An Empirical Study on Performance Measurement Factors for Construction Organizations
暂无分享,去创建一个
[1] Nabi Ibadov. Contractor Selection for Construction Project, with the Use of Fuzzy Preference Relation , 2015 .
[2] Sangyoon Chin,et al. Comparable Performance Measurement System for Construction Companies , 2007 .
[3] Elaine Aspinwall,et al. Improvement tools in the UK construction industry , 2005 .
[4] R. Yin. Case Study Research: Design and Methods , 1984 .
[5] David G. Carmichael,et al. Comparative performance of publicly listed construction companies: Australian evidence , 2010 .
[6] I. Tsolas. Modelling profitability and effectiveness of Greek-listed construction firms: an integrated DEA and ratio analysis , 2011 .
[7] Silvia Vilčeková,et al. The Proposal of Key Performance Indicators in Facility Management and Determination the Weights of Significance , 2013 .
[8] Chee Hong Wong,et al. Contractor Performance Prediction Model for the United Kingdom Construction Contractor: Study of Logistic Regression Approach , 2004 .
[9] S. L. Tang,et al. Achieving Client Satisfaction for Engineering Consulting Firms , 2003 .
[10] Robert L. K. Tiong,et al. Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners , 2006 .
[11] Ismail M. Basha,et al. Performance Evaluating Model for Construction Companies: Egyptian Case Study , 2007 .
[12] Andrew D.F. Price,et al. Performance Measurement in Construction , 2004 .
[13] M. Anson,et al. 4D Dynamic Construction Management and Visualization Software: 2. Site Trial , 2005 .
[14] Toong Khuan Chan,et al. Measuring performance of the Malaysian construction industry , 2009 .
[15] Mei-yung Leung,et al. Chinese Values and Stressors of Construction Professionals in Hong Kong , 2010 .
[16] Peter E. D. Love,et al. Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..
[17] Jian-Ping Zhang,et al. 4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .
[18] John Liston,et al. Contractor ability criteria: a view from the Thai construction industry , 2003 .
[19] Michael C.H. Yam,et al. Contractor Key Competitiveness Indicators: A China Study , 2006 .
[20] R. Yin,et al. Case Study Research: Design and Methods (4th ed. , 2009 .
[21] Miljan Kovačević,et al. APPLICATION OF BENCHMARKING METHOD IN THE CONSTRUCTION COMPANIES , 2011 .
[22] Nashwan Dawood,et al. DEVELOPMENT OF AN INTEGRATED INFORMATION RESOURCE BASE FOR 4D/VR CONSTRUCTION PROCESSES SIMULATION , 2003 .
[23] David Arditi,et al. Performance of minority firms providing construction management services in the US transportation sector , 2010 .
[24] H. S. Hassaan,et al. Fuzzy decision model for construction contractor's selection in Egypt: Tender phase , 2013, 2013 IEEE International Conference on Industrial Engineering and Engineering Management.
[25] Andrew D.F. Price,et al. Building a conceptual framework for measuring business performance in construction: an empirical evaluation , 2005 .
[26] Jorge Moreira da Costa,et al. Performance Assessment of Construction Companies Integrating Key Performance Indicators and Data Envelopment Analysis , 2010 .
[27] Vineet R. Kamat,et al. Scene Graph and Frame Update Algorithms for Smooth and Scalable 3D Visualization of Simulated Construction Operations , 2002 .
[28] R. Edward Minchin,et al. Management of Construction Firm Performance Using Benchmarking , 2007 .
[29] Ghassan Aouad,et al. Performance management in construction: a conceptual framework , 2001 .
[30] Miroslaw J. Skibniewski,et al. Applicability of e-Work models for the automation of construction materials management systems , 2003 .
[31] Low Sui Pheng,et al. Implementing Total Quality Management in Construction Firms , 2004 .
[32] Khalid S. Al-Gahtani,et al. Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia , 2013 .
[33] Chunlu Liu,et al. Malmquist indices of total factor productivity changes in the Australian construction industry , 2010 .
[34] Soo-Yong Kim,et al. Performance measurement of construction firms in developing countries , 2008 .
[35] Raja R. A. Issa,et al. Management’s Perception of Key Performance Indicators for Construction , 2003 .
[36] Hemanta Doloi,et al. Analysis of pre‐qualification criteria in contractor selection and their impacts on project success , 2009 .
[37] Patrick T.I. Lam,et al. Identifying the critical success factors for target cost contracts in the construction industry , 2010 .
[38] Kwok-wing Chau,et al. Application of data warehouse and Decision Support System in construction management , 2003 .
[39] Julio C. Martinez,et al. Visualizing Simulated Construction Operations in 3D , 2001 .
[40] Trudie Aberdeen. Yin, R. K. (2009). Case study research: Design and methods (4th Ed.). Thousand Oaks, CA: Sage. , 2013, The Canadian Journal of Action Research.
[41] Stella Giossi,et al. RELIABILITY TESTING OF A NEW SCALE FOR MEASURING ATTITUDES TOWARDS LIFELONG LEARNING AND HUMAN RESOURCE DEVELOPMENT, (LLEHUREDE) SCALE , 2012 .
[42] Saumyendu Ghosh,et al. Determination of Key Performance Indicators with Enterprise Resource Planning Systems in Engineering Construction Firms , 2009 .
[43] Geoffrey Qiping Shen,et al. Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction , 2011 .
[44] Luis F. Alarcón,et al. PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .
[45] Patrick S. W. Fong,et al. Final contractor selection using the analytical hierarchy process , 2000 .