Optimisation of the technical object maintenance system taking account of risk analysis results

[1]  Adam Kadziński,et al.  The Determination Procedure of the Onset of the Object Wear-Out Period Based on Monitoring of the Empirical Failure Intensity Function , 2015 .

[2]  Terje Aven,et al.  On how to understand and acknowledge risk , 2015, Reliab. Eng. Syst. Saf..

[3]  Bijan Sarkar,et al.  Survey of maintenance policies for the Last 50 Years , 2011 .

[4]  Abdul Hameed,et al.  A risk-based shutdown inspection and maintenance interval estimation considering human error , 2016 .

[5]  Enrico Zio,et al.  Reliability engineering: Old problems and new challenges , 2009, Reliab. Eng. Syst. Saf..

[6]  A. Gill Metoda wyznaczania struktury cyklu napraw elementów pojazdów szynowych , 2004 .

[7]  Gilberto Francisco Martha de Souza,et al.  Risk-based decision making method for maintenance policy selection of thermal power plant equipment , 2010 .

[8]  Laibin Zhang,et al.  Risk based opportunistic maintenance model for complex mechanical systems , 2014, Expert Syst. Appl..

[9]  Feargal Brennan Risk based maintenance for offshore wind structures , 2013 .

[10]  Gang Niu,et al.  Development of an optimized condition-based maintenance system by data fusion and reliability-centered maintenance , 2010, Reliab. Eng. Syst. Saf..

[11]  Mitra Fouladirad,et al.  Assessment of a maintenance model for a multi-deteriorating mode system , 2010, Reliab. Eng. Syst. Saf..

[12]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[13]  Daniel Straub,et al.  Risk based inspection planning for structural systems , 2005 .

[14]  A. Kadziński,et al.  Warunkowanie ryzykiem w procedurach decyzyjnych w obsługiwaniu pojazdów szynowych , 2009 .

[15]  Weijie Mao,et al.  A condition-based order-replacement policy for a single-unit system , 2008 .

[16]  Anna Kobaszyńska-Twardowska,et al.  Identyfikacja zagrożeń w wybranych strefach tramwaju z wykorzystaniem metody Bow-Tie , 2014 .

[17]  Faisal I Khan,et al.  Risk-based maintenance of ethylene oxide production facilities. , 2004, Journal of hazardous materials.

[18]  Viliam Makis,et al.  An optimal condition-based maintenance policy for a degrading system subject to the competing risks of soft and hard failure , 2015, Comput. Ind. Eng..

[19]  Adam Kadziński,et al.  Hazard Identification Model , 2016 .

[20]  Satoshi Nagai,et al.  Risk-based inspection and maintenance systems for steam turbines , 2004 .

[21]  John Dalsgaard Sørensen,et al.  On risk-based operation and maintenance of offshore wind turbine components , 2011, Reliab. Eng. Syst. Saf..

[22]  Deborah E. Dickerson,et al.  Risk-based Maintenance Management of U.S. Public School Facilities☆ , 2016 .

[23]  Terje Aven,et al.  Emerging risk - Conceptual definition and a relation to black swan type of events , 2015, Reliab. Eng. Syst. Saf..

[24]  Fred Nilsson Risk-based approach to plant life management , 2003 .

[25]  Adrian Gill,et al.  System obsługiwania pojazdów szynowych jako element w warstwowym modelu ich systemów bezpieczeństwa , 2006 .

[26]  M. R. Haghifam,et al.  Risk-based maintenance scheduling in the presence of reward penalty scheme , 2015 .

[27]  Adrian Gill,et al.  Szacowanie i wartościowanie ryzyka zagrożeń związanych z odcinkiem szybkiego tramwaju na poznańskiej sieci tramwajowej , 2012 .