Analytical models of vehicle-based automated material handling systems in semiconductor fabs
暂无分享,去创建一个
[1] John J. Bartholdi,et al. Decentralized Control of Automated Guided Vehicles on a Simple Loop , 1989 .
[2] Margaret L. Brandeau,et al. Designing Multiple-Load Automated Guided Vehicle Systems for Delivering Material from a Central Depot , 1995 .
[3] John E. Kobza,et al. A stochastic model of empty-vehicle travel time and load request service time in light-traffic material handling systems , 1998 .
[4] Iris F. A. Vis,et al. Survey of research in the design and control of automated guided vehicle systems , 2006, Eur. J. Oper. Res..
[5] Yavuz A. Bozer,et al. Tandem Configurations for Automated Guided Vehicle Systems and the Analysis of Single Vehicle Loops , 1991 .
[6] M. Eric Johnson,et al. Modelling empty vehicle traffic in AGVS design , 2001 .
[7] Yavuz A. Bozer,et al. Expected waiting times in single-device trip-based material handling systems , 1994 .
[8] M. Eric Johnson,et al. An Analytic Model for Design and Analysis of Single-Vehicle Asynchronous Material Handling Systems , 1994, Transp. Sci..
[9] Yavuz A. Bozer,et al. TRIP-BASED MATERIAL HANDLING SYSTEMS: THROUGHPUT CAPACITY ANALYSIS , 1994 .
[10] Brett A. Peters,et al. Queueing network model for a class of material-handling systems , 2003 .