Changeable Manufacturing - Classification, Design and Operation

Abstract Flexibility and changeability are key enablers for meeting the challenges of a global market. The paper first describes the main change drivers and takes then a deeper look at how changeability in a manufacturing en-terprise can be classified and operationalized. The next sections are devoted to changeability in reconfigur-able manufacturing systems, assembly systems and factories including buildings and infrastructure. New challenges, perspectives and approaches for process plan reconfiguration as well as for Production Planning and Control are discussed. Finally, the evaluation and economic justification of changeability are addressed and a control loop of changeability is presented.

[1]  Hoda A. ElMaraghy,et al.  Reconfigurable Process Plans For Responsive Manufacturing Systems , 2007 .

[2]  Hans-Peter Wiendahl,et al.  Load-Oriented Manufacturing Control , 1994 .

[3]  Harry Boer,et al.  ERP implementation: An integrated process of radical change and continuous learning , 2003 .

[4]  S. Disney,et al.  On bullwhip in supply chains--historical review, present practice and expected future impact , 2006 .

[5]  Hoda A. ElMaraghy,et al.  Evolution and Future Perspectives of CAPP , 1993 .

[6]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[7]  Kurt Andler Rationalisierung der Fabrikation und optimale Losgröße , 1929 .

[8]  A. I. Shabaka,et al.  A GA-BASED CONSTRAINT SATISFACTION MODEL FOR GENERATING OPTIMAL PROCESS PLANS , 2006 .

[9]  László Monostori,et al.  Agent-based systems for manufacturing , 2006 .

[10]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[11]  Jens Bengtsson,et al.  Manufacturing flexibility and real options: A review , 2001 .

[12]  Andrew Y. C. Nee,et al.  A simulated annealing-based optimization algorithm for process planning , 2000 .

[13]  Y. M. Moon,et al.  Reconfigurable Machine Tool Design , 2006 .

[14]  Sridhar Kota,et al.  Generalized kinematic modeling of Reconfigurable Machine Tools , 2002 .

[15]  Suresh P. Sethi,et al.  Flexibility in manufacturing: A survey , 1990 .

[16]  Denis Royston Towill,et al.  A discrete transfer function model to determine the dynamic stability of a vendor managed inventory supply chain , 2002 .

[17]  Gunter Lay,et al.  Neue Arbeitszeitmodelle haben das Experimentierstadium in den Betrieben verlassen , 1997 .

[18]  D. Gerwin Manufacturing flexibility: a strategic perspective , 1993 .

[19]  Yash P. Gupta,et al.  Flexibility of manufacturing systems: Concepts and measurements , 1989 .

[20]  E. Westkämper,et al.  Systematic Analysis of PPC System Deficiencies – Analytical Approach and Consequences for PPC Design , 2006 .

[21]  Yoram Koren,et al.  Reconfigurable machine tools , 2001 .

[22]  Reuven Katz,et al.  Design principles of reconfigurable machines , 2007 .

[23]  Hans-Peter Wiendahl,et al.  The Transformable Factory – Strategies, Methods and Examples , 2006 .

[24]  Glen Mullineux,et al.  CIRP International seminar on manufacturing systems , 2006 .

[25]  Ahmed M. Deif,et al.  Effect of Time-Based Parameters on the Agility of a Dynamic MPC System , 2006 .

[26]  Stefano Tonchia,et al.  Manufacturing flexibility: A literature review , 1998 .

[27]  M. Seyfarth,et al.  Control Systems for RMS and Methods of their Reconfiguration , 2006 .

[28]  Eberhard Abele,et al.  Measuring Flexibility in Investment Decisions for Manufacturing Systems , 2006 .

[29]  P. Contini,et al.  Computer-aided set-up planning for machining centres configuration , 2004 .

[30]  Ahmed Azab,et al.  Semi-Generative Macro-Process Planning For Reconfigurable Manufacturing , 2007 .

[31]  Andrea Matta,et al.  Configuration of AMSs , 2005 .

[32]  O. Dashchenko Analysis of Modern Factory Structures and Their Transformability , 2006 .

[33]  A. Urbani Life Cycle Cost Calculation for Manufacturing Systems by Means of Reconfigurability Analysis , 2006 .

[34]  Hans-Peter Wiendahl,et al.  Planung modularer Fabriken: Vorgehen und Beispiele aus der Praxis , 2005 .

[35]  Günter Pritschow,et al.  Application of Control Theory for Production Logistics – Results of a Joint Project , 1995 .

[36]  T. Tolio,et al.  An approach to design the flexibility degree in flexible manufacturing systems , 2006 .

[37]  George Chryssolouris,et al.  Volume and product flexibility: a case study for a refrigerators producing facility , 2005, 2005 IEEE Conference on Emerging Technologies and Factory Automation.

[38]  J. A. Buzacott,et al.  Flexible manufacturing systems: a review of analytical models , 1986 .

[39]  A. Nee,et al.  SETUP PLANNING USING HOPFIELD NET AND SIMULATED ANNEALING , 1998 .

[40]  Neil A. Duffie,et al.  Performance of Coupled Closed-Loop Workstation Capacity Controls in a Multi-Workstation Production System , 2006 .

[41]  T. Tolio,et al.  Computer aided setup planning for machining centers configuration , 2003 .

[42]  Dailun Shi,et al.  A survey of manufacturing flexibility: Implications for e-business flexibility , 2003, IBM Syst. J..

[43]  G. N. Evans,et al.  Analysis and design of an adaptive minimum reasonable inventory control system , 1997 .

[44]  Petri Helo,et al.  Dynamic modelling of surge effect and capacity limitation in supply chains , 2000 .

[45]  Derrick E. D'Souza,et al.  Toward a taxonomy of manufacturing flexibility dimensions , 2000 .

[46]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[47]  Manoj K. Malhotra,et al.  A theoretical framework for analyzing the dimensions of manufacturing flexibility , 1999 .

[48]  Neil A. Duffie,et al.  Closed-loop real-time cooperative decision-making dynamics in heterarchical manufacturing systems , 2002 .

[49]  Botond Kádár,et al.  Adaptive approaches to increasing the performance of production control systems , 2003 .

[50]  George Q. Huang,et al.  The impacts of sharing production information on supply chain dynamics: A review of the literature , 2003 .

[51]  Luigi Maria Galantucci,et al.  Design of object-oriented database for the definition of machining operation sequences of 3D workpieces , 1998 .

[52]  H.-P. Wiendahl,et al.  Stumbling blocks of PPC: Towards the holistic configuration of PPC systems , 2005 .

[53]  Quirico Semeraro,et al.  Rule Based System for Non Linear Process Plan Generation , 2000 .

[54]  Engelbert Westkämper,et al.  Digital Manufacturing In The Global Era , 2007 .

[55]  Andrea Matta,et al.  An integrated approach for the configuration of automated manufacturing systems , 2000 .

[56]  Frank W. Liou,et al.  Reconfigurable Manufacturing Equipment , 2006 .

[57]  George Chryssolouris,et al.  Manufacturing Systems: Theory and Practice , 1992 .

[58]  Onur Kuzgunkaya Lifecycle approach to economic and strategic justification of RMS investments , 2007 .

[59]  A. Galip Ulsoy,et al.  Trends and perspectives in flexible and reconfigurable manufacturing systems , 2002, J. Intell. Manuf..

[60]  Hoda A. ElMaraghy,et al.  Flexible and reconfigurable manufacturing systems paradigms , 2005 .

[61]  Yong-Mo Moon,et al.  Reconfigurable machine tool design: Theory and application. , 2000 .

[62]  Tomohiro Fukaya Highly Productive and Reconfigurable Manufacturing System , 2007 .

[63]  Jan-Wilhelm Breithaupt,et al.  Automatic production control applying control theory , 2000 .

[64]  Hans-Peter Wiendahl,et al.  Justifying Changeability. A Methodical Approach to Achieving Cost Effectiveness , 2004 .

[65]  Zbigniew J. Pasek,et al.  Real Options: an Application to RMS Investment Evaluation , 2006 .

[66]  Hoda A. ElMaraghy,et al.  Generation of machine configurations based on product features , 2007, Int. J. Comput. Integr. Manuf..

[67]  Tullio Tolio,et al.  A new fuzzy AHP method for the evaluation of automated manufacturing systems , 2002 .

[68]  H. Simon,et al.  On the Application of Servomechanism Theory in the Study of Production Control , 1952 .

[69]  Ahmed Azab,et al.  Mathematical Modeling for Reconfigurable Process Planning , 2007 .

[70]  Yoram Koren,et al.  General RMS Characteristics. Comparison with Dedicated and Flexible Systems , 2006 .

[71]  Quirico Semeraro,et al.  A new method to cope with decision makers' uncertainty in the equipment selection process , 2004 .