A TRIZ Approach to Reliable Megaproject Sustainability
暂无分享,去创建一个
Qian Xu | Zhen Chen | Andrew Agapiou | Heng Li | Heng Li | A. Agapiou | Zhen Chen | Qian Xu
[1] C. Lawrence. Project perspectives , 2022, Strategic Direction.
[2] E. Haezendonck,et al. Patterns of Circular Transition: What Is the Circular Economy Maturity of Belgian Ports? , 2020, Sustainability.
[3] Reliability Theory , 2020, Optimization Under Uncertainty with Applications to Aerospace Engineering.
[4] Simon P. Philbin,et al. Redefining the Use of Sustainable Development Goals at the Organisation and Project Levels—A Survey of Engineers , 2020, Administrative Sciences.
[5] Heng Li,et al. A Benefits Prioritization Analysis on Adopting BIM Systems Against Major Challenges in Megaproject Delivery , 2020, Frontiers in Built Environment.
[6] Daan Schraven,et al. Integrating Sustainability into Major Infrastructure Projects: Four Perspectives on Sustainable Tunnel Development , 2019, Sustainability.
[7] Prince Boateng,et al. A dynamic system approach to risk analysis for megaproject delivery , 2019 .
[8] Marianne Davys,et al. RIBA Plan of Work , 2019, Small Practice and the Sole Practitioner.
[9] Zhen Chen,et al. Grand Challenges in Construction Management , 2019, Front. Built Environ..
[10] Zhen Chen. Editorial , 2018, Proceedings of the Institution of Civil Engineers - Engineering Sustainability.
[11] Dynamic Relationships between Mega Projects and Official Development Assistance: Case of South Korean Infrastructure Construction Projects in ASEAN’s Developing Countries , 2018, Sustainability.
[12] Qing-hua He,et al. How Does Organizational Citizenship Behavior (OCB) Affect the performance of megaprojects? Insights from a System Dynamic Simulation , 2018 .
[13] Samuel Hayes,et al. The Oxford handbook of megaproject management , 2018 .
[14] L. K. Khatiwada. Implementing a Post-Project Sustainability Study (PSS) of a Development Project: Lessons Learned from Indonesia , 2017 .
[15] Zhen Chen,et al. A research roadmap for megaproject sustainability assessment , 2017 .
[16] Tuomas Ahola,et al. Project sustainability strategies: A systematic literature review , 2017 .
[17] Zhen Chen. The principles of facilities management and case studies , 2017 .
[18] Prince Boateng,et al. Megaproject Risk Analysis and Simulation: A Dynamic Systems Approach , 2017 .
[19] S. Barrett. Addressing significant weather impacts on airports: quick start guide and toolkit. , 2016 .
[20] M. Rafieian,et al. Qualitative Sustainability Assessment of the Large- Scale Redevelopment Plan in Samen District of Mashhad , 2016 .
[21] Mauro Luiz Martens,et al. The challenge of introducing sustainability into project management function: multiple-case studies , 2016 .
[22] Zhen Chen,et al. Environmental Management in Construction: A Quantitative Approach , 2016 .
[23] Heng Li,et al. Environmental Management in Construction , 2016 .
[24] Zhen Chen,et al. An Analytical Network Process model for risks prioritisation in megaprojects , 2015 .
[25] L. Hart. Procuring Successful Mega-Projects: How to Establish Major Government Contracts Without Ending up in Court , 2015 .
[26] Emmanuel Rey,et al. An indicator system for the assessment of sustainability integrated into the project dynamics of regeneration of disused urban areas , 2015 .
[27] Chimay J. Anumba,et al. ANP Experiment for Demolition Plan Evaluation , 2014 .
[28] Hugo Priemus,et al. International Handbook on Mega-Projects , 2014 .
[29] Dale Sinclair. Guide to Using the RIBA Plan of Work 2013 , 2013 .
[30] Virginia A. Greiman,et al. Megaproject Management: Lessons on Risk and Project Management from the Big Dig , 2013 .
[31] Wied Ruijssenaars,et al. Encyclopedia of the Sciences of Learning , 2012 .
[32] Qian Xu,et al. A total environmental risk assessment model for international hub airports , 2011 .
[33] Edward W. Merrow,et al. Industrial Megaprojects: Concepts, Strategies, and Practices for Success , 2011 .
[34] Karen Gadd,et al. TRIZ for Engineers: Enabling Inventive Problem Solving , 2011 .
[35] Karen Gadd,et al. TRIZ for Engineers: Enabling Inventive Problem Solving: Gadd/TRIZ for Engineers: Enabling Inventive Problem Solving , 2011 .
[36] Yupo Chan,et al. Multicriteria Decision Making , 2011 .
[37] Complex Project Management Global Perspectives and the Strategic Agenda to 2025 , 2011 .
[38] Zhen Chen. ANP models and STEEP criteria , 2010 .
[39] David Vernon,et al. Research road map , 2010 .
[40] Zhen Chen,et al. An analytic network process for risks assessment in commercial real estate development , 2009 .
[41] Qian Xu,et al. The Disaster-Oriented Assessment of Urban Clusters for Locating Production Systems in China , 2008 .
[42] Thomas G Rundall,et al. Evidence-based management reconsidered. , 2006, Frontiers of health services management.
[43] F. Eitel,et al. Evidence-Based Learning. , 1999 .
[44] Michael Cheema Shabbir Bamberger,et al. Case studies of project sustainability : implications for policy and operations from Asian experience , 1990 .
[45] Colin W. Clipson,et al. Integrated Approaches to Facilities Planning and Assessment. , 1987 .
[46] S. W. Holman. A challenge. , 1955, Medical technicians bulletin.