An Empirical Study on Performance Measurement Factors for Construction Organizations

Like any other organization, it has become essential for the organizations in the construction industry to measure their performance effectively for long-term survival in today’s competitive business environment. Therefore, it is imperative for a construction organization to know about various performance measurement factors to evaluate its performance. However, most of the previous studies have focused on identification of factors for measuring performance at the level of projects only. Moreover, the majority of these studies have been undertaken in context to the developed construction markets. The present study addresses these gaps in the literature by identifying critical factors for examining the performance of construction firms at the organizational level. A total of 20 organizational performance attributes were identified and analyzed using a questionnaire survey conducted on 106 respondents among 90 different organizations operating in the National Capital Region (NCR) of India. It was found that attributes such as timely completion, relationship with the client, and satisfaction (in terms of both product and services) carry more weight than the cost performance of a construction organization. In addition to this, factor analysis conducted on the performance attributes of high importance has resulted in six performance factors: (1) profitability and asset management, (2) satisfaction of key stakeholders, (3) predictability of time and cost, (4) environment, health, and safety (EHS), (5) quality consciousness, and (6) low staff turnover. The performance factors obtained from the study may provide useful guidelines to the construction organizations enabling them to examine and improve their performance.

[1]  Nabi Ibadov Contractor Selection for Construction Project, with the Use of Fuzzy Preference Relation , 2015 .

[2]  Sangyoon Chin,et al.  Comparable Performance Measurement System for Construction Companies , 2007 .

[3]  Elaine Aspinwall,et al.  Improvement tools in the UK construction industry , 2005 .

[4]  R. Yin Case Study Research: Design and Methods , 1984 .

[5]  David G. Carmichael,et al.  Comparative performance of publicly listed construction companies: Australian evidence , 2010 .

[6]  I. Tsolas Modelling profitability and effectiveness of Greek-listed construction firms: an integrated DEA and ratio analysis , 2011 .

[7]  Silvia Vilčeková,et al.  The Proposal of Key Performance Indicators in Facility Management and Determination the Weights of Significance , 2013 .

[8]  Chee Hong Wong,et al.  Contractor Performance Prediction Model for the United Kingdom Construction Contractor: Study of Logistic Regression Approach , 2004 .

[9]  S. L. Tang,et al.  Achieving Client Satisfaction for Engineering Consulting Firms , 2003 .

[10]  Robert L. K. Tiong,et al.  Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners , 2006 .

[11]  Ismail M. Basha,et al.  Performance Evaluating Model for Construction Companies: Egyptian Case Study , 2007 .

[12]  Andrew D.F. Price,et al.  Performance Measurement in Construction , 2004 .

[13]  M. Anson,et al.  4D Dynamic Construction Management and Visualization Software: 2. Site Trial , 2005 .

[14]  Toong Khuan Chan,et al.  Measuring performance of the Malaysian construction industry , 2009 .

[15]  Mei-yung Leung,et al.  Chinese Values and Stressors of Construction Professionals in Hong Kong , 2010 .

[16]  Peter E. D. Love,et al.  Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..

[17]  Jian-Ping Zhang,et al.  4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .

[18]  John Liston,et al.  Contractor ability criteria: a view from the Thai construction industry , 2003 .

[19]  Michael C.H. Yam,et al.  Contractor Key Competitiveness Indicators: A China Study , 2006 .

[20]  R. Yin,et al.  Case Study Research: Design and Methods (4th ed. , 2009 .

[21]  Miljan Kovačević,et al.  APPLICATION OF BENCHMARKING METHOD IN THE CONSTRUCTION COMPANIES , 2011 .

[22]  Nashwan Dawood,et al.  DEVELOPMENT OF AN INTEGRATED INFORMATION RESOURCE BASE FOR 4D/VR CONSTRUCTION PROCESSES SIMULATION , 2003 .

[23]  David Arditi,et al.  Performance of minority firms providing construction management services in the US transportation sector , 2010 .

[24]  H. S. Hassaan,et al.  Fuzzy decision model for construction contractor's selection in Egypt: Tender phase , 2013, 2013 IEEE International Conference on Industrial Engineering and Engineering Management.

[25]  Andrew D.F. Price,et al.  Building a conceptual framework for measuring business performance in construction: an empirical evaluation , 2005 .

[26]  Jorge Moreira da Costa,et al.  Performance Assessment of Construction Companies Integrating Key Performance Indicators and Data Envelopment Analysis , 2010 .

[27]  Vineet R. Kamat,et al.  Scene Graph and Frame Update Algorithms for Smooth and Scalable 3D Visualization of Simulated Construction Operations , 2002 .

[28]  R. Edward Minchin,et al.  Management of Construction Firm Performance Using Benchmarking , 2007 .

[29]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[30]  Miroslaw J. Skibniewski,et al.  Applicability of e-Work models for the automation of construction materials management systems , 2003 .

[31]  Low Sui Pheng,et al.  Implementing Total Quality Management in Construction Firms , 2004 .

[32]  Khalid S. Al-Gahtani,et al.  Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia , 2013 .

[33]  Chunlu Liu,et al.  Malmquist indices of total factor productivity changes in the Australian construction industry , 2010 .

[34]  Soo-Yong Kim,et al.  Performance measurement of construction firms in developing countries , 2008 .

[35]  Raja R. A. Issa,et al.  Management’s Perception of Key Performance Indicators for Construction , 2003 .

[36]  Hemanta Doloi,et al.  Analysis of pre‐qualification criteria in contractor selection and their impacts on project success , 2009 .

[37]  Patrick T.I. Lam,et al.  Identifying the critical success factors for target cost contracts in the construction industry , 2010 .

[38]  Kwok-wing Chau,et al.  Application of data warehouse and Decision Support System in construction management , 2003 .

[39]  Julio C. Martinez,et al.  Visualizing Simulated Construction Operations in 3D , 2001 .

[40]  Trudie Aberdeen Yin, R. K. (2009). Case study research: Design and methods (4th Ed.). Thousand Oaks, CA: Sage. , 2013, The Canadian Journal of Action Research.

[41]  Stella Giossi,et al.  RELIABILITY TESTING OF A NEW SCALE FOR MEASURING ATTITUDES TOWARDS LIFELONG LEARNING AND HUMAN RESOURCE DEVELOPMENT, (LLEHUREDE) SCALE , 2012 .

[42]  Saumyendu Ghosh,et al.  Determination of Key Performance Indicators with Enterprise Resource Planning Systems in Engineering Construction Firms , 2009 .

[43]  Geoffrey Qiping Shen,et al.  Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction , 2011 .

[44]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[45]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .