Advances in the Theory and Practice of Production Scheduling

[1]  Terry Williams,et al.  Operations Management: Production of Goods and Services , 1980 .

[2]  W. M. Wonham,et al.  The control of discrete event systems , 1989 .

[3]  Kenneth Kivenko Managing work-in-process inventory , 1981 .

[4]  D. W. Luse A Nyquist-type stability test for multivariable distributed systems , 1988 .

[5]  Robert G. Sargent Event Graph Modelling for Simulation with an Application to Flexible Manufacturing Systems , 1988 .

[6]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[7]  Onésimo Hernández-Lerma,et al.  Controlled Markov Processes , 1965 .

[8]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[9]  Yu-Chi Ho Editorial: Basic research, manufacturing automation, and putting the cart before the horse , 1987 .

[10]  Michael J. Shaw A pattern-directed approach to FMS scheduling , 1988 .

[11]  Egon Balas,et al.  The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .

[12]  Y. Ho,et al.  Smoothed (conditional) perturbation analysis of discrete event dynamical systems , 1987 .

[13]  E. W. Davis,et al.  Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .

[14]  G. Thompson,et al.  Algorithms for Solving Production-Scheduling Problems , 1960 .

[15]  George William Plossl,et al.  Production and Inventory Control; Principles and Techniques , 1976 .

[16]  Osamu Kimura,et al.  Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .

[17]  Yu-Chi Ho,et al.  Performance evaluation and perturbation analysis of discrete event dynamic systems , 1987 .

[18]  J. Buzacott "Optimal" operating rules for automated manufacturing systems , 1980 .

[19]  Jr. Shaler Stidham Optimal control of admission to a queueing system , 1985 .

[20]  Stanley B. Gershwin,et al.  Performance of hierarchical production scheduling policy , 1984 .

[21]  Cliff T. Ragsdale The current state of network simulation in project management theory and practice , 1989 .

[22]  Steven A. Vere,et al.  Planning in Time: Windows and Durations for Activities and Goals , 1983, IEEE Transactions on Pattern Analysis and Machine Intelligence.

[23]  Richard Bellman,et al.  Mathematical Aspects Of Scheduling And Applications , 1982 .

[24]  K. N. Srikanth,et al.  A comparison of analytic and knowledge-based approaches to closed-shop scheduling , 1989 .

[25]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[26]  J. Quadrat,et al.  A linear-system-theoretic view of discrete-event processes , 1983, The 22nd IEEE Conference on Decision and Control.

[27]  Geoff Buxey,et al.  Production scheduling: Practice and theory , 1989 .

[28]  K. Preston White,et al.  DESIGN REQUIREMENTS FOR A REAL-TIME PRODUCTION SCHEDULING DECISION AID. , 1986 .

[29]  Heimo H. Adelsberger,et al.  Expert systems in production scheduling , 1987 .

[30]  Rolf H. Möhring,et al.  Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time , 1984, Oper. Res..

[31]  James E. Day,et al.  Review of sequencing research , 1970 .

[32]  Kenneth N. McKay,et al.  Job-Shop Scheduling Theory: What Is Relevant? , 1988 .

[33]  Jean-Marie Proth,et al.  Performance evaluation of job-shop systems using timed event-graphs , 1989 .

[34]  C. Dennis Pegden,et al.  A survey and evaluation of static flowshop scheduling heuristics , 1984 .

[35]  Uday S. Karmarkar,et al.  Lot-Sizing and Lead-time Performance in a Manufacturing Cell , 1985 .

[36]  P. Schweitzer,et al.  Part selection policy for a flexible manufacturing cell feeding several production lines , 1984 .

[37]  Yu-Chi Ho,et al.  Sensitivity analysis and optimization of throughput in a production line with blocking , 1987 .

[38]  The predictability of discrete event systems , 1989 .

[39]  R. P. Mohanty,et al.  Multiple projects-multiple resources-constrained scheduling: some studies , 1989 .

[40]  John J. Grefenstette Proceedings of the First International Conference on Genetic Algorithms and their Applications, July 24-26, 1985, at the Carnegie-Mellon University, Pittsburgh, PA , 1988 .

[41]  P. Mellor,et al.  A Review of Job Shop Scheduling , 1966 .

[42]  Egon Balas,et al.  PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS. , 1968 .

[43]  S. S. Panwalkar,et al.  Sequencing Research and the Industrial Scheduling Problem , 1973 .

[44]  Brenda L. Dietrich,et al.  An application of a hybrid approach to modeling a flexible manufacturing system , 1985 .

[45]  Christine M. Mitchell,et al.  Decision models for aiding FMS scheduling and control , 1988, IEEE Trans. Syst. Man Cybern..

[46]  Raymond A. Cuninghame-Green,et al.  Projections in minimax algebra , 1976, Math. Program..

[47]  Michael J. Shaw,et al.  An Artificial Intelligence Approach to the Scheduling of Flexible Manufacturing Systems , 1989 .

[48]  Kevin Mahon,et al.  Deterministic and Stochastic Scheduling , 1983 .

[49]  David D. Yao,et al.  Modeling a class of state-dependent routing in flexible manufacturing systems , 1985 .

[50]  C. Cassandras,et al.  An event domain formalism for sample path perturbation analysis of discrete event dynamic systems , 1985 .

[51]  Dimitri P. Bertsekas,et al.  Dynamic Programming and Stochastic Control , 1977, IEEE Transactions on Systems, Man, and Cybernetics.

[52]  Jean B. Lasserre,et al.  Technical Note - The Stochastic Discrete Dynamic Lot Size Problem: An Open-Loop Solution , 1985, Oper. Res..

[53]  Joseph J. Moder,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[54]  A. S. Spachis,et al.  Heuristics for flow-shop scheduling , 1980 .

[55]  Abraham Seidmann,et al.  Performance evaluation of flexible manufacturing systems , 1984, IEEE Transactions on Systems, Man, and Cybernetics.

[56]  A. Segall,et al.  An optimal control approach to dynamic routing in networks , 1982 .

[57]  Daniel P. Heyman,et al.  Stochastic models in operations research , 1982 .

[58]  Ernest Koenigsberg,et al.  Twenty Five Years of Cyclic Queues and Closed Queue Networks: A Review , 1982 .

[59]  Cyrus Derman,et al.  Finite State Markovian Decision Processes , 1970 .

[60]  C. T. Baker,et al.  Simulation of a Simplified Job Shop , 1960 .

[61]  Christos G. Cassandras,et al.  Infinitesimal and finite perturbation analysis for queueing networks , 1982, 1982 21st IEEE Conference on Decision and Control.

[62]  Iie Amar Dev Amar Senior Member,et al.  Simulated Versus Real Life Data in Testing the Efficiency of Scheduling Algorithms , 1986 .

[63]  E. H. Bowman THE SCHEDULE-SEQUENCING PROBLEM* , 1959 .

[64]  Christos G. Cassandras,et al.  A new approach to the analysis of discrete event dynamic systems , 1983, Autom..

[65]  Donald A. Waterman,et al.  A Guide to Expert Systems , 1986 .

[66]  Pietro Laface,et al.  A Rule-Based System to Schedule Production , 1986, Computer.

[67]  R. D. Hurrion An Investigation of Visual Interactive Simulation Methods Using the Job-Shop Scheduling Problem , 1978 .

[68]  Michael Jeng-Ping Shaw,et al.  FMS scheduling as cooperative problem solving , 1989 .

[69]  Don T. Phillips,et al.  A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .

[70]  S. Gershwin,et al.  A control perspective on recent trends in manufacturing systems , 1986, IEEE Control Systems Magazine.

[71]  Robert E. Shannon Artificial Intelligence and Simulation , 1984 .

[72]  Y. Ho,et al.  Extensions of infinitesimal perturbation analysis , 1988 .

[73]  P. Ramadge Some tractable supervisory control problems for discrete-event systems modeled by Buchi automata , 1989 .

[74]  Albert Jones,et al.  Real-time optimization in automated manufacturing facilities , 1986 .

[75]  J. D. Wiest,et al.  A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .

[76]  B. Vinod,et al.  The optimal design of flexible manufacturing systems , 1985 .

[77]  Albert Jones,et al.  An Architecture for Decision Making in the Factory of the Future , 1987 .

[78]  Jeffrey R. Barker,et al.  Scheduling the General Job-Shop , 1985 .

[79]  Peter R. Winters,et al.  Constrained Inventory Rules for Production Smoothing , 1962 .

[80]  Stephen C. Graves,et al.  Safety stocks in manufacturing systems , 1987 .

[81]  James Lyle Peterson,et al.  Petri net theory and the modeling of systems , 1981 .

[82]  D. Yao,et al.  The Optimal Input Rates To A System Of Manufacturing Cells , 1987 .

[83]  Richard Schonberger,et al.  World class manufacturing : the lessons of simplicity applied , 1986 .

[84]  David D. Yao,et al.  Optimal dynamic scheduling in Jackson networks , 1989 .

[85]  Eliyahu M. Goldratt,et al.  Computerized shop floor scheduling , 1988 .

[86]  Donald L. Iglehart,et al.  Simulation methods for queues: An overview , 1988, Queueing Syst. Theory Appl..

[87]  T. J. Grant,et al.  Lessons for O.R. from A.I.: A Scheduling Case Study , 1986 .

[88]  R. E. Mortensen,et al.  Optimal estimation for statistical geodesy , 1980 .

[89]  Klaus Neumann,et al.  Schedule-an expert-like system for machine scheduling , 1988 .

[90]  K. P. White,et al.  Manufacturing systems engineering: a second industrial revolutiona? , 1989 .

[91]  William S. Gere Heuristics in Job Shop Scheduling , 1966 .

[92]  Alan S. Manne,et al.  On the Job-Shop Scheduling Problem , 1960 .

[93]  Bruce M. Woodworth,et al.  Identifying the critical sequence in a resource constrained project , 1988 .

[94]  Kathryn E. Stecke,et al.  Loading and control policies for a flexible manufacturing system , 1981 .

[95]  Michael J. Shaw Knowledge-based scheduling in flexible manufacturing systems , 1987 .

[96]  Abraham Seidmann,et al.  Optimal queueing systems controls with finite buffers and with multiple component cost functions , 1989, IEEE Trans. Syst. Man Cybern..

[97]  H. Albert Napier,et al.  Optimal Multi-Level Lot Sizing for Requirements Planning Systems , 1980 .

[98]  P. R. Kumar,et al.  Optimal control of a queueing system with two heterogeneous servers , 1984 .

[99]  Richard F. Deckro,et al.  Resource constrained project crashing , 1989 .

[100]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[101]  J. Carlier,et al.  An algorithm for solving the job-shop problem , 1989 .

[102]  K. Preston White,et al.  A recent survey of production scheduling , 1988, IEEE Trans. Syst. Man Cybern..

[103]  Stanley B. Gershwin,et al.  Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.

[104]  D. Golenko-Ginzburg Controlled alternative activity networks for project management , 1988 .

[105]  Stephen C. Graves,et al.  A Review of Production Scheduling , 1981, Oper. Res..

[106]  J. A. Buzacott,et al.  Modelling the performance of flexible manufacturing systems , 1985 .

[107]  P. Ramadge,et al.  Supervisory control of a class of discrete event processes , 1987 .

[108]  Austin J. Lemoine State-of-the-Art---Networks of Queues---A Survey of Equilibrium Analysis , 1977 .

[109]  C. Desclaux,et al.  Supervisory control of discrete-event processes with partial observations , 1988 .

[110]  Rolf H. Möhring,et al.  Scheduling project networks with resource constraints and time windows , 1988 .

[111]  B. Carré An Algebra for Network Routing Problems , 1971 .

[112]  Edward A. Silver,et al.  A Heuristic for Multiple Lot Sizing For an Order Under Variable Yield , 1986 .

[113]  John L. Colley,et al.  Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System , 1966 .

[114]  Panos Afentakis Simultaneous lot sizing and sequencing for multistage production systems , 1985 .

[115]  Y. C. Ho,et al.  A survey of the perturbation analysis of discrete event dynamic systems , 1985 .

[116]  Lawrence Davis,et al.  Job Shop Scheduling with Genetic Algorithms , 1985, ICGA.

[117]  R. A. Cuninghame-Green,et al.  Describing Industrial Processes with Interference and Approximating Their Steady-State Behaviour , 1962 .

[118]  Oded Maimon,et al.  Control of large discrete event systems: constructive algorithms , 1989 .

[119]  Leon F. McGinnis,et al.  A Critique of Project Planning with Constrained Resources , 1973 .

[120]  Perturbation analysis explained , 1987, 26th IEEE Conference on Decision and Control.

[121]  David D. Yao,et al.  Decentralized control of service rates in a closed Jackson network , 1989 .

[122]  A. S. Spachis,et al.  Job-shop scheduling heuristics with local neighbourhood search , 1979 .

[123]  Edward W. Davis,et al.  Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .

[124]  F. Radermacher Scheduling of project networks , 1985 .

[125]  A. Kan Machine Scheduling Problems: Classification, Complexity and Computations , 1976 .

[126]  Salah E. Elmaghraby,et al.  Activity networks: Project planning and control by network models , 1977 .

[127]  G. Rand Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .

[128]  Stephen F. Smith,et al.  Constructing and Maintaining Detailed Production Plans: Investigations into the Development of Knowledge-Based Factory Scheduling Systems , 1986, AI Mag..

[129]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[130]  Brian D. Ripley,et al.  Simulation methodology — An introduction for queueing theorists , 1988, Queueing Syst. Theory Appl..

[131]  Kathryn E. Stecke,et al.  The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multiserver Queues , 1985, Oper. Res..