Synchronisation for smart factory - towards IoT-enabled mechanisms
暂无分享,去创建一个
Ming Li | George Q. Huang | Jian Chen | Meilin Wang | Peng Lin | Xiangtianrui Kong | Xiang T. R. Kong | Ming Li | Jian Chen | Peng Lin | Meilin Wang | G. Huang
[1] C.-H. Liu,et al. Improving the delivery efficiency of the customer order scheduling problem in a job shop , 2009, Comput. Ind. Eng..
[2] George Q. Huang,et al. Wireless manufacturing: a literature review, recent developments, and case studies , 2009 .
[3] Ray Y. Zhong,et al. RFID-enabled real-time manufacturing execution system for mass-customization production , 2013 .
[4] Christophe Caux,et al. Advanced planning and scheduling systems in aluminium conversion industry , 2006, Int. J. Comput. Integr. Manuf..
[5] Hao Luo,et al. Synchronisation of production scheduling and shipment in an assembly flowshop , 2015 .
[6] James D. Blocher,et al. Customer order scheduling in a general job shop environment , 1998 .
[7] Chung-Lun Li,et al. Coordinated scheduling of customer orders with decentralized machine locations , 2007 .
[8] T. C. Edwin Cheng,et al. Customer order scheduling to minimize total weighted completion time , 2007 .
[9] Ramesh Sharda,et al. Production , Manufacturing and Logistics RFID-enabled track and traceability in job-shop scheduling environment , 2013 .
[10] Kenn Steger-Jensen,et al. Technical and industrial issues of Advanced Planning and Scheduling (APS) systems , 2010, Comput. Ind..
[11] Mostafa Zandieh,et al. A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times , 2011, J. Intell. Manuf..
[12] Huaiqing Wang,et al. Multi-agent-based proactive–reactive scheduling for a job shop , 2012 .
[13] Jürgen Branke,et al. Setup-oriented dispatching rules – a survey , 2012 .
[14] Dick Johnson,et al. RFID tags improve tracking, quality on Ford line in Mexico , 2002 .
[15] Kenn Steger-Jensen,et al. Advanced planning and scheduling technology , 2011 .
[16] Mostafa Zandieh,et al. A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems , 2010, J. Intell. Manuf..
[17] George Q. Huang,et al. Hybrid flowshop scheduling with family setup time and inconsistent family formation , 2012 .
[18] Xuedong Liang,et al. An RFID-based intelligent decision support system architecture for production monitoring and scheduling in a distributed manufacturing environment , 2015 .
[19] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[20] Weiming Shen,et al. Agent-based distributed manufacturing process planning and scheduling: a state-of-the-art survey , 2006, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).
[21] Hao Luo,et al. Active scheduling for hybrid flowshop with family setup time and inconsistent family formation , 2015, J. Intell. Manuf..
[22] Ping Ji,et al. A mixed integer programming model for advanced planning and scheduling (APS) , 2007, Eur. J. Oper. Res..
[23] Ting Qu,et al. Agent-based Smart Gateway for RFID-enabled real-time wireless manufacturing , 2011 .
[24] Ray Y. Zhong,et al. RFID-enabled real-time advanced planning and scheduling shell for production decision making , 2013, Int. J. Comput. Integr. Manuf..
[25] Tao Jiang,et al. Parameter inference for non-repairable multi-state system reliability models by multi-level observation sequences , 2017, Reliab. Eng. Syst. Saf..
[26] Bertrand M. T. Lin,et al. Customer order scheduling to minimize the number of late jobs , 2007, Eur. J. Oper. Res..
[27] R. Logendran,et al. Makespan minimization of a flowshop sequence-dependent group scheduling problem , 2011 .
[28] Jay Lee,et al. A Cyber-Physical Systems architecture for Industry 4.0-based manufacturing systems , 2015 .
[29] Yohanan Arzi,et al. Dispatching in a workstation belonging to a re-entrant production line under sequence-dependent set-up times , 1998 .