Heuristic knowledge representation of production scheduling: An integrated modeling approach
暂无分享,去创建一个
[1] William E. Lorensen,et al. Object-Oriented Modeling and Design , 1991, TOOLS.
[2] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[3] Jae Kyu Lee,et al. PAMS: A Domain-specific Knowledge-based Parallel Machine Scheduling System , 1988 .
[4] Kenneth N. McKay,et al. Job-Shop Scheduling Theory: What Is Relevant? , 1988 .
[5] Grady Booch,et al. Object-Oriented Design with Applications , 1990 .
[6] Gerald L. Thompson,et al. A mixed-initiative scheduling workbench integrating AI, OR and HCI , 1993, Decis. Support Syst..
[7] Siddhartha Bhattacharyya,et al. A review of machine learning in scheduling , 1994 .
[8] K. Preston White,et al. A recent survey of production scheduling , 1988, IEEE Trans. Syst. Man Cybern..
[9] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[10] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .
[11] Peter P. Chen. The entity-relationship model: toward a unified view of data , 1975, VLDB '75.
[12] James Martin,et al. Object-oriented analysis and design , 1992 .
[13] V. V. S. Sarma,et al. Knowledge-Based Approaches to Scheduling Problems: A Survey , 1991, IEEE Trans. Knowl. Data Eng..
[14] James R. Evans,et al. Heuristic methods and applications: A categorized survey , 1989 .