Decision Policies for Production Networks

“The trend is your friend”is a practical principle often used by business managers, who seek to forecast future sales, expenditures, and profitability in order to make production and other operational decisions. The problem is how best to identify and discover business trends and utilize trend information for attaining objectives of firms. This book contains an Excel-based solution to this problem, applying principles of the authors’ “profit system model” of the firm that enables forecasts of trends in sales, expenditures, profits and other business variables. The program, called FIRM, which runs on Windows with Microsoft Excel 2010, useshistorical time series of total sales, total costs, and total assets of the firm from its financial statements (income statements and balance sheets), estimates relationships among these variables, and then employs the estimated relationships to forecasts trends in these vital business variables. Featuring step-by-step case examples, the goal is to equip business managers and students with easy-to-use tools for understanding and forecasting trends in important business variables, thereby empowering them to make better business decisions.

[1]  Peter Kall,et al.  Stochastic Programming , 1995 .

[2]  Thomas Hanschke,et al.  A queueing network based system to model capacity and cycle time for semiconductor fabrication , 2008, 2008 Winter Simulation Conference.

[3]  Karl G. Kempf,et al.  Supply Chain Collaboration Through Shared Capacity Models , 2006, Interfaces.

[4]  J.W. Fowler,et al.  Balanced Machine Workload Dispatching Scheme for Wafer Fab , 2007, 2007 IEEE/SEMI Advanced Semiconductor Manufacturing Conference.

[5]  M. D. Byrne,et al.  Production planning: An improved hybrid approach , 2005 .

[6]  M. A. Dummler Analysis of the nonstationary behavior of a wafer fab during product mix changes , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[7]  John R. Birge,et al.  Introduction to Stochastic Programming , 1997 .

[8]  Robert W. Atherton,et al.  Wafer Fabrication: Factory Performance and Analysis , 1995 .

[9]  Arkadi Nemirovski,et al.  Robust solutions of Linear Programming problems contaminated with uncertain data , 2000, Math. Program..

[10]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[11]  Francis J. Doyle,et al.  Analysis of linear programming in model predictive control , 2004, Comput. Chem. Eng..

[12]  Leon S. Lasdon,et al.  Optimization Theory of Large Systems , 1970 .

[13]  A. F. Veinott Optimal Policy for a Multi-product, Dynamic Non-Stationary Inventory Problem , 1965 .

[14]  A. Charnes,et al.  Chance-Constrained Programming , 1959 .

[15]  Xiande Zhao,et al.  Freezing the master production schedule for material requirements planning systems under demand uncertainty , 1993 .

[16]  Hubert Missbauer,et al.  Models of the transient behaviour of production units to optimize the aggregate material flow , 2009 .

[17]  Reha Uzsoy,et al.  An integrated production planning model with load-dependent lead-times and safety stocks , 2009, Comput. Chem. Eng..

[18]  C. C. Holt,et al.  A Linear Decision Rule for Production and Employment Scheduling , 1955 .

[19]  David A. Goodman,et al.  A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .

[20]  John W. Fowler,et al.  Capacity planning through queueing analysis and simulation-based statistical methods: a case study for semiconductor wafer fabs , 2011 .

[21]  Karl Johan Åström,et al.  Computer-Controlled Systems: Theory and Design , 1984 .

[22]  Kenneth Fordyce,et al.  Technology that upsets the social order — a paradigm shift in assigning lots to tools in a wafer fabricator — the transition from rules to optimization , 2008, 2008 Winter Simulation Conference.

[23]  S. E. Elmaghraby,et al.  The Planning and Scheduling of Production Systems , 1996 .

[24]  Reha Uzsoy,et al.  Using a mathematical programming model to examine the marginal price of capacitated resources , 2011 .

[25]  Manfred Morari,et al.  ∞-norm formulation of model predictive control problems , 1986, 1986 American Control Conference.

[26]  I Nyoman Pujawan,et al.  Schedule nervousness in a manufacturing system: a case study , 2004 .

[27]  Shang Zhi,et al.  A proof of the queueing formula: L=λW , 2001 .

[28]  Hubert Missbauer,et al.  Aggregate order release planning for time-varying demand , 2002 .

[29]  Awi Federgruen,et al.  An Inventory Model with Limited Production Capacity and Uncertain Demands II. The Discounted-Cost Criterion , 1986, Math. Oper. Res..

[30]  C P L Veeger,et al.  Predicting Cycle Time Distributions for Integrated Processing Workstations: An Aggregate Modeling Approach , 2011, IEEE Transactions on Semiconductor Manufacturing.

[31]  Hong Chen,et al.  Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication , 1988, Oper. Res..

[32]  H. C. Meal Safety Stocks in MRP Systems. , 1979 .

[33]  Mahmut Parlar,et al.  A stochastic production planning model with a dynamic chance constraint , 1985 .

[34]  Nasir Ahmed,et al.  Discrete Time Signals and Systems , 1983 .

[35]  Jacobus E. Rooda,et al.  Characterization of operational time variability using effective process times , 2003 .

[36]  M. Spearman An Analytic Congestion Model for Closed Production Systems with IFR Processing Times , 1991 .

[37]  Paul H. Zipkin,et al.  Foundations of Inventory Management , 2000 .

[38]  Joseph A. Orlicky,et al.  Material Requirements Planning: The New Way of Life in Production and Inventory Management , 1975 .

[39]  Jeffrey Miller Hedging the master schedule , 1979 .

[40]  Dimitris Bertsimas,et al.  Transient laws of non-stationary queueing systems and their applications , 1997, Queueing Syst. Theory Appl..

[41]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[42]  Carl M. Harris,et al.  Fundamentals of queueing theory , 1975 .

[43]  Reha Uzsoy,et al.  The Effects of Production Planning on the Dynamic Behavior of a Simple Supply Chain: An Experimental Study , 2011 .

[44]  Kenneth Fordyce,et al.  IBM Burlington's Logistics Management System , 1990 .

[45]  Christian A. Ringhofer,et al.  Control of Continuum Models of Production Systems , 2010, IEEE Transactions on Automatic Control.

[46]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[47]  Daniel P. Heyman,et al.  Stochastic models in operations research , 1982 .

[48]  Karl G. Kempf,et al.  Complexity, Uncertainty, and Opportunistic Scheduling , 1985, Conference on Artificial Intelligence Applications.

[49]  Thomas E. Morton,et al.  The Nonstationary Stochastic Lead-Time Inventory Problem: Near-Myopic Bounds, Heuristics, and Testing , 1996 .

[50]  R. Bixby,et al.  Short-Interval Detailed Production Scheduling in 300mm Semiconductor Manufacturing using Mixed Integer and Constraint Programming , 2006, The 17th Annual SEMI/IEEE ASMC 2006 Conference.

[51]  Andrew Plummer,et al.  Stability and robustness for discrete-time systems with control signal saturation , 2000 .

[52]  M. D. Byrne,et al.  Production planning using a hybrid simulation – analytical approach , 1999 .

[53]  Robert W. Grubbström,et al.  A net present value approach to safety stocks in planned production , 1998 .

[54]  Robert Ringel,et al.  Managing WIP and cycle time with the help of Loop Control , 2008, 2008 Winter Simulation Conference.

[55]  S. Karlin Dynamic Inventory Policy with Varying Stochastic Demands , 1960 .

[56]  Oleg Yu. Gusikhin,et al.  A hybridization of mathematical programming and dominance-driven enumeration for solving shift-selection and task-sequencing problems , 2010, Comput. Oper. Res..

[57]  R. Dishington The Conservation Law , 1998 .

[58]  George B. Dantzig,et al.  Decomposition Principle for Linear Programs , 1960 .

[59]  Stephen C. Graves,et al.  Safety stocks in manufacturing systems , 1987 .

[60]  Jeff Cox,et al.  The Goal: A Process of Ongoing Improvement , 1984 .

[61]  M. Ball,et al.  Available to Promise , 2004 .

[62]  David D. Yao,et al.  A Supply Network Model with Base-Stock Control and Service Requirements , 2000, Oper. Res..

[63]  Hubert Missbauer Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept , 2011 .

[64]  David Y. Burman,et al.  Performance analysis techniques for IC manufacturing lines , 1986, AT&T Technical Journal.

[65]  R. Uzsoy,et al.  An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms , 2012, IEEE Transactions on Semiconductor Manufacturing.

[66]  Oleg Yu. Gusikhin,et al.  A hybridization of Mathematical Programming and search techniques for integrated operation and workforce planning , 2007, 2007 IEEE International Conference on Systems, Man and Cybernetics.

[67]  Edward Yellig,et al.  Why Is It So Hard to Build and Validate Discrete Event Simulation Models of Manufacturing Facilities , 2011 .

[68]  Christian A. Ringhofer,et al.  A Continuum Model for a Re-entrant Factory , 2006, Oper. Res..

[69]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[70]  David L. Woodruff,et al.  Production planning with load dependent lead times , 2005, 4OR.

[71]  Hartmut Stadtler,et al.  Supply chain management and advanced planning--basics, overview and challenges , 2005, Eur. J. Oper. Res..

[72]  Gary L. Hogg,et al.  Workload control in the semiconductor industry , 2002 .

[73]  A. Charnes,et al.  Cost Horizons and Certainty Equivalents: An Approach to Stochastic Programming of Heating Oil , 1958 .

[74]  David Burden,et al.  Production-Inventory Systems: Planning and Control , 1979 .

[75]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[76]  Horand I. Gassmann,et al.  Mslip: A computer code for the multistage stochastic linear programming problem , 1990, Math. Program..

[77]  John R. Birge,et al.  Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs , 1985, Oper. Res..

[78]  Carlos F. Daganzo,et al.  A theory of supply chains , 2003 .

[79]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[80]  Stephen C. Graves,et al.  A Tactical Planning Model for a Job Shop , 1986, Oper. Res..

[81]  Paul H. Zipkin,et al.  Models for Design and Control of Stochastic, Multi-Item Batch Production Systems , 1986, Oper. Res..

[82]  Thomas Hanschke,et al.  Queueing Model Improves IBM's Semiconductor Capacity and Lead-Time Management , 2010, Interfaces.

[83]  Warren B. Powell,et al.  Stochastic and dynamic networks and routing , 1995 .

[84]  Roger J.-B. Wets,et al.  On decision rules in stochastic programming , 1974, Math. Program..

[85]  M. Herty,et al.  Network models for supply chains , 2005 .

[86]  Jwm Will Bertrand,et al.  A comparison of due-date selection rules , 1981 .

[87]  Laureano F. Escudero,et al.  Production planning via scenario modelling , 1993, Ann. Oper. Res..

[88]  Reha Uzsoy,et al.  Experimental Evaluation of Heuristic Optimization Algorithms: A Tutorial , 2001, J. Heuristics.

[89]  Richard F. Deckro,et al.  Goal Programming Approaches to Solving Linear Decision Rule Based Aggregate Production Planning Models , 1984 .

[90]  Alexandre Dolgui,et al.  Supply planning under uncertainties in MRP environments: A state of the art , 2007, Annu. Rev. Control..

[91]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .

[92]  Reha Uzsoy,et al.  An Exploratory Analysis of Two Iterative Linear Programming—Simulation Approaches for Production Planning , 2010, IEEE Transactions on Semiconductor Manufacturing.

[93]  Stéphane Dauzère-Pérès,et al.  An Integrated Approach in Production Planning and Scheduling , 1994 .

[94]  O. Gusikhin,et al.  Integration of Mobile RFID and Inertial Measurement for Indoor Tracking of Forklifts Moving Containers , 2009 .

[95]  Ari P. J. Vepsalainen Priority rules for job shops with weighted tardiness costs , 1987 .

[96]  Oleg Yu. Gusikhin,et al.  A Hybrid Approach for Solving Shift-Selection and Task-Sequencing Problems , 2008, CPAIOR.

[97]  A. G. Lockett,et al.  Job shop scheduling heuristics and frequency of scheduling , 1982 .

[98]  Michael A. Zazanis,et al.  Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..

[99]  Martin L. Puterman,et al.  Markov Decision Processes: Discrete Stochastic Dynamic Programming , 1994 .

[100]  Sooyoung Kim,et al.  Extended model for a hybrid production planning approach , 2001 .

[101]  Stephen C. H. Leung *,et al.  A robust optimization model for stochastic aggregate production planning , 2004 .

[102]  J.R. Morrison,et al.  Cycle Time Approximations for the G/G/m Queue Subject to Server Failures and Cycle Time Offsets with Applications , 2006, The 17th Annual SEMI/IEEE ASMC 2006 Conference.

[103]  Christos D. Tarantilis,et al.  Dynamic modeling and control of supply chain systems: A review , 2008, Comput. Oper. Res..

[104]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[105]  Gary J. Koehler,et al.  Genetic learning of dynamic scheduling within a simulation environment , 1994, Comput. Oper. Res..

[106]  T. Teichmann,et al.  The Measurement of Power Spectra , 1960 .

[107]  François V. Louveaux,et al.  A Solution Method for Multistage Stochastic Programs with Recourse with Application to an Energy Investment Problem , 1980, Oper. Res..

[108]  Stuart Bermon,et al.  Capacity Optimization Planning System (CAPS) , 1999, Interfaces.

[109]  Dimitris Bertsimas,et al.  A Robust Optimization Approach to Inventory Theory , 2006, Oper. Res..

[110]  P. Kuehn,et al.  Approximate Analysis of General Queuing Networks by Decomposition , 1979, IEEE Trans. Commun..

[111]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[112]  S. Tayur Computing the Optimal Policy for Capacitated Inventory Models , 1993 .

[113]  Robert C. Leachman,et al.  A general framework for modeling production , 1989 .

[114]  C. E. Agnew,et al.  Dynamic Modeling and Control of Congestion-Prone Systems , 1976, Oper. Res..

[115]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[116]  Chih-Ming Liu,et al.  Standard WIP Determination and WIP Balance Control with Time Constraints in Semiconductor Wafer Fabrication , 2008 .