Decision Policies for Production Networks
暂无分享,去创建一个
[1] Peter Kall,et al. Stochastic Programming , 1995 .
[2] Thomas Hanschke,et al. A queueing network based system to model capacity and cycle time for semiconductor fabrication , 2008, 2008 Winter Simulation Conference.
[3] Karl G. Kempf,et al. Supply Chain Collaboration Through Shared Capacity Models , 2006, Interfaces.
[4] J.W. Fowler,et al. Balanced Machine Workload Dispatching Scheme for Wafer Fab , 2007, 2007 IEEE/SEMI Advanced Semiconductor Manufacturing Conference.
[5] M. D. Byrne,et al. Production planning: An improved hybrid approach , 2005 .
[6] M. A. Dummler. Analysis of the nonstationary behavior of a wafer fab during product mix changes , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[7] John R. Birge,et al. Introduction to Stochastic Programming , 1997 .
[8] Robert W. Atherton,et al. Wafer Fabrication: Factory Performance and Analysis , 1995 .
[9] Arkadi Nemirovski,et al. Robust solutions of Linear Programming problems contaminated with uncertain data , 2000, Math. Program..
[10] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[11] Francis J. Doyle,et al. Analysis of linear programming in model predictive control , 2004, Comput. Chem. Eng..
[12] Leon S. Lasdon,et al. Optimization Theory of Large Systems , 1970 .
[13] A. F. Veinott. Optimal Policy for a Multi-product, Dynamic Non-Stationary Inventory Problem , 1965 .
[14] A. Charnes,et al. Chance-Constrained Programming , 1959 .
[15] Xiande Zhao,et al. Freezing the master production schedule for material requirements planning systems under demand uncertainty , 1993 .
[16] Hubert Missbauer,et al. Models of the transient behaviour of production units to optimize the aggregate material flow , 2009 .
[17] Reha Uzsoy,et al. An integrated production planning model with load-dependent lead-times and safety stocks , 2009, Comput. Chem. Eng..
[18] C. C. Holt,et al. A Linear Decision Rule for Production and Employment Scheduling , 1955 .
[19] David A. Goodman,et al. A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .
[20] John W. Fowler,et al. Capacity planning through queueing analysis and simulation-based statistical methods: a case study for semiconductor wafer fabs , 2011 .
[21] Karl Johan Åström,et al. Computer-Controlled Systems: Theory and Design , 1984 .
[22] Kenneth Fordyce,et al. Technology that upsets the social order — a paradigm shift in assigning lots to tools in a wafer fabricator — the transition from rules to optimization , 2008, 2008 Winter Simulation Conference.
[23] S. E. Elmaghraby,et al. The Planning and Scheduling of Production Systems , 1996 .
[24] Reha Uzsoy,et al. Using a mathematical programming model to examine the marginal price of capacitated resources , 2011 .
[25] Manfred Morari,et al. ∞-norm formulation of model predictive control problems , 1986, 1986 American Control Conference.
[26] I Nyoman Pujawan,et al. Schedule nervousness in a manufacturing system: a case study , 2004 .
[27] Shang Zhi,et al. A proof of the queueing formula: L=λW , 2001 .
[28] Hubert Missbauer,et al. Aggregate order release planning for time-varying demand , 2002 .
[29] Awi Federgruen,et al. An Inventory Model with Limited Production Capacity and Uncertain Demands II. The Discounted-Cost Criterion , 1986, Math. Oper. Res..
[30] C P L Veeger,et al. Predicting Cycle Time Distributions for Integrated Processing Workstations: An Aggregate Modeling Approach , 2011, IEEE Transactions on Semiconductor Manufacturing.
[31] Hong Chen,et al. Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication , 1988, Oper. Res..
[32] H. C. Meal. Safety Stocks in MRP Systems. , 1979 .
[33] Mahmut Parlar,et al. A stochastic production planning model with a dynamic chance constraint , 1985 .
[34] Nasir Ahmed,et al. Discrete Time Signals and Systems , 1983 .
[35] Jacobus E. Rooda,et al. Characterization of operational time variability using effective process times , 2003 .
[36] M. Spearman. An Analytic Congestion Model for Closed Production Systems with IFR Processing Times , 1991 .
[37] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[38] Joseph A. Orlicky,et al. Material Requirements Planning: The New Way of Life in Production and Inventory Management , 1975 .
[39] Jeffrey Miller. Hedging the master schedule , 1979 .
[40] Dimitris Bertsimas,et al. Transient laws of non-stationary queueing systems and their applications , 1997, Queueing Syst. Theory Appl..
[41] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[42] Carl M. Harris,et al. Fundamentals of queueing theory , 1975 .
[43] Reha Uzsoy,et al. The Effects of Production Planning on the Dynamic Behavior of a Simple Supply Chain: An Experimental Study , 2011 .
[44] Kenneth Fordyce,et al. IBM Burlington's Logistics Management System , 1990 .
[45] Christian A. Ringhofer,et al. Control of Continuum Models of Production Systems , 2010, IEEE Transactions on Automatic Control.
[46] Dean H. Kropp,et al. A comparison of strategies to dampen nervousness in MRP systems , 1986 .
[47] Daniel P. Heyman,et al. Stochastic models in operations research , 1982 .
[48] Karl G. Kempf,et al. Complexity, Uncertainty, and Opportunistic Scheduling , 1985, Conference on Artificial Intelligence Applications.
[49] Thomas E. Morton,et al. The Nonstationary Stochastic Lead-Time Inventory Problem: Near-Myopic Bounds, Heuristics, and Testing , 1996 .
[50] R. Bixby,et al. Short-Interval Detailed Production Scheduling in 300mm Semiconductor Manufacturing using Mixed Integer and Constraint Programming , 2006, The 17th Annual SEMI/IEEE ASMC 2006 Conference.
[51] Andrew Plummer,et al. Stability and robustness for discrete-time systems with control signal saturation , 2000 .
[52] M. D. Byrne,et al. Production planning using a hybrid simulation – analytical approach , 1999 .
[53] Robert W. Grubbström,et al. A net present value approach to safety stocks in planned production , 1998 .
[54] Robert Ringel,et al. Managing WIP and cycle time with the help of Loop Control , 2008, 2008 Winter Simulation Conference.
[55] S. Karlin. Dynamic Inventory Policy with Varying Stochastic Demands , 1960 .
[56] Oleg Yu. Gusikhin,et al. A hybridization of mathematical programming and dominance-driven enumeration for solving shift-selection and task-sequencing problems , 2010, Comput. Oper. Res..
[57] R. Dishington. The Conservation Law , 1998 .
[58] George B. Dantzig,et al. Decomposition Principle for Linear Programs , 1960 .
[59] Stephen C. Graves,et al. Safety stocks in manufacturing systems , 1987 .
[60] Jeff Cox,et al. The Goal: A Process of Ongoing Improvement , 1984 .
[61] M. Ball,et al. Available to Promise , 2004 .
[62] David D. Yao,et al. A Supply Network Model with Base-Stock Control and Service Requirements , 2000, Oper. Res..
[63] Hubert Missbauer. Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept , 2011 .
[64] David Y. Burman,et al. Performance analysis techniques for IC manufacturing lines , 1986, AT&T Technical Journal.
[65] R. Uzsoy,et al. An Experimental Comparison of Production Planning Using Clearing Functions and Iterative Linear Programming-Simulation Algorithms , 2012, IEEE Transactions on Semiconductor Manufacturing.
[66] Oleg Yu. Gusikhin,et al. A hybridization of Mathematical Programming and search techniques for integrated operation and workforce planning , 2007, 2007 IEEE International Conference on Systems, Man and Cybernetics.
[67] Edward Yellig,et al. Why Is It So Hard to Build and Validate Discrete Event Simulation Models of Manufacturing Facilities , 2011 .
[68] Christian A. Ringhofer,et al. A Continuum Model for a Re-entrant Factory , 2006, Oper. Res..
[69] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[70] David L. Woodruff,et al. Production planning with load dependent lead times , 2005, 4OR.
[71] Hartmut Stadtler,et al. Supply chain management and advanced planning--basics, overview and challenges , 2005, Eur. J. Oper. Res..
[72] Gary L. Hogg,et al. Workload control in the semiconductor industry , 2002 .
[73] A. Charnes,et al. Cost Horizons and Certainty Equivalents: An Approach to Stochastic Programming of Heating Oil , 1958 .
[74] David Burden,et al. Production-Inventory Systems: Planning and Control , 1979 .
[75] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[76] Horand I. Gassmann,et al. Mslip: A computer code for the multistage stochastic linear programming problem , 1990, Math. Program..
[77] John R. Birge,et al. Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs , 1985, Oper. Res..
[78] Carlos F. Daganzo,et al. A theory of supply chains , 2003 .
[79] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[80] Stephen C. Graves,et al. A Tactical Planning Model for a Job Shop , 1986, Oper. Res..
[81] Paul H. Zipkin,et al. Models for Design and Control of Stochastic, Multi-Item Batch Production Systems , 1986, Oper. Res..
[82] Thomas Hanschke,et al. Queueing Model Improves IBM's Semiconductor Capacity and Lead-Time Management , 2010, Interfaces.
[83] Warren B. Powell,et al. Stochastic and dynamic networks and routing , 1995 .
[84] Roger J.-B. Wets,et al. On decision rules in stochastic programming , 1974, Math. Program..
[85] M. Herty,et al. Network models for supply chains , 2005 .
[86] Jwm Will Bertrand,et al. A comparison of due-date selection rules , 1981 .
[87] Laureano F. Escudero,et al. Production planning via scenario modelling , 1993, Ann. Oper. Res..
[88] Reha Uzsoy,et al. Experimental Evaluation of Heuristic Optimization Algorithms: A Tutorial , 2001, J. Heuristics.
[89] Richard F. Deckro,et al. Goal Programming Approaches to Solving Linear Decision Rule Based Aggregate Production Planning Models , 1984 .
[90] Alexandre Dolgui,et al. Supply planning under uncertainties in MRP environments: A state of the art , 2007, Annu. Rev. Control..
[91] Mauricio G. C. Resende,et al. Closed-loop job release control for VLSI circuit manufacturing , 1988 .
[92] Reha Uzsoy,et al. An Exploratory Analysis of Two Iterative Linear Programming—Simulation Approaches for Production Planning , 2010, IEEE Transactions on Semiconductor Manufacturing.
[93] Stéphane Dauzère-Pérès,et al. An Integrated Approach in Production Planning and Scheduling , 1994 .
[94] O. Gusikhin,et al. Integration of Mobile RFID and Inertial Measurement for Indoor Tracking of Forklifts Moving Containers , 2009 .
[95] Ari P. J. Vepsalainen. Priority rules for job shops with weighted tardiness costs , 1987 .
[96] Oleg Yu. Gusikhin,et al. A Hybrid Approach for Solving Shift-Selection and Task-Sequencing Problems , 2008, CPAIOR.
[97] A. G. Lockett,et al. Job shop scheduling heuristics and frequency of scheduling , 1982 .
[98] Michael A. Zazanis,et al. Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..
[99] Martin L. Puterman,et al. Markov Decision Processes: Discrete Stochastic Dynamic Programming , 1994 .
[100] Sooyoung Kim,et al. Extended model for a hybrid production planning approach , 2001 .
[101] Stephen C. H. Leung *,et al. A robust optimization model for stochastic aggregate production planning , 2004 .
[102] J.R. Morrison,et al. Cycle Time Approximations for the G/G/m Queue Subject to Server Failures and Cycle Time Offsets with Applications , 2006, The 17th Annual SEMI/IEEE ASMC 2006 Conference.
[103] Christos D. Tarantilis,et al. Dynamic modeling and control of supply chain systems: A review , 2008, Comput. Oper. Res..
[104] David L. Woodruff,et al. Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .
[105] Gary J. Koehler,et al. Genetic learning of dynamic scheduling within a simulation environment , 1994, Comput. Oper. Res..
[106] T. Teichmann,et al. The Measurement of Power Spectra , 1960 .
[107] François V. Louveaux,et al. A Solution Method for Multistage Stochastic Programs with Recourse with Application to an Energy Investment Problem , 1980, Oper. Res..
[108] Stuart Bermon,et al. Capacity Optimization Planning System (CAPS) , 1999, Interfaces.
[109] Dimitris Bertsimas,et al. A Robust Optimization Approach to Inventory Theory , 2006, Oper. Res..
[110] P. Kuehn,et al. Approximate Analysis of General Queuing Networks by Decomposition , 1979, IEEE Trans. Commun..
[111] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[112] S. Tayur. Computing the Optimal Policy for Capacitated Inventory Models , 1993 .
[113] Robert C. Leachman,et al. A general framework for modeling production , 1989 .
[114] C. E. Agnew,et al. Dynamic Modeling and Control of Congestion-Prone Systems , 1976, Oper. Res..
[115] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[116] Chih-Ming Liu,et al. Standard WIP Determination and WIP Balance Control with Time Constraints in Semiconductor Wafer Fabrication , 2008 .