Reheat furnace scheduling with energy consideration

This paper focuses on the reheat furnace scheduling problem (RFSP) which is to assign the slabs to the reheat furnace, make the slab sequence for each furnace and determine the feed-in time and the residence time for each slab in order to reduce the unnecessary energy consumption reflected by minimising the objective under consideration. Differing from the traditional scheduling problem, the actual residence time of each slab in RFSP needs to be decided and it is correlated with its neighbour slabs in the reheating sequence of the same furnace. Firstly, the RFSP is formulated as a mixed integer programming model with consideration of the practical production requirements. The strong NP-hardness of the problem motivates us to develop a scatter search (SS) algorithm to solve the problem approximately. The SS algorithm is improved by constraint propagation (CP) for filtering the infeasible solutions in both the generation of the initial solutions and the improvement procedure. To verify the algorithm performance, the proposed algorithm is compared with ILOG CP Optimiser for small-scaled problems and the standard SS, genetic algorithm (GA) for large-scaled practical problems, respectively. The computational results illustrate that the proposed algorithm is relatively effective and efficient.

[1]  Dvir Shabtay,et al.  A survey of scheduling with controllable processing times , 2007, Discret. Appl. Math..

[2]  Giuseppe Paletta,et al.  Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects , 2013, Comput. Oper. Res..

[3]  Pierre Lopez,et al.  Parallel machine scheduling with precedence constraints and setup times , 2010, Comput. Oper. Res..

[4]  Lixin Tang,et al.  A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex , 2000, Eur. J. Oper. Res..

[5]  Rakesh Nagi,et al.  Scheduling to minimize stringer utilization for continuous annealing operations , 2012 .

[6]  Wei Wang,et al.  Charging Plan Model and Scheduling Algorithms for Walking Beam Furnaces , 2006, 2006 6th World Congress on Intelligent Control and Automation.

[7]  Xianpeng Wang,et al.  A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry , 2010, IEEE Transactions on Control Systems Technology.

[8]  Lixin Tang,et al.  A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..

[9]  Rubén Ruiz,et al.  A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times , 2011, Eur. J. Oper. Res..

[10]  Robert H. Storer,et al.  Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties , 2009 .

[11]  Dvir Shabtay,et al.  Just-in-time scheduling with controllable processing times on parallel machines , 2010, J. Comb. Optim..

[12]  Zuren Feng,et al.  A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates , 2010, Comput. Oper. Res..

[13]  Ik Sun Lee,et al.  Minimizing total tardiness for the order scheduling problem , 2013 .

[14]  Christian A. Ullrich Integrated machine scheduling and vehicle routing with time windows , 2013, Eur. J. Oper. Res..

[15]  Rolf H. Möhring,et al.  Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..

[16]  Ethel Mokotoff,et al.  Production , Manufacturing and Logistics An exact algorithm for the identical parallel machine scheduling problem , 2003 .

[17]  Fred W. Glover,et al.  Principles of scatter search , 2006, Eur. J. Oper. Res..

[18]  Fred W. Glover,et al.  A Template for Scatter Search and Path Relinking , 1997, Artificial Evolution.

[19]  Bin Du,et al.  A multi-objective optimisation algorithm for the hot rolling batch scheduling problem , 2013 .

[20]  Michel Gendreau,et al.  The hot strip mill production scheduling problem: A tabu search approach , 1998, Eur. J. Oper. Res..

[21]  Mauro Dell'Amico,et al.  Heuristic and Exact Algorithms for the Identical Parallel Machine Scheduling Problem , 2008, INFORMS J. Comput..

[22]  Erwin Pesch,et al.  Constraint propagation techniques for the disjunctive scheduling problem , 2000, Artif. Intell..