An Ensemble Optimization Framework for Coupled Design of Hydropower Contracts and Real‐Time Reservoir Operating Rules

Author(s): Sahu, RK; McLaughlin, DB | Abstract: ©2018. American Geophysical Union. All Rights Reserved. Revenues from hydropower generation often depend on the operator's ability to provide firm power in the presence of uncertain inflows. The primary options available for optimizing revenue are negotiation of a firm power contract before operations begin and adjustment of the reservoir release during operations. Contract and release strategy optimization are closely coupled and most appropriately analyzed with stochastic real-time control methods. Here we use an ensemble-based approach to stochastic optimization that provides a convenient way to construct nonparametric revenue probability distributions to explore the implications of uncertainty. The firm power contract is a simplified bilateral fixed price agreement that partially insulates operator and buyer from price fluctuations. The release control laws and firm energy target are jointly optimized to maximize the operator's expected revenue. Revenue probability distributions and related spill performance statistics indicate that predictive operating strategies such as stochastic dynamic programming and model predictive control can give significantly better performance than standard deterministic operating rules. The performance obtained from batch optimization with perfect inflow information establishes a convenient upper bound on potential revenue and provides a baseline for assessing the significance of differences between real-time operating strategies. Sensitivity analysis indicates that the benefits of predictive operational strategies are greatest for reservoirs with medium nondimensional residence times and less important for reservoirs with large residence times. Overall, probabilistic analysis of the coupled hydropower contract-operations problem provides a realistic way to assess revenue and risk for reservoirs that must provide firm power when inflows are uncertain.

[1]  Cristiano Cervellera,et al.  Optimization of a large-scale water reservoir network by stochastic dynamic programming with efficient state space discretization , 2006, Eur. J. Oper. Res..

[2]  Dimitri P. Bertsekas,et al.  Rollout Algorithms for Stochastic Scheduling Problems , 1999, J. Heuristics.

[3]  Birger Mo,et al.  Integrated risk management of hydro power scheduling and contract management , 2001 .

[4]  Ying Li,et al.  Numerical Solution of Continuous-State Dynamic Programs Using Linear and Spline Interpolation , 1993, Oper. Res..

[5]  Ximing Cai,et al.  Hedging rule for reservoir operations: 2. A numerical model , 2008 .

[6]  A. K. Fink Tehri Hydro Power Complex on the Bhagirathi River in India , 2000 .

[7]  Gregory W. Characklis,et al.  Mitigating hydrologic financial risk in hydropower generation using index-based financial instruments , 2015 .

[8]  S. Joe Qin,et al.  A survey of industrial model predictive control technology , 2003 .

[9]  Bart De Schutter,et al.  Distributed model predictive control of irrigation canals , 2009, Networks Heterog. Media.

[10]  David Q. Mayne,et al.  Constrained model predictive control: Stability and optimality , 2000, Autom..

[11]  Nien-Sheng Hsu,et al.  Optimization of Reservoir Management and Operation with Hedging Rules , 2003 .

[12]  Manfred Morari,et al.  Model predictive control: Theory and practice - A survey , 1989, Autom..

[13]  Cristiano Cervellera,et al.  Efficient sampling in approximate dynamic programming algorithms , 2007, Comput. Optim. Appl..

[14]  B. Bezerra,et al.  Auctions of contracts and energy call options to ensure supply adequacy in the second stage of the Brazilian power sector reform , 2006, 2006 IEEE Power Engineering Society General Meeting.

[15]  Ralph A. Wurbs Reservoir‐System Simulation and Optimization Models , 1993 .

[16]  John W. Labadie,et al.  Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .

[17]  Patrick M. Reed,et al.  Many objective visual analytics: rethinking the design of complex engineered systems , 2013 .

[18]  Y. Bar-Shalom,et al.  Dual effect, certainty equivalence, and separation in stochastic control , 1974 .

[19]  Jianshi Zhao,et al.  Improved Dynamic Programming for Hydropower Reservoir Operation , 2014 .

[20]  Goran Andersson,et al.  Model Predictive Control of Energy Storage including Uncertain Forecasts , 2011 .

[21]  Bart De Moor,et al.  Flood regulation using nonlinear model predictive control , 2010 .

[22]  T. R. Neelakantan,et al.  Hedging Rule Optimisation for Water Supply Reservoirs System , 1999 .

[23]  William S. Butcher,et al.  Optimization of the Operation of a Multiple‐Purpose Reservoir by Dynamic Programming , 1968 .

[24]  James B. Rawlings,et al.  Tutorial overview of model predictive control , 2000 .

[25]  Daniele de Rigo,et al.  Neuro-dynamic programming for designing water reservoir network management policies , 2007 .

[26]  Joao P. S. Catalao,et al.  Optimal hydro scheduling and offering strategies considering price uncertainty and risk management , 2012 .

[27]  S. Yakowitz Dynamic programming applications in water resources , 1982 .

[28]  Hartmut Linke A model-predictive controller for optimal hydro-power utilization of river reservoirs , 2010, 2010 IEEE International Conference on Control Applications.

[29]  R Bellman,et al.  DYNAMIC PROGRAMMING AND LAGRANGE MULTIPLIERS. , 1956, Proceedings of the National Academy of Sciences of the United States of America.

[30]  Ignacio E. Grossmann,et al.  A model predictive control strategy for supply chain optimization , 2003, Comput. Chem. Eng..

[31]  Michael T. Coe,et al.  Dependence of hydropower energy generation on forests in the Amazon Basin at local and regional scales , 2013, Proceedings of the National Academy of Sciences.

[32]  Peter-Jules van Overloop,et al.  Multiple Model Predictive Control on a drainage canal system , 2008 .

[33]  William W.-G. Yeh,et al.  Reservoir Management and Operations Models: A State‐of‐the‐Art Review , 1985 .

[34]  Aris P. Georgakakos,et al.  Optimal Stochastic Operation of Salt River Project, Arizona , 1991 .

[35]  Deepti Rani,et al.  Simulation–Optimization Modeling: A Survey and Potential Application in Reservoir Systems Operation , 2010 .

[36]  G. Shrestha,et al.  Medium term power planning with bilateral contracts , 2005, IEEE Transactions on Power Systems.

[37]  Lennart Ljung,et al.  Estimating Linear Time-invariant Models of Nonlinear Time-varying Systems , 2001, Eur. J. Control.