Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan
暂无分享,去创建一个
[1] Amund Bruland,et al. Causes of Delay in Road Construction Projects , 2012 .
[2] N. Kartam,et al. Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .
[3] Ayman Abu Hammad,et al. Delays in construction projects: The case of Jordan , 2008 .
[4] Nashwan Dawood,et al. Comparative study of delay factors in Libyan and the UK construction industry , 2012 .
[5] Ghaleb J. Sweis,et al. Statistical Analysis on the Cost and Duration of Public Building Projects , 2010 .
[6] Mohammed Al-Khalil,et al. Important causes of delay in public utility projects in Saudi Arabia , 1999 .
[7] Fred L. Mannering,et al. The statistical analysis of crash-frequency data: A review and assessment of methodological alternatives , 2010 .
[8] Khaled Nassar,et al. Evaluating Cost Overruns of Asphalt Paving Project using Statistical Process Control Methods , 2005 .
[9] Ernawati,et al. The significant factors causing delay of building construction projects in Malaysia , 2007 .
[10] Shu-Chien Hsu,et al. Knowledge Management for Risk Hedging by Construction Material Suppliers , 2012 .
[11] S. Acharya,et al. Improvement in the nutraceutical properties of fenugreek (Trigonella foenum-graecum L.) , 2006 .
[12] G. O. Jagboro,et al. The effects of construction delays on project delivery in Nigerian construction industry , 2002 .
[13] Long Le-Hoai,et al. Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries , 2008 .
[14] Sameh M. El-Sayegh,et al. Significant factors causing delay in the UAE construction industry , 2006 .
[15] Peter E.D. Love,et al. Determining the Probability of Project Cost Overruns , 2013 .
[16] Hesham A. Bassioni,et al. Causes of Delay in Building Construction Projects in Egypt , 2008 .
[17] Sebastian Morris,et al. Cost and Time Overruns in Public Sector Projects , 2005 .
[18] K. N. Jha,et al. Important Factors for Success of Public Construction Projects , 2022 .
[19] T. Mezher,et al. Causes of delays in the construction industry in Lebanon , 1998 .
[20] Andrew S. Chang. Reasons for cost and schedule increase for engineering design projects , 2002 .
[21] Anil Sawhney,et al. Analysing factors affecting delays in Indian construction projects , 2012 .
[22] A. M. Odeh,et al. Causes of construction delay: traditional contracts , 2002 .
[23] Ayman H. Al-Momani,et al. Construction delay: a quantitative analysis , 2000 .
[24] Yimin Zhu,et al. Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms , 2012 .
[25] S. Ogunlana,et al. Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .
[26] Murat Gunduz,et al. Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey , 2013 .
[27] Gary David Holt,et al. Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .
[28] Sławomir Biruk,et al. THE CONCEPTUAL FRAMEWORK FOR CONSTRUCTION PROJECT RISK ASSESSMENT , 2011 .
[29] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[30] Ismail Abdul Rahman,et al. Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia , 2012 .