Analysis and improvement of multi-product assembly systems: an application study at a furniture manufacturing plant
暂无分享,去创建一个
[1] J.-T. Lim,et al. Improvability of assembly systems. I. Problem formulation and performance evaluation , 1998, Proceedings of the 37th IEEE Conference on Decision and Control (Cat. No.98CH36171).
[2] Semyon M. Meerkov,et al. Assembly systems with non-exponential machines: Throughput and bottlenecks , 2008 .
[3] Young Jae Jang. Mathematical modeling and analysis of flexible production lines , 2007 .
[4] Norbert Ostendorf. Different Products. , 2009, Deutsches Arzteblatt international.
[5] Stanley B. Gershwin,et al. A decomposition method for analyzing inhomogeneous assembly/disassembly systems , 2000, Ann. Oper. Res..
[6] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[7] Stephan Biller,et al. Bottlenecks in Bernoulli Serial Lines With Rework , 2010, IEEE Transactions on Automation Science and Engineering.
[8] Stephan Biller,et al. Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study , 2010, IEEE Transactions on Automation Science and Engineering.
[9] Stephan Biller,et al. Indicators for quality improvability and bottleneck sequence in flexible manufacturing systems with batch production , 2012 .
[10] Andrea Matta,et al. Performance evaluation of production lines with finite buffer capacity producing two different products , 2005, OR Spectr..
[11] Georg N. Krieg,et al. Analysis of Multi-Product Kanban Systems with State-Dependent Setups and Lost Sales , 2004, Ann. Oper. Res..
[12] John A. Buzacott,et al. Approximate models of assembly systems with finite inventory banks , 1990 .
[13] Andrea Matta,et al. Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers , 2008 .
[14] Michael Gregory,et al. Manufacturing Systems Engineering , 2015 .
[15] Semyon M. Meerkov,et al. c-bottlenecks in serial production lines: identification and application , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).
[16] Jingshan Li,et al. Throughput analysis of production systems: recent advances and future topics , 2009 .
[17] Ningjian Huang,et al. Modeling and analysis of a multiple product manufacturing system with split and merge , 2004, IEEE International Conference on Robotics and Automation, 2004. Proceedings. ICRA '04. 2004.
[18] MengChu Zhou,et al. Modeling, Simulation, and Control of Flexible Manufacturing Systems - A Petri Net Approach , 1999, Series in Intelligent Control and Intelligent Automation.
[19] Chong Wang,et al. Approximate Analysis of Re-Entrant Lines with Bernoulli Reliability Models , 2007, 2007 IEEE International Conference on Automation Science and Engineering.
[20] Jong-Tae Lim,et al. Bottlenecks in serial production lines: A system-theoretic approach , 1996 .
[21] Jong-Tae Lim,et al. Improvability of assembly systems II: Improvability indicators and case study , 2000 .
[22] Richard P. Vlosky,et al. A Brief Overview of the U.S. Furniture Industry , 2010 .
[23] Ben Atkinson,et al. Queueing theory in manufacturing systems analysis and design , 1993 .
[24] Li Zheng,et al. The robustness of scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers , 2012, Comput. Ind. Eng..
[25] Semyon M. Meerkov,et al. Bottlenecks with respect to due-time performance in pull serial production lines , 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065).
[26] Jingshan Li,et al. Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers , 2012 .
[27] Jingshan Li,et al. Throughput analysis in automotive paint shops: a case study , 2004, IEEE Transactions on Automation Science and Engineering.
[28] Stanley B. Gershwin,et al. Assembly/Disassembly Systems: An Efficient Decomposition Algorithm for Tree-Structured Networks , 1991 .
[29] Jingshan Li,et al. Overlapping decomposition: a system-theoretic method for modeling and analysis of complex manufacturing systems , 2005, IEEE Transactions on Automation Science and Engineering.
[30] J. A. Buzacott,et al. Flexible manufacturing systems: a review of analytical models , 1986 .
[31] Semyon M. Meerkov,et al. DT-bottlenecks in serial production lines: theory and application , 2000, IEEE Trans. Robotics Autom..
[32] J.-T. Lim,et al. Homogeneous, asymptotically reliable serial production lines: theory and case study , 1989, Proceedings. ICCON IEEE International Conference on Control and Applications.
[33] Reinaldo Morabito,et al. Production planning in furniture settings via robust optimization , 2012, Comput. Oper. Res..
[34] John A. Sharp,et al. A review of manufacturing flexibility , 2000, Eur. J. Oper. Res..
[35] Semyon M. Meerkov,et al. Customer demand satisfaction in production systems: a due-time performance approach , 2001, IEEE Trans. Robotics Autom..
[36] Stephan Biller,et al. Quality bottleneck transitions in flexible manufacturing systems with batch productions , 2013 .
[37] Semyon M. Meerkov,et al. Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks , 2011, Ann. Oper. Res..
[38] Semyon M. Meerkov,et al. c-Bottlenecks in serial production lines: Identification andapplication , 2001 .
[39] Georg N. Krieg,et al. A decomposition method for multi-product kanban systems with setup times and lost sales , 2002 .
[40] Jingshan Li,et al. Analysis of Multiproduct Manufacturing Systems With Homogeneous Exponential Machines , 2014, IEEE Trans Autom. Sci. Eng..
[41] S. Vickery,et al. Dimensions of manufacturing strength in the furniture industry , 1997 .
[42] Suresh P. Sethi,et al. Flexibility in manufacturing: A survey , 1990 .
[43] Semyon M. Meerkov,et al. Bottlenecks in Markovian production lines: a systems approach , 1998, IEEE Trans. Robotics Autom..
[44] Heinrich Kuhn,et al. Flexible Manufacturing Systems: Decision Support for Design and Operation , 1993 .
[45] Stephan Biller,et al. Bottlenecks in Production Lines with Rework: A Systems Approach , 2008 .
[46] Semyon M. Meerkov,et al. Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design , 2010 .
[47] Maria Di Mascolo,et al. Modeling and Analysis of Assembly Systems with Unreliable Machines and Finite Buffers , 1991 .
[48] Chong Wang,et al. Approximate Analysis of Reentrant Lines With Bernoulli Reliability Model , 2010, IEEE Transactions on Automation Science and Engineering.
[49] R. Radharamanan,et al. Quality and productivity improvement in a custom-made furniture industry using Kaizen , 1996 .
[50] Ningjian Huang,et al. Modelling and analysis of a multiple product manufacturing system with split and merge , 2005 .