A many-objective optimization model for construction scheduling
暂无分享,去创建一个
[1] Reza Abbasnia,et al. Time-Cost Trade-off Problem in Construction Project Management, Based on Fuzzy Logic , 2008 .
[2] Carlos M. Fonseca,et al. Methodology to select solutions from the pareto-optimal set: a comparative study , 2007, GECCO '07.
[3] Mehdi Tavakolan,et al. Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets , 2009 .
[4] Carlos A. Brizuela,et al. A survey on multi-objective evolutionary algorithms for many-objective problems , 2014, Computational Optimization and Applications.
[5] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[6] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[7] Ehsan Eshtehardian,et al. Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm , 2013 .
[8] Andreas T. Ernst,et al. Resource constraint scheduling with a fractional shared resource , 2011, Oper. Res. Lett..
[9] Emad Elbeltagi,et al. Overall multiobjective optimization of construction projects scheduling using particle swarm , 2016 .
[10] Shengxiang Yang,et al. A many-objective evolutionary algorithm based on rotated grid , 2018, Appl. Soft Comput..
[11] Yimin Zhu,et al. Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms , 2012 .
[12] Seyed Jafar Sadjadi,et al. A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities , 2017 .
[13] Kalyanmoy Deb,et al. An Evolutionary Many-Objective Optimization Algorithm Using Reference-Point-Based Nondominated Sorting Approach, Part I: Solving Problems With Box Constraints , 2014, IEEE Transactions on Evolutionary Computation.
[14] Seyed Jafar Sadjadi,et al. Resource-constrained project scheduling problem: review of past and recent developments , 2018 .
[15] Khaled A El-Rayes,et al. Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .
[16] Kalyanmoy Deb,et al. A combined genetic adaptive search (GeneAS) for engineering design , 1996 .
[17] Mohamed Marzouk,et al. Handling construction pollutions using multi‐objective optimization , 2008 .
[18] Hamed R. Tareghian,et al. On the discrete time, cost and quality trade-off problem , 2006, Appl. Math. Comput..
[19] Khaled A El-Rayes,et al. Optimizing Resource Leveling in Construction Projects , 2009 .
[20] Sou-Sen Leu,et al. GA-BASED MULTICRITERIA OPTIMAL MODEL FOR CONSTRUCTION SCHEDULING , 1999 .
[21] Slim Bechikh,et al. A New Decomposition-Based NSGA-II for Many-Objective Optimization , 2018, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[22] Jean-Pascal van Ypersele de Strihou. Climate Change 2014 - Synthesis Report , 2015 .
[23] Ahmed Senouci,et al. Use of Genetic Algorithms in Resource Scheduling of Construction Projects , 2004 .
[24] M. Hamdan. On the Disruption-level of Polynomial Mutation for Evolutionary Multi-objective Optimisation Algorithms , 2010, Comput. Informatics.
[25] Madjid Tavana,et al. A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems , 2014, Expert Syst. Appl..
[26] Eckart Zitzler,et al. HypE: An Algorithm for Fast Hypervolume-Based Many-Objective Optimization , 2011, Evolutionary Computation.
[27] Fadi A. Karaa,et al. Resource Management in Construction , 1986 .
[28] John E. Dennis,et al. Normal-Boundary Intersection: A New Method for Generating the Pareto Surface in Nonlinear Multicriteria Optimization Problems , 1998, SIAM J. Optim..
[29] Hong Zhang,et al. Fuzzy-multi-objective particle swarm optimization for time―cost―quality tradeoff in construction , 2010 .
[30] Seyed Taghi Akhavan Niaki,et al. A soft-computing Pareto-based meta-heuristic algorithm for a multi-objective multi-server facility location problem , 2013, Appl. Soft Comput..
[31] S. Ward,et al. Objectives and performance in construction projects , 1991 .
[32] Huan Zheng,et al. The Bi-Level Optimization Research for Time-Cost-Quality-Environment Trade-Off Scheduling Problem and Its Application to a Construction Project , 2017 .
[33] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[34] R. Marler,et al. The weighted sum method for multi-objective optimization: new insights , 2010 .
[35] Sanjay Tiwari,et al. Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling , 2015 .
[36] Aida Mustapha,et al. Crossover and mutation operators of genetic algorithms , 2017 .
[37] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[38] Khaled A El-Rayes,et al. Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects , 2006 .
[39] Parviz Fattahi,et al. Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage , 2017 .
[40] Abbas Afshar,et al. MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-SAFETY USING GENETIC ALGORITHM , 2014 .
[41] Mario Köppen,et al. Many-Objective Particle Swarm Optimization by Gradual Leader Selection , 2007, ICANNGA.
[42] Said M. Easa,et al. Resource Leveling in Construction by Optimization , 1989 .
[43] Hamidreza Maghsoudlou,et al. A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem , 2016, Comput. Chem. Eng..
[44] Hua Ke,et al. Preemptive Multi-mode Resource-Constrained Discrete Time-Cost-Resource Optimization via Non-dominated Sorting Genetic Algorithm , 2016 .