An integrated model for order release and due‐date demand management
暂无分享,去创建一个
[1] Steven A. Melnyk,et al. Order review/release: research issues and perspectives , 1989 .
[2] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[3] P. M. Bobrowski,et al. Work release strategies in a dual resource constrained job shop , 1989 .
[4] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[5] Timothy D. Fry,et al. Capacity-based order review/release strategies to improve manufacturing performance , 1992 .
[6] Yong Yue,et al. Manufacturing responsiveness through integrated process planning and scheduling , 1999 .
[7] Timothy D. Fry,et al. Order review/release in the absence of adherence to formal scheduling policies , 1999 .
[8] R. M. Hodgson,et al. JOB SHOPS SCHEDULING WITH DUE DATES , 1967 .
[9] Ihsan Sabuncuoglu,et al. A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops , 2000, Decis. Sci..
[10] Kevin J. Dooley,et al. Dynamic rules for due-date assignment , 1991 .
[11] Mark S. Fox,et al. Intelligent Scheduling , 1998 .
[12] R.-K. Li,et al. Integrating order release control with due-date assignment rules , 1997 .
[13] Feng-Chang R. Chang. A study of due-date assignment rules with constrained tightness in a dynamic job shop , 1996 .
[14] Samuel Eilon,et al. Due dates in job shop scheduling , 1976 .