Improving the Pressurized Flushing Efficiency in Reservoirs: an Experimental Study

Sediment flushing in many reservoirs of the world is accomplished with low efficiency. In this study, a new configuration was proposed for reservoir bottom outlet to increase the pressurized flushing efficiency. In the new configuration, a projecting semi-circular structure was connected to the upstream edge of bottom outlet. It was observed that by employing the projecting bottom outlet, the sediment removal efficiency increased significantly compared to the flushing via typical bottom outlet. In the case of new-configuration bottom outlet with Lsc/Doutlet = 5.26 and Dsc/Doutlet = 1.32, the dimensionless length, width and depth of flushing cone increased 280%, 45% and 14%, respectively, compared to the reference test. The proposed structure can ensure the sustainable use of reservoirs.

[1]  D. Powell Sediment transport upstream of orifices , 2007 .

[2]  W. White,et al.  The feasibility of flushing sediments through reservoirs , 1984 .

[3]  J. C. Womack,et al.  Investigation and evaluation of 102-BX tank leak , 1971 .

[4]  Mehdi Ghomeshi,et al.  Physical modelling of pressure flushing for desilting of non-cohesive sediment , 2010 .

[5]  R. Hotchkiss Reservoir Sedimentation and Sediment Sluicing: Experimental and Numerical Analysis , 1990 .

[6]  Anton Schleiss,et al.  Sediment Evacuation from Reservoirs through Intakes by Jet-Induced Flow , 2015 .

[7]  N. Talebbeydokhti FLUSHING SEDIMENT THROUGH RESERVOIRS , 2005 .

[8]  Ú. Erlingsson,et al.  Measurement and quantification of a sedimentation budget for a reservoir with regular flushing , 2000 .

[9]  Gregory L. Morris,et al.  Reservoir Sedimentation. II: Reservoir Desiltation and Long‐Term Storage Capacity , 1992 .

[10]  A. Khan,et al.  Flow Field Upstream of an Orifice under Fixed Bed and Equilibrium Scour Conditions , 2015 .

[11]  Abdul A. Khan,et al.  Scour upstream of a circular orifice under constant head , 2012 .

[12]  Samad Emamgholizadeh,et al.  INVESTIGATION AND EVALUATION OF THE PRESSURE FLUSHING THROUGH STORAGE RESERVOIR , 2006 .

[13]  Mohamad Reza Madadi,et al.  Sediment flushing upstream of large orifices: An experimental study , 2016 .

[14]  C. Sloff Reservoir sedimentation; a literature survey , 1991 .

[15]  Tomoyoshi Okamura,et al.  MEASUREMENT OF THE FLOW AROUND THE SUBMERGED VORTEX CAVITATION IN A PUMP INTAKE BY MEANS OF PIV , 2003 .

[16]  Michael Tritthart,et al.  Numerical and physical modelling concerning the removal of sediment deposits from reservoirs , 2004 .

[17]  Gholamreza Naser,et al.  Evolution of Developing Flushing Cone during the Pressurized Flushing in Reservoir Storage , 2009 .

[18]  K. Mahmood,et al.  Reservoir Sedimentation: Impact, Extent and Mitigation , 1987 .

[19]  Jihn-Sung Lai,et al.  Flushing sediment through reservoirs , 1996 .

[20]  S. Kantoush Experimental study on the influence of the geometry of shallow reservoirs on flow patterns and sedimentation by suspended sediments , 2008 .

[21]  Michael A. Stevens,et al.  Reservoir Sedimentation Handbook—Design and Management of Dams, Reservoirs, and Watershed for Sustainable Use , 2000 .