Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects

AbstractDuring the conceptual phase of a construction project, numerous uncertainties make accurate cost estimation challenging. This work develops a new model to calculate conceptual costs of building projects for effective cost control. The proposed model integrates four mathematical techniques (sub-models), namely, (1) the component ratios sub-model, fuzzy adaptive learning control network (FALCON) and fast messy genetic algorithm (fmGA) based sub-model, (2) regression sub-model, and (4) multi-factor evaluation sub-model. While the FALCON- and fmGA-based sub-model trains the historical cost data, three other sub-models assess the inputs systematically to estimate the cost of a new project. This study also closely examines the behavior of the proposed model by evaluating two modified models without considering fmGA and undertaking sensitivity analysis. Evaluation results indicate that, with the ability to more thoroughly respond to the project characteristics, the proposed model has a high probability o...

[1]  Murat Gunduz,et al.  Parametric cost estimation system for light rail transit and metro trackworks , 2011, Expert Syst. Appl..

[2]  Wei-Chih Wang,et al.  AHP- and simulation-based budget determination procedure for public building construction projects , 2008 .

[3]  TaeHoon Hong,et al.  CBR-based cost prediction model-II of the design phase for multi-family housing projects , 2011, Expert Syst. Appl..

[4]  Sangyong Kim,et al.  Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation , 2013 .

[5]  Hojjat Adeli,et al.  Regularization neural network for construction cost estimation , 1998 .

[6]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[7]  Chung-Wei Feng,et al.  Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks , 2006 .

[8]  D. Lowe,et al.  Predicting construction cost using multiple regression techniques , 2006 .

[9]  R. C. Creese,et al.  Cost estimation of timber bridges using neural networks , 1995 .

[10]  John H. Holland,et al.  Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .

[11]  Chin-Teng Lin,et al.  Neural-Network-Based Fuzzy Logic Control and Decision System , 1991, IEEE Trans. Computers.

[12]  Jui-Sheng Chou,et al.  Web-based CBR system applied to early cost budgeting for pavement maintenance project , 2009, Expert Syst. Appl..

[13]  Kleopatra Petroutsatou,et al.  Early Cost Estimating of Road Tunnel Construction Using Neural Networks , 2012 .

[14]  Garold D. Oberlender,et al.  Predicting accuracy of early cost estimates based on estimate quality , 2001 .

[15]  Miroslaw J. Skibniewski,et al.  A neuro-fuzzy computational approach to constructability knowledge acquisition for construction technology evaluation , 1999 .

[16]  Wen-der Yu,et al.  Hybridization of CBR and numeric soft computing techniques for mining of scarce construction databases , 2006 .

[17]  Kyung In Kang,et al.  Hybrid Models of Neural Networks and Genetic Algorithms for Predicting Preliminary Cost Estimates , 2005 .

[18]  Min-Yuan Cheng,et al.  Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model , 2009 .

[19]  Rifat Sonmez,et al.  Parametric Range Estimating of Building Costs Using Regression Models and Bootstrap , 2008 .

[20]  Awad S. Hanna,et al.  New Approach to Developing Conceptual Cost Estimates for Highway Projects , 2011 .

[21]  Chris Hendrickson,et al.  Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .

[22]  Wen-der Yu,et al.  A VaFALCON neuro-fuzzy system for mining of incomplete construction databases , 2006 .

[23]  Boyd C. Paulson,et al.  Professional Construction Management , 1978 .

[24]  Kalyanmoy Deb,et al.  RapidAccurate Optimization of Difficult Problems Using Fast Messy Genetic Algorithms , 1993, ICGA.

[25]  Min-Yuan Cheng,et al.  Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry , 2010, Expert Syst. Appl..

[26]  ChoongWan Koo,et al.  The development of a construction cost prediction model with improved prediction capacity using the advanced CBR approach , 2011, Expert Syst. Appl..

[27]  Wen-der Yu PIREM: a new model for conceptual cost estimation , 2006 .

[28]  ChangTaek Hyun,et al.  MRA-based revised CBR model for cost prediction in the early stage of construction projects , 2012, Expert Syst. Appl..

[29]  Wen-der Yu Closure of "Hybrid Soft Computing Approach for Mining of Complex Construction Databases" , 2007 .

[30]  Shih-Hsu Wang,et al.  Neuro‐Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction , 2012, Comput. Aided Civ. Infrastructure Eng..

[31]  Tarek Hegazy,et al.  NEURAL NETWORK MODEL FOR PARAMETRIC COST ESTIMATION OF HIGHWAY PROJECTS , 1998 .

[32]  Shih-Hsu Wang,et al.  A factor-based probabilistic cost model to support bid-price estimation , 2012, Expert Syst. Appl..