Achieving Greater Project Success & Profitability through Pre-construction Planning: A Case-based Study

Abstract Owing to shift in global perspective and socio-economic needs, the construction industry is undertaking risky and complex projects. The complexity of construction projects requires the coordination between designer and contractor in the early stages of the projects. Little research has been performed regarding the pre-construction planning (PCP), which is the integration between contractor and designer in the early stages of a project to ease construction. It is very important for the construction industry stakeholders particularly contractor and designer to acknowledge the significance of PCP. This study analyzed the current utilization of PCP practices, practical benefits from its utilization and barriers faced during its utilization through the study of selected Design-Build residential, commercial infrastructure, transportation, and power plant projects. A questionnaire survey was used for this purpose. The results of this research will provide some solid foundation towards design-construction integration to attain maximum efficiency and success in the construction industry.

[1]  Hyojoo Son,et al.  An Empirical Investigation of Key Pre-project Planning Practices Affecting the Cost Performance of Green Building Projects , 2015 .

[2]  Bon-Gang Hwang,et al.  Front-End Planning Implementation in Singapore: Status, Importance, and Impact , 2012 .

[3]  Awad S. Hanna,et al.  Quantitative Methods for Design-Build Team Selection , 2009 .

[4]  David Riley,et al.  The Effects of Design Coordination on Project Uncertainty , 2001 .

[5]  Makarand Hastak,et al.  Integration of the Construction Knowledge and Expertise in Front-End Planning , 2016 .

[6]  Javier Irizarry,et al.  Current Trends in Construction Site Layout Planning , 2014 .

[7]  Walid Y. Thabet,et al.  A Virtual Construction Environment for preconstruction planning , 2003 .

[8]  David R. Riley,et al.  Delivering Sustainable, High-Performance Buildings: Influence of Project Delivery Methods on Integration and Project Outcomes , 2013 .

[9]  Roberta Patrice Bosfield Front End Planning In The Modern Construction Industry , 2012 .

[10]  G. E. Gibson,et al.  Alignment during preproject planning , 2001 .

[11]  Gibson,et al.  Common Barriers to Effective Front-End Planning of Capital Projects , 2012 .

[12]  Aviad Shapira,et al.  Relationships between Methods for Constructability Analysis during Design and Constructability Failures in Projects , 2012 .

[13]  W. Edward Back,et al.  Critical Activities in the Front-End Planning Process , 2008 .

[14]  G. Edward Gibson,et al.  Assessing the Performance of Two-Step Design-Build Procurement , 2014 .

[15]  Yu-Ren Wang,et al.  A study of preproject planning and project success using ANNs and regression models , 2008 .

[16]  G. Edward Gibson,et al.  Pre-Project Planning and its Practice in Industry , 2006 .

[17]  Wei Zhou,et al.  Safety by design: dialogues between designers and builders using virtual reality , 2015 .

[18]  C. S. Lin,et al.  Value engineering applied at the construction planning stage , 2011, 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management.

[19]  F. Diab Mohamed Integrating Risk Assessment in Planning for Sustainable Infrastructure Projects , 2012 .

[20]  Evan Bingham,et al.  Front End Planning for Infrastructure Projects , 2010 .