Reliability Analysis of a Maintenance Scheduling Model Under Failure Free Warranty Policy
暂无分享,去创建一个
[1] Abdur Rahim,et al. Reliability for multiple units adopting sequential imperfect maintenance policies , 2015, Int. J. Syst. Assur. Eng. Manag..
[2] Hoang Pham,et al. Availability and mean life time prediction of multistage degraded system with partial repairs , 1997 .
[3] Jitender Kumar,et al. Profit analysis of a 2-out-of-2 redundant system with single standby and degradation of the units after repair , 2013, Int. J. Syst. Assur. Eng. Manag..
[4] Harish Garg,et al. An approach for analyzing the reliability of industrial systems using soft-computing based technique , 2014, Expert Syst. Appl..
[5] Jitender Kumar,et al. Stochastic Modeling of a Single-Unit Repairable System with Preventive Maintenance under Warranty , 2013 .
[6] Eric Châtelet,et al. Optimization of maintenance policy using the proportional hazard model , 2009, Reliab. Eng. Syst. Saf..
[7] Harish Garg,et al. An approach for analyzing the reliability and profit of an industrial system based on the cost free warranty policy , 2018 .
[8] Kit-Nam Francis Leung,et al. Inspection schedules when the lifetime distribution of a single-unit system is completely unknown , 2001, Eur. J. Oper. Res..
[9] S. C. Malik. Reliability modeling of a computer system with preventive maintenance and priority subject to maximum operation and repair times , 2013, Int. J. Syst. Assur. Eng. Manag..
[10] Anna Jodejko-Pietruczuk,et al. Development and sensitivity analysis of a technical object inspection model based on the delay-time concept use , 2017 .
[11] Rui Peng,et al. A preventive maintenance model with a two-level inspection policy based on a three-stage failure process , 2014, Reliab. Eng. Syst. Saf..
[12] Jitender Kumar,et al. MTSF (mean time to system failure) and profit analysis of a single-unit system with inspection for feasibility of repair beyond warranty , 2016, Int. J. Syst. Assur. Eng. Manag..
[13] P.K. Kapur,et al. Joint Optimum Preventive-Maintenance and Repair-Limit Replacement Policies , 1980, IEEE Transactions on Reliability.
[14] Harish Garg,et al. Reliability, Availability and Maintainability Analysis of Industrial Systems Using PSO and Fuzzy Methodology , 2014 .
[15] Jitender Kumar,et al. Probabilistic analysis of two reliability models of a single-unit system with preventive maintenance beyond warranty and degradation , 2015 .
[16] Gwo-Liang Liao,et al. Optimum policy for a production system with major repair and preventive maintenance , 2012 .
[17] Serkan Eryilmaz. A reliability model for a three-state degraded system having random degradation rates , 2016, Reliab. Eng. Syst. Saf..
[18] G. S. Mokaddis,et al. A three-unit standby redundant system with repair and preventive maintenance , 1990 .
[19] Harish Garg,et al. A Hybrid GA-GSA Algorithm for Optimizing the Performance of an Industrial System by Utilizing Uncertain Data , 2015 .
[20] Rakesh Gupta. Probabilistic analysis of a two-unit cold standby system with two-phase repair and preventive maintenance , 1986 .
[21] Lin Li,et al. Option model for joint production and preventive maintenance system , 2009 .
[22] D. Cox. The analysis of non-Markovian stochastic processes by the inclusion of supplementary variables , 1955, Mathematical Proceedings of the Cambridge Philosophical Society.
[23] M. A. Hariga. A maintenance inspection model for a single machine with general failure distribution , 1996 .
[24] Suresh Kumar,et al. Cost analysis of a two dissimilar cold standby system with preventive maintenance and replacement of standby , 1994 .
[25] David He,et al. Analysis of sequential failures for assessment of reliability and safety of manufacturing systems , 2002, Reliab. Eng. Syst. Saf..
[26] Harish Garg,et al. Performance analysis of an industrial system using soft computing based hybridized technique , 2017 .
[27] Beena Nailwal,et al. RELIABILITY AND SENSITIVITY ANALYSIS OF AN OPERATING SYSTEM WITH INSPECTION IN DIFFERENT WEATHER CONDITIONS , 2012 .
[28] Shigeru Yanagi,et al. Availability of a Parallel Redundant System with Preventive Maintenance and Common-Cause Failures , 1992 .
[29] Mangey Ram,et al. Performability analysis of a system under 1-out-of-2:G scheme with perfect reworking , 2015 .
[30] Harish Garg,et al. Preventive maintenance scheduling of the pulping unit in a paper plant , 2013 .
[31] R. K. Tuteja,et al. A system with pre-inspection and two types of repairman , 1994 .
[32] V. Rusev,et al. On Solution of Renewal Equation in the Weibull-Gnedenko Model , 2017 .
[33] Christophe Bérenguer,et al. On the inspection policy of a two-component parallel system with failure interaction , 2005, Reliab. Eng. Syst. Saf..
[34] M. S. Kadyan. Reliability and Profit Analysis of a Single-Unit System with Preventive Maintenance Subject to Maximum Operation Time , 2013 .
[35] Charles E Ebeling,et al. An Introduction to Reliability and Maintainability Engineering , 1996 .
[36] M. S. Kadyan,et al. Cost benefit analysis of a single-unit system with warranty for repair , 2013, Appl. Math. Comput..
[37] Harish Garg,et al. Reliability analysis of repairable systems using Petri nets and vague Lambda-Tau methodology. , 2013, ISA transactions.