, and frequency , 2006 .

[5]  Simaan M. AbouRizk,et al.  Estimating Labor Production Rates for Industrial Construction Activities , 2001 .

[6]  Awad S. Hanna,et al.  Early warning signs for distressed projects , 2005 .

[7]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[8]  W. J. Langford Statistical Methods , 1959, Nature.

[9]  Sławomir Biruk,et al.  THE CONCEPTUAL FRAMEWORK FOR CONSTRUCTION PROJECT RISK ASSESSMENT , 2011 .

[10]  David K. H. Chua,et al.  Model for Construction Budget Performance—Neural Network Approach , 1997 .

[11]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[12]  Daniel W. Halpin,et al.  Predictive Tool for Estimating Accident Risk , 2003 .

[13]  David K. H. Chua,et al.  Key determinants for construction schedule performance , 1999 .

[14]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[15]  Nashwan Dawood Estimating project and activity duration: a risk management approach using network analysis , 1998 .

[16]  Edward J. Jaselskis,et al.  Optimal Allocation of Project Management Resources for Achieving Success , 1991 .

[17]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[18]  Youngjae Kim,et al.  Delay Analysis Method using Delay Section , 2005 .

[19]  Abdulaziz A. Bubshait,et al.  Comparison of delay analysis methodologies , 1998 .

[20]  Paul. Olomolaiye,et al.  Attributes of UK construction clients influencing project consultants' performance , 1994 .

[21]  G. W. Snedecor Statistical Methods , 1964 .

[22]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[23]  James E. Rowings,et al.  Construction Labor Productivity Modeling with Neural Networks , 1998 .