Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures

This paper focuses on problems and their causes and cures in policy and planning for large-infrastructure projects. First, it identifies as the main problem in major infrastructure developments pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation is cost overruns, benefit shortfalls, and waste. Second, it explores the causes of misinformation and finds that political-economic explanations best account for the available evidence: planners and promoters deliberately misrepresent costs, benefits, and risks in order to increase the likelihood that it is their projects, and not those of their competition, that gain approval and funding. This results in the ‘survival of the unfittest’, in which often it is not the best projects that are built, but the most misrepresented ones. Finally, it presents measures for reforming policy and planning for large-infrastructure projects with a focus on better planning methods and changed governance structures, the latter being more important.

[1]  Hugo Priemus,et al.  Development and Design of Large Infrastructure Projects: Disregarded Alternatives and Issues of Spatial Planning , 2007 .

[2]  A. Tversky,et al.  Prospect theory: an analysis of decision under risk — Source link , 2007 .

[3]  B. Flyvbjerg Measuring Inaccuracy in Travel Demand Forecasting: Methodological Considerations Regarding Ramp Up and Sampling , 2005, 1303.7401.

[4]  Bent Flyvbjerg,et al.  Design by Deception: The Politics of Megaproject Approval , 2005 .

[5]  Adrian Davies,et al.  Mega-projects (The changing politics of Urban Public Investment), Alan Altshuler, David Luberoff. Brookings Institution (2003), 399pp., £39.95(hard), £16.75 (soft). , 2005 .

[6]  Søren L. Buhl,et al.  How (In)accurate Are Demand Forecasts in Public Works Projects?: The Case of Transportation , 2005, 1303.6654.

[7]  A. Nelson Mega-Projects: The Changing Politics of Urban Public Investment , 2004 .

[8]  Bent Flyvbjerg Megaprojects and Risk: A Conversation with Bent Flyvbjerg , 2004 .

[9]  Procedures for Dealing with Optimism Bias in Transport Planning , 2004 .

[10]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[11]  IRBA CODE,et al.  Code of Professional Conduct , 1990, Journal of the American College of Surgeons.

[12]  S. Asmervik,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2004 .

[13]  B. Flyvbjerg Delusions of Success: Comment on Dan Lovallo and Daniel Kahneman , 2003, 1305.0741.

[14]  Vanessa Watson,et al.  Conflicting rationalities: implications for planning theory and ethics , 2003 .

[15]  D. Kahneman,et al.  Delusions of success. How optimism undermines executives' decisions. , 2003, Harvard business review.

[16]  B. Flyvbjerg,et al.  Megaprojects and Risk. An Anatomy of Ambition , 2003, 1303.7404.

[17]  農林水産奨励会農林水産政策情報センター,et al.  The green book : appraisal and evaluation in central government , 2003 .

[18]  D. Kahneman,et al.  Heuristics and Biases: The Psychology of Intuitive Judgment , 2002 .

[19]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[20]  M. Zanna,et al.  Thinking and caring about cognitive inconsistency: when and for whom does attitudinal ambivalence feel uncomfortable? , 2002, Journal of personality and social psychology.

[21]  Dave Bartlett,et al.  The Politics of Lying: Implications for Democracy , 2000 .

[22]  D. Greenwood Rationality and Power: Democracy in Practice , 2000 .

[23]  Dave Bartlett,et al.  The Politics of Lying , 2000 .

[24]  O. Yiftachel,et al.  Planning and Social Control: Exploring the Dark Side , 1998 .

[25]  D. Kahneman New Challenges to the Rationality Assumption , 1997, Legal Theory.

[26]  R. Buehler,et al.  The Role of Motivated Reasoning in Optimistic Time Predictions , 1997 .

[27]  Martin Wachs,et al.  Transportation Planning on Trial: The Clean Air Act and Travel Forecasting , 1996 .

[28]  Bent Flyvbjerg,et al.  The Dark Side of Planning: Rationality and 'Realrationalität' , 1996 .

[29]  Luigi Mazza,et al.  Explorations in planning theory , 1996 .

[30]  R. Buehler,et al.  Exploring the "planning fallacy": Why people underestimate their task completion times. , 1994 .

[31]  D. Kahneman,et al.  Timid choices and bold forecasts: a cognitive perspective on risk taking , 1993 .

[32]  MORAL IMPERATIVES,et al.  ACM code of ethics and professional conduct , 1991, CSOC.

[33]  Martin Wachs,et al.  Ethics and Advocacy in Forecasting for Public Policy , 1990 .

[34]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[35]  P. Gordon,et al.  The determinants of light-rail transit demand—An international cross-sectional comparison , 1984 .

[36]  Richard Lindley Lying: Moral Choice in Public and Private Life , 1980 .

[37]  A. Tversky,et al.  Prospect Theory : An Analysis of Decision under Risk Author ( s ) : , 2007 .

[38]  S. Bok,et al.  Lying: Moral Choice in Public and Private Life , 1979 .

[39]  R. L. Henshel,et al.  Forecasting: An Appraisal for Policy-Makers and Planners. , 1978 .