Modelling of cast-in-place concrete tunnel liners condition
暂无分享,去创建一个
[1] Mustafa Karaşahin,et al. Performance models for hot mix asphalt pavements in urban roads , 2016 .
[2] Dulcy M. Abraham,et al. Estimating Transition Probabilities in Markov Chain-Based Deterioration Models for Management of Wastewater Systems , 2006 .
[3] Giancarlo Gioda,et al. Investigation on the Cause of Damages of a Deep Tunnel , 2012 .
[4] S Setunge,et al. Forecasting deterioration of bridge components from visual inspection data , 2015 .
[5] Rainer Winkelmann,et al. Ordered response models , 2006 .
[6] Tarek Zayed,et al. Condition Rating Model for Underground Infrastructure Sustainable Water Mains , 2006 .
[7] A J Hendron,et al. DESIGN RECOMMENDATIONS FOR CONCRETE TUNNEL LININGS. VOLUME 1: RESULTS OF MODEL TESTS AND ANALYTICAL PARAMETER STUDIES; VOLUME 2: SUMMARY OF RESEARCH AND PROPOSED RECOMMENDATIONS. FINAL REPORT , 1983 .
[8] Mohamed A. Meguid,et al. The effect of erosion voids on existing tunnel linings , 2009 .
[9] Ali Limam,et al. Residual strength of underground structures in service , 2016 .
[10] Pierre Breul,et al. Numerical modelling of the deterioration of the Parisian metro infrastructures based on a new auscultation method , 2017 .
[11] Dan M. Frangopol,et al. Life-cycle performance, management, and optimisation of structural systems under uncertainty: accomplishments and challenges 1 , 2011, Structures and Infrastructure Systems.
[12] Susan L. Tighe,et al. Application of Markov chains and Monte Carlo simulations for developing pavement performance models for urban network management , 2018 .
[13] Emad Elwakil,et al. Modelling the effect of various factors on the condition of pavement marking , 2014 .
[14] Chandra R. Bhat,et al. Unobserved heterogeneity and the statistical analysis of highway accident data , 2016 .
[15] M. D. Pandey,et al. The influence of temporal uncertainty of deterioration on life-cycle management of structures , 2009 .
[16] Z. Luo,et al. Pavement performance modelling with an auto-regression approach , 2013 .
[17] Timothy C. Coburn,et al. Statistical and Econometric Methods for Transportation Data Analysis , 2004, Technometrics.
[18] Thierry Verdel,et al. Numerical modelling and mechanical behaviour analysis of ancient tunnel masonry structures , 2008 .
[19] Xiaomo Jiang,et al. Probabilistic degradation modelling of circular tunnels assembled from segmental linings , 2016 .
[20] Samuel Labi,et al. Estimation of rest periods for newly constructed/reconstructed pavements , 2016 .
[21] Nicole Metje,et al. Introduction to Tunnel Construction , 2017 .
[22] Emad Elwakil,et al. Modelling the performance of pavement marking in cold weather conditions , 2010 .
[23] Dulcy M. Abraham,et al. CHALLENGING ISSUES IN MODELING DETERIORATION OF COMBINED SEWERS , 2001 .
[24] Hong-wei Huang,et al. Characterization of Crack and Leakage Defects of Concrete Linings of Road Tunnels in China , 2018, ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering.
[25] J. McDonald,et al. A generalized ordered Probit model , 2020, Communications in Statistics - Theory and Methods.
[26] Samuel Labi,et al. Methodology for Probabilistic Modeling of Highway Bridge Infrastructure Condition: Accounting for Improvement Effectiveness and Incorporating Random Effects , 2017 .
[27] Dániel Honfi,et al. Consideration of uncertainties in LCA for infrastructure using probabilistic methods , 2019, Structure and Infrastructure Engineering.
[28] John O Sobanjo,et al. State transition probabilities in bridge deterioration based on Weibull sojourn times , 2011 .
[29] Shuchen Li,et al. Study on the Defects Characteristics of Water Leaking of Old Tunnels in Cold Regions , 2011 .
[30] Soheil Nazarian,et al. Case Study on Tunnel Lining Assessment Using Stress Wave-Based Nondestructive Testing Methods , 2014 .
[31] Jianhang Liu,et al. Assessment service state of tunnel structure , 2012 .
[32] Steve Ernst,et al. Tunnel Operations, Maintenance, Inspection, and Evaluation (TOMIE) Manual , 2015 .
[33] Aixi Zhu,et al. Efficient Crack Detection Method for Tunnel Lining Surface Cracks Based on Infrared Images , 2017, J. Comput. Civ. Eng..
[34] Shing Chung Josh Wong,et al. Random parameter probit models to analyze pedestrian red-light violations and injury severity in pedestrian–motor vehicle crashes at signalized crossings , 2020, Journal of Transportation Safety & Security.
[35] Jackeline Murillo-Hoyos,et al. Estimation of Routine Maintenance Expenditures for Highway Pavement Segments: Accounting for Heterogeneity Using Random-Effects Models , 2017 .
[36] Don Chen,et al. Sigmoidal Models for Predicting Pavement Performance Conditions , 2016 .
[37] Jian Hong Wang. Lifecycle cost and performance analysis for repair of concrete tunnels , 2018 .
[38] Jure Radić,et al. Life-cycle performance model based on homogeneous Markov processes , 2011 .
[39] T R Kuesel,et al. Tunnel Engineering Handbook , 1981 .