Developing a quantitative construction waste estimation model for building construction projects

Abstract Construction and demolition waste is a major source of urban solid waste, frequently accounting for 10–30% of the total waste disposed of at landfills in many cities around the world. There is a recognized need to manage the construction waste in order to maintain a sustainable environment. The successful implementation of construction waste management depends on a number of factors. One critical factor is the need to accurately estimate waste generated from construction projects. In this regard, this paper proposes a quantitative construction waste estimation model for building construction projects, which can enhance the accuracy in the estimation of construction waste at the project level. In the development of this model, a theoretical analysis of the construction process and the construction waste generation process has been conducted. Specifically, this model integrates the mass balance principle, work breakdown structure, material quantity takeoff, conversion ratios between different waste measurement units, and the wastage levels of various materials used in different work packages. The proposed model is able to predict the quantities of various kinds of construction waste from a building project, to track the origin of construction waste (i.e., from which work package a particular kind of waste is generated and how much) and to help contractors investigate the potential improvements for waste management. An illustrative example is provided to demonstrate the application of this quantitative construction waste estimation model.

[1]  Vivian W Y Tam,et al.  On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.

[2]  Ali Touran,et al.  A systems analysis tool for construction and demolition wastes management. , 2004, Waste management.

[3]  Jianguang Shi,et al.  Estimation and forecasting of concrete debris amount in China , 2006 .

[4]  Paola Villoria Sáez,et al.  Assessing the accumulation of construction waste generation during residential building construction works , 2014 .

[5]  Tao Ding,et al.  Estimation of building-related construction and demolition waste in Shanghai. , 2014, Waste management.

[6]  Hjh Jos Brouwers,et al.  Construction Waste: Quantification and Source Evaluation , 1996 .

[7]  Jyh Dong Lin,et al.  Estimation of Construction Waste Generation and Management in Taiwan , 2011 .

[8]  Yashuai Li,et al.  Web-based construction waste estimation system for building construction projects , 2013 .

[9]  Shabbir H Gheewala,et al.  Estimation of construction waste generation and management in Thailand. , 2009, Waste management.

[10]  Jane L Hao,et al.  The effectiveness of Hong Kong's Construction Waste Disposal Charging Scheme , 2008, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[11]  David H.K. Chua,et al.  Use of a WBS Matrix to Improve Interface Management in Projects , 2006 .

[12]  C Llatas,et al.  A model for quantifying construction waste in projects according to the European waste list. , 2011, Waste management.

[13]  C S Poon,et al.  Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. , 2009, Waste management.

[14]  Xueqing Zhang Markov-Based Optimization Model for Building Facilities Management , 2006 .

[15]  Jaime Solís-Guzmán,et al.  A Spanish model for quantification and management of construction waste. , 2009, Waste management.

[16]  Sungkwon Woo,et al.  Flexible Work Breakdown Structure for Integrated Cost and Schedule Control , 2004 .

[17]  Po-Han Chen Integration of cost and schedule using extensive matrix method and spreadsheets , 2008 .

[18]  Konstantinos Moustakas,et al.  Generation and management of construction and demolition waste in Greece—an existing challenge , 2003 .

[19]  K.M. Cochran,et al.  Estimating construction and demolition debris generation using a materials flow analysis approach. , 2010, Waste management.

[20]  César Porras-Amores,et al.  Estimation of construction and demolition waste volume generation in new residential buildings in Spain , 2012, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[21]  Guiwen Liu,et al.  Quantifying construction and demolition waste: an analytical review. , 2014, Waste management.

[22]  P Agamuthu,et al.  Challenges in sustainable management of construction and demolition waste , 2008, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[23]  Chi Sun Poon,et al.  Management of construction waste in public housing projects in Hong Kong , 2004 .

[24]  Jiayuan Wang,et al.  A model for estimating construction waste generation index for building project in China , 2013 .

[25]  Issam Srour,et al.  A field based methodology for estimating waste generation rates at various stages of construction projects , 2015 .

[26]  Harold E. Marshall,et al.  UNIFORMAT II Elemental Classification for Building Specifications, Cost Estimating and Cost Analysis | NIST , 1999 .

[27]  Sangchul KimS. Kim,et al.  Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model , 2008 .

[28]  Amnon Katz,et al.  A novel methodology to estimate the evolution of construction waste in construction sites. , 2011, Waste management.