A business planning model to access the tradeoff between inventory and capacity for a Stage 1 manufacturing process
暂无分享,去创建一个
Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1995, and Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1995.