Advances in the Theory and Practice of Production Scheduling
暂无分享,去创建一个
[1] Terry Williams,et al. Operations Management: Production of Goods and Services , 1980 .
[2] W. M. Wonham,et al. The control of discrete event systems , 1989 .
[3] Kenneth Kivenko. Managing work-in-process inventory , 1981 .
[4] D. W. Luse. A Nyquist-type stability test for multivariable distributed systems , 1988 .
[5] Robert G. Sargent. Event Graph Modelling for Simulation with an Application to Flexible Manufacturing Systems , 1988 .
[6] Frederick S. Hillier,et al. Introduction of Operations Research , 1967 .
[7] Onésimo Hernández-Lerma,et al. Controlled Markov Processes , 1965 .
[8] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[9] Yu-Chi Ho. Editorial: Basic research, manufacturing automation, and putting the cart before the horse , 1987 .
[10] Michael J. Shaw. A pattern-directed approach to FMS scheduling , 1988 .
[11] Egon Balas,et al. The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .
[12] Y. Ho,et al. Smoothed (conditional) perturbation analysis of discrete event dynamical systems , 1987 .
[13] E. W. Davis,et al. Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .
[14] G. Thompson,et al. Algorithms for Solving Production-Scheduling Problems , 1960 .
[15] George William Plossl,et al. Production and Inventory Control; Principles and Techniques , 1976 .
[16] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[17] Yu-Chi Ho,et al. Performance evaluation and perturbation analysis of discrete event dynamic systems , 1987 .
[18] J. Buzacott. "Optimal" operating rules for automated manufacturing systems , 1980 .
[19] Jr. Shaler Stidham. Optimal control of admission to a queueing system , 1985 .
[20] Stanley B. Gershwin,et al. Performance of hierarchical production scheduling policy , 1984 .
[21] Cliff T. Ragsdale. The current state of network simulation in project management theory and practice , 1989 .
[22] Steven A. Vere,et al. Planning in Time: Windows and Durations for Activities and Goals , 1983, IEEE Transactions on Pattern Analysis and Machine Intelligence.
[23] Richard Bellman,et al. Mathematical Aspects Of Scheduling And Applications , 1982 .
[24] K. N. Srikanth,et al. A comparison of analytic and knowledge-based approaches to closed-shop scheduling , 1989 .
[25] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[26] J. Quadrat,et al. A linear-system-theoretic view of discrete-event processes , 1983, The 22nd IEEE Conference on Decision and Control.
[27] Geoff Buxey,et al. Production scheduling: Practice and theory , 1989 .
[28] K. Preston White,et al. DESIGN REQUIREMENTS FOR A REAL-TIME PRODUCTION SCHEDULING DECISION AID. , 1986 .
[29] Heimo H. Adelsberger,et al. Expert systems in production scheduling , 1987 .
[30] Rolf H. Möhring,et al. Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time , 1984, Oper. Res..
[31] James E. Day,et al. Review of sequencing research , 1970 .
[32] Kenneth N. McKay,et al. Job-Shop Scheduling Theory: What Is Relevant? , 1988 .
[33] Jean-Marie Proth,et al. Performance evaluation of job-shop systems using timed event-graphs , 1989 .
[34] C. Dennis Pegden,et al. A survey and evaluation of static flowshop scheduling heuristics , 1984 .
[35] Uday S. Karmarkar,et al. Lot-Sizing and Lead-time Performance in a Manufacturing Cell , 1985 .
[36] P. Schweitzer,et al. Part selection policy for a flexible manufacturing cell feeding several production lines , 1984 .
[37] Yu-Chi Ho,et al. Sensitivity analysis and optimization of throughput in a production line with blocking , 1987 .
[38] The predictability of discrete event systems , 1989 .
[39] R. P. Mohanty,et al. Multiple projects-multiple resources-constrained scheduling: some studies , 1989 .
[40] John J. Grefenstette. Proceedings of the First International Conference on Genetic Algorithms and their Applications, July 24-26, 1985, at the Carnegie-Mellon University, Pittsburgh, PA , 1988 .
[41] P. Mellor,et al. A Review of Job Shop Scheduling , 1966 .
[42] Egon Balas,et al. PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS. , 1968 .
[43] S. S. Panwalkar,et al. Sequencing Research and the Industrial Scheduling Problem , 1973 .
[44] Brenda L. Dietrich,et al. An application of a hybrid approach to modeling a flexible manufacturing system , 1985 .
[45] Christine M. Mitchell,et al. Decision models for aiding FMS scheduling and control , 1988, IEEE Trans. Syst. Man Cybern..
[46] Raymond A. Cuninghame-Green,et al. Projections in minimax algebra , 1976, Math. Program..
[47] Michael J. Shaw,et al. An Artificial Intelligence Approach to the Scheduling of Flexible Manufacturing Systems , 1989 .
[48] Kevin Mahon,et al. Deterministic and Stochastic Scheduling , 1983 .
[49] David D. Yao,et al. Modeling a class of state-dependent routing in flexible manufacturing systems , 1985 .
[50] C. Cassandras,et al. An event domain formalism for sample path perturbation analysis of discrete event dynamic systems , 1985 .
[51] Dimitri P. Bertsekas,et al. Dynamic Programming and Stochastic Control , 1977, IEEE Transactions on Systems, Man, and Cybernetics.
[52] Jean B. Lasserre,et al. Technical Note - The Stochastic Discrete Dynamic Lot Size Problem: An Open-Loop Solution , 1985, Oper. Res..
[53] Joseph J. Moder,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[54] A. S. Spachis,et al. Heuristics for flow-shop scheduling , 1980 .
[55] Abraham Seidmann,et al. Performance evaluation of flexible manufacturing systems , 1984, IEEE Transactions on Systems, Man, and Cybernetics.
[56] A. Segall,et al. An optimal control approach to dynamic routing in networks , 1982 .
[57] Daniel P. Heyman,et al. Stochastic models in operations research , 1982 .
[58] Ernest Koenigsberg,et al. Twenty Five Years of Cyclic Queues and Closed Queue Networks: A Review , 1982 .
[59] Cyrus Derman,et al. Finite State Markovian Decision Processes , 1970 .
[60] C. T. Baker,et al. Simulation of a Simplified Job Shop , 1960 .
[61] Christos G. Cassandras,et al. Infinitesimal and finite perturbation analysis for queueing networks , 1982, 1982 21st IEEE Conference on Decision and Control.
[62] Iie Amar Dev Amar Senior Member,et al. Simulated Versus Real Life Data in Testing the Efficiency of Scheduling Algorithms , 1986 .
[63] E. H. Bowman. THE SCHEDULE-SEQUENCING PROBLEM* , 1959 .
[64] Christos G. Cassandras,et al. A new approach to the analysis of discrete event dynamic systems , 1983, Autom..
[65] Donald A. Waterman,et al. A Guide to Expert Systems , 1986 .
[66] Pietro Laface,et al. A Rule-Based System to Schedule Production , 1986, Computer.
[67] R. D. Hurrion. An Investigation of Visual Interactive Simulation Methods Using the Job-Shop Scheduling Problem , 1978 .
[68] Michael Jeng-Ping Shaw,et al. FMS scheduling as cooperative problem solving , 1989 .
[69] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[70] S. Gershwin,et al. A control perspective on recent trends in manufacturing systems , 1986, IEEE Control Systems Magazine.
[71] Robert E. Shannon. Artificial Intelligence and Simulation , 1984 .
[72] Y. Ho,et al. Extensions of infinitesimal perturbation analysis , 1988 .
[73] P. Ramadge. Some tractable supervisory control problems for discrete-event systems modeled by Buchi automata , 1989 .
[74] Albert Jones,et al. Real-time optimization in automated manufacturing facilities , 1986 .
[75] J. D. Wiest,et al. A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .
[76] B. Vinod,et al. The optimal design of flexible manufacturing systems , 1985 .
[77] Albert Jones,et al. An Architecture for Decision Making in the Factory of the Future , 1987 .
[78] Jeffrey R. Barker,et al. Scheduling the General Job-Shop , 1985 .
[79] Peter R. Winters,et al. Constrained Inventory Rules for Production Smoothing , 1962 .
[80] Stephen C. Graves,et al. Safety stocks in manufacturing systems , 1987 .
[81] James Lyle Peterson,et al. Petri net theory and the modeling of systems , 1981 .
[82] D. Yao,et al. The Optimal Input Rates To A System Of Manufacturing Cells , 1987 .
[83] Richard Schonberger,et al. World class manufacturing : the lessons of simplicity applied , 1986 .
[84] David D. Yao,et al. Optimal dynamic scheduling in Jackson networks , 1989 .
[85] Eliyahu M. Goldratt,et al. Computerized shop floor scheduling , 1988 .
[86] Donald L. Iglehart,et al. Simulation methods for queues: An overview , 1988, Queueing Syst. Theory Appl..
[87] T. J. Grant,et al. Lessons for O.R. from A.I.: A Scheduling Case Study , 1986 .
[88] R. E. Mortensen,et al. Optimal estimation for statistical geodesy , 1980 .
[89] Klaus Neumann,et al. Schedule-an expert-like system for machine scheduling , 1988 .
[90] K. P. White,et al. Manufacturing systems engineering: a second industrial revolutiona? , 1989 .
[91] William S. Gere. Heuristics in Job Shop Scheduling , 1966 .
[92] Alan S. Manne,et al. On the Job-Shop Scheduling Problem , 1960 .
[93] Bruce M. Woodworth,et al. Identifying the critical sequence in a resource constrained project , 1988 .
[94] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[95] Michael J. Shaw. Knowledge-based scheduling in flexible manufacturing systems , 1987 .
[96] Abraham Seidmann,et al. Optimal queueing systems controls with finite buffers and with multiple component cost functions , 1989, IEEE Trans. Syst. Man Cybern..
[97] H. Albert Napier,et al. Optimal Multi-Level Lot Sizing for Requirements Planning Systems , 1980 .
[98] P. R. Kumar,et al. Optimal control of a queueing system with two heterogeneous servers , 1984 .
[99] Richard F. Deckro,et al. Resource constrained project crashing , 1989 .
[100] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[101] J. Carlier,et al. An algorithm for solving the job-shop problem , 1989 .
[102] K. Preston White,et al. A recent survey of production scheduling , 1988, IEEE Trans. Syst. Man Cybern..
[103] Stanley B. Gershwin,et al. Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.
[104] D. Golenko-Ginzburg. Controlled alternative activity networks for project management , 1988 .
[105] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[106] J. A. Buzacott,et al. Modelling the performance of flexible manufacturing systems , 1985 .
[107] P. Ramadge,et al. Supervisory control of a class of discrete event processes , 1987 .
[108] Austin J. Lemoine. State-of-the-Art---Networks of Queues---A Survey of Equilibrium Analysis , 1977 .
[109] C. Desclaux,et al. Supervisory control of discrete-event processes with partial observations , 1988 .
[110] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[111] B. Carré. An Algebra for Network Routing Problems , 1971 .
[112] Edward A. Silver,et al. A Heuristic for Multiple Lot Sizing For an Order Under Variable Yield , 1986 .
[113] John L. Colley,et al. Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System , 1966 .
[114] Panos Afentakis. Simultaneous lot sizing and sequencing for multistage production systems , 1985 .
[115] Y. C. Ho,et al. A survey of the perturbation analysis of discrete event dynamic systems , 1985 .
[116] Lawrence Davis,et al. Job Shop Scheduling with Genetic Algorithms , 1985, ICGA.
[117] R. A. Cuninghame-Green,et al. Describing Industrial Processes with Interference and Approximating Their Steady-State Behaviour , 1962 .
[118] Oded Maimon,et al. Control of large discrete event systems: constructive algorithms , 1989 .
[119] Leon F. McGinnis,et al. A Critique of Project Planning with Constrained Resources , 1973 .
[120] Perturbation analysis explained , 1987, 26th IEEE Conference on Decision and Control.
[121] David D. Yao,et al. Decentralized control of service rates in a closed Jackson network , 1989 .
[122] A. S. Spachis,et al. Job-shop scheduling heuristics with local neighbourhood search , 1979 .
[123] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[124] F. Radermacher. Scheduling of project networks , 1985 .
[125] A. Kan. Machine Scheduling Problems: Classification, Complexity and Computations , 1976 .
[126] Salah E. Elmaghraby,et al. Activity networks: Project planning and control by network models , 1977 .
[127] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[128] Stephen F. Smith,et al. Constructing and Maintaining Detailed Production Plans: Investigations into the Development of Knowledge-Based Factory Scheduling Systems , 1986, AI Mag..
[129] William L. Maxwell,et al. Theory of scheduling , 1967 .
[130] Brian D. Ripley,et al. Simulation methodology — An introduction for queueing theorists , 1988, Queueing Syst. Theory Appl..
[131] Kathryn E. Stecke,et al. The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multiserver Queues , 1985, Oper. Res..