Analysis and improvement of multi-product assembly systems: an application study at a furniture manufacturing plant

In this paper, we introduce an application study of modelling, analysis and continuous improvement of an assembly system at a furniture manufacturing plant using production systems engineering methods. Analytical models have been developed to characterise the assembly system making multiple products, and recursive procedures have been derived to evaluate line production rate. Lot size analysis is carried out, and bottleneck analysis methods are introduced to identify the bottlenecks, whose improvement can lead to the largest improvement in system performance. Such methods provide a quantitative tool for plant engineers and managers to operate and improve assembly line with high productivity, and are also applicable to other large-volume manufacturing systems.

[1]  J.-T. Lim,et al.  Improvability of assembly systems. I. Problem formulation and performance evaluation , 1998, Proceedings of the 37th IEEE Conference on Decision and Control (Cat. No.98CH36171).

[2]  Semyon M. Meerkov,et al.  Assembly systems with non-exponential machines: Throughput and bottlenecks , 2008 .

[3]  Young Jae Jang Mathematical modeling and analysis of flexible production lines , 2007 .

[4]  Norbert Ostendorf Different Products. , 2009, Deutsches Arzteblatt international.

[5]  Stanley B. Gershwin,et al.  A decomposition method for analyzing inhomogeneous assembly/disassembly systems , 2000, Ann. Oper. Res..

[6]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[7]  Stephan Biller,et al.  Bottlenecks in Bernoulli Serial Lines With Rework , 2010, IEEE Transactions on Automation Science and Engineering.

[8]  Stephan Biller,et al.  Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study , 2010, IEEE Transactions on Automation Science and Engineering.

[9]  Stephan Biller,et al.  Indicators for quality improvability and bottleneck sequence in flexible manufacturing systems with batch production , 2012 .

[10]  Andrea Matta,et al.  Performance evaluation of production lines with finite buffer capacity producing two different products , 2005, OR Spectr..

[11]  Georg N. Krieg,et al.  Analysis of Multi-Product Kanban Systems with State-Dependent Setups and Lost Sales , 2004, Ann. Oper. Res..

[12]  John A. Buzacott,et al.  Approximate models of assembly systems with finite inventory banks , 1990 .

[13]  Andrea Matta,et al.  Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers , 2008 .

[14]  Michael Gregory,et al.  Manufacturing Systems Engineering , 2015 .

[15]  Semyon M. Meerkov,et al.  c-bottlenecks in serial production lines: identification and application , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).

[16]  Jingshan Li,et al.  Throughput analysis of production systems: recent advances and future topics , 2009 .

[17]  Ningjian Huang,et al.  Modeling and analysis of a multiple product manufacturing system with split and merge , 2004, IEEE International Conference on Robotics and Automation, 2004. Proceedings. ICRA '04. 2004.

[18]  MengChu Zhou,et al.  Modeling, Simulation, and Control of Flexible Manufacturing Systems - A Petri Net Approach , 1999, Series in Intelligent Control and Intelligent Automation.

[19]  Chong Wang,et al.  Approximate Analysis of Re-Entrant Lines with Bernoulli Reliability Models , 2007, 2007 IEEE International Conference on Automation Science and Engineering.

[20]  Jong-Tae Lim,et al.  Bottlenecks in serial production lines: A system-theoretic approach , 1996 .

[21]  Jong-Tae Lim,et al.  Improvability of assembly systems II: Improvability indicators and case study , 2000 .

[22]  Richard P. Vlosky,et al.  A Brief Overview of the U.S. Furniture Industry , 2010 .

[23]  Ben Atkinson,et al.  Queueing theory in manufacturing systems analysis and design , 1993 .

[24]  Li Zheng,et al.  The robustness of scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers , 2012, Comput. Ind. Eng..

[25]  Semyon M. Meerkov,et al.  Bottlenecks with respect to due-time performance in pull serial production lines , 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065).

[26]  Jingshan Li,et al.  Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times and finite buffers , 2012 .

[27]  Jingshan Li,et al.  Throughput analysis in automotive paint shops: a case study , 2004, IEEE Transactions on Automation Science and Engineering.

[28]  Stanley B. Gershwin,et al.  Assembly/Disassembly Systems: An Efficient Decomposition Algorithm for Tree-Structured Networks , 1991 .

[29]  Jingshan Li,et al.  Overlapping decomposition: a system-theoretic method for modeling and analysis of complex manufacturing systems , 2005, IEEE Transactions on Automation Science and Engineering.

[30]  J. A. Buzacott,et al.  Flexible manufacturing systems: a review of analytical models , 1986 .

[31]  Semyon M. Meerkov,et al.  DT-bottlenecks in serial production lines: theory and application , 2000, IEEE Trans. Robotics Autom..

[32]  J.-T. Lim,et al.  Homogeneous, asymptotically reliable serial production lines: theory and case study , 1989, Proceedings. ICCON IEEE International Conference on Control and Applications.

[33]  Reinaldo Morabito,et al.  Production planning in furniture settings via robust optimization , 2012, Comput. Oper. Res..

[34]  John A. Sharp,et al.  A review of manufacturing flexibility , 2000, Eur. J. Oper. Res..

[35]  Semyon M. Meerkov,et al.  Customer demand satisfaction in production systems: a due-time performance approach , 2001, IEEE Trans. Robotics Autom..

[36]  Stephan Biller,et al.  Quality bottleneck transitions in flexible manufacturing systems with batch productions , 2013 .

[37]  Semyon M. Meerkov,et al.  Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks , 2011, Ann. Oper. Res..

[38]  Semyon M. Meerkov,et al.  c-Bottlenecks in serial production lines: Identification andapplication , 2001 .

[39]  Georg N. Krieg,et al.  A decomposition method for multi-product kanban systems with setup times and lost sales , 2002 .

[40]  Jingshan Li,et al.  Analysis of Multiproduct Manufacturing Systems With Homogeneous Exponential Machines , 2014, IEEE Trans Autom. Sci. Eng..

[41]  S. Vickery,et al.  Dimensions of manufacturing strength in the furniture industry , 1997 .

[42]  Suresh P. Sethi,et al.  Flexibility in manufacturing: A survey , 1990 .

[43]  Semyon M. Meerkov,et al.  Bottlenecks in Markovian production lines: a systems approach , 1998, IEEE Trans. Robotics Autom..

[44]  Heinrich Kuhn,et al.  Flexible Manufacturing Systems: Decision Support for Design and Operation , 1993 .

[45]  Stephan Biller,et al.  Bottlenecks in Production Lines with Rework: A Systems Approach , 2008 .

[46]  Semyon M. Meerkov,et al.  Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design , 2010 .

[47]  Maria Di Mascolo,et al.  Modeling and Analysis of Assembly Systems with Unreliable Machines and Finite Buffers , 1991 .

[48]  Chong Wang,et al.  Approximate Analysis of Reentrant Lines With Bernoulli Reliability Model , 2010, IEEE Transactions on Automation Science and Engineering.

[49]  R. Radharamanan,et al.  Quality and productivity improvement in a custom-made furniture industry using Kaizen , 1996 .

[50]  Ningjian Huang,et al.  Modelling and analysis of a multiple product manufacturing system with split and merge , 2005 .