Flexible Work Breakdown Structure for Integrated Cost and Schedule Control
暂无分享,去创建一个
[1] Michael Z.M. Deng,et al. Integrated Cost and Schedule Control: Hong Kong Perspective , 1998 .
[2] Daniel R. McConnell. Earned Value Technique for Performance Measurement , 1985 .
[3] Phillip J. Pratt,et al. Database systems (2nd ed.): management and design , 1991 .
[4] Quentin W. Fleming,et al. Earned Value Project Management , 1996 .
[5] Philip J. Pratt,et al. Database systems - management and design , 1987 .
[6] Roger Frost,et al. International Organization for Standardization (ISO) , 2004 .
[7] G. Edward Gibson,et al. PLANNING FOR COMPUTER INTEGRATED CONSTRUCTION , 1999 .
[8] Chris Hendrickson,et al. Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .
[9] Osama Abudayyeh,et al. Prototype Integrated Cost and Schedule Control System , 1993 .
[10] Neil N. Eldin. Measurement of Work Progress: Quantitative Technique , 1989 .
[11] T Chamberlain,et al. THE CONSTRUCTION INDUSTRY INSTITUTE , 1990 .
[12] Paul M. Teicholz. Current Needs for Cost Control Systems , 1987 .
[13] Neil N. Eldin. Management of Engineering/Design Phase , 1991 .
[14] Osama Abudayyeh,et al. Cost‐ and Schedule‐Control Integration: Issues and Needs , 1991 .