Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects
暂无分享,去创建一个
Markus König | Markus Thewes | Markus Scheffer | Alena Conrads | M. König | M. Thewes | M. Scheffer | Alena Conrads
[1] Antoine Grall,et al. On the Assessment of Performance and Robustness of Condition-Based Maintenance Strategies , 2016 .
[2] Julio C. Martinez. Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management , 2010 .
[3] Michael Alber,et al. Assessment of the LCPC abrasiveness test from the view of material science / Bewertung des LCPC-Abrasivitätstests aus werkstofftechnischer Sicht , 2015 .
[4] R. Marler,et al. The weighted sum method for multi-objective optimization: new insights , 2010 .
[5] Simaan M. AbouRizk,et al. Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain , 2011 .
[6] Sanford Friedenthal,et al. A Practical Guide to SysML: The Systems Modeling Language , 2008 .
[7] Simaan M. AbouRizk,et al. Unified Modeling Methodology for Construction Simulation , 2002 .
[8] Kurosch Thuro,et al. Suggestion of an empirical prognosis model for cutting tool wear of Hydroshield TBM , 2015 .
[9] Pål Drevland Jakobsen,et al. Development of the Soft Ground Abrasion Tester (SGAT) to predict TBM tool wear, torque and thrust , 2013 .
[10] Kurosch Thuro,et al. Classification of the abrasiveness of soil and rock , 2009 .
[11] Peter Jankovi. Agent-based Simulation for Creating Robust Plans and Schedules , 2015 .
[12] Michael Alber,et al. The RUB Tunneling Device – A newly developed test method to analyze and determine the wear of excavation tools in soils , 2016 .
[13] Bernhard Sendhoff,et al. Robust Optimization - A Comprehensive Survey , 2007 .
[14] Donghai Liu,et al. Schedule Risk Analysis for TBM Tunneling Based on Adaptive CYCLONE Simulation in a Geologic Uncertainty-Aware Context , 2015, J. Comput. Civ. Eng..
[15] Ulrich Maidl,et al. Abrasiveness and tool wear in shield tunnelling in soil / Abrasivität und Werkzeugverschleiß beim Schildvortrieb im Lockergestein , 2011 .
[16] Genichi Taguchi. System Of Experimental Design: Engineering Methods To Optimize Quality And Minimize Costs , 1987 .
[17] Samuel T. Ariaratnam,et al. Simulation modeling techniques for underground infrastructure construction processes , 2007 .
[18] Markus König,et al. Assessing maintenance strategies for cutting tool replacements in mechanized tunneling using process simulation , 2017, J. Simulation.
[19] P. Papalambros,et al. A NOTE ON WEIGHTED CRITERIA METHODS FOR COMPROMISE SOLUTIONS IN MULTI-OBJECTIVE OPTIMIZATION , 1996 .
[20] Tanja Clees,et al. Robustness Measures and Numerical Approximation of the Cumulative Density Function of Response Surfaces , 2014, Commun. Stat. Simul. Comput..
[21] Daniel W. Halpin,et al. CYCLONE — Method for Modeling Job Site Processes , 1977 .
[22] Markus König,et al. Simulation of maintenance strategies in mechanized tunneling , 2016, 2016 Winter Simulation Conference (WSC).
[23] Jack P. C. Kleijnen,et al. Robust Optimization in Simulation: Taguchi and Krige Combined , 2009, INFORMS J. Comput..
[24] John E. Mottershead,et al. A review of robust optimal design and its application in dynamics , 2005 .
[25] Werner Theisen,et al. Excavation tool concepts for TBMs – Understanding the material-dependent response to abrasive wear , 2017 .