Simulation-based safety evaluation model integrated with network schedule

Construction accidents often lead to project delays. However, in practice, construction safety and schedule control are managed separately. This work develops an innovative simulation-based model, SimSAFE, that assesses the hazard (or expected accident costs) for each activity in a network schedule. Thus, at any time point, safety managers can pay considerable attention to activities (or paths or working zones) with high expected accident costs. Additionally, by breaking down the uncertainty of an accident cause occurring, SimSAFE provides factor-sensitivity information to support safety risk management. Enhancing knowledge of the safety factors (such as safety training and site environment) to which an activity (or path or zone) is sensitive, and also of the activities (or paths or zones) that are most sensitive to a particular factor can provide management with a better sense of what factors and activities (or paths or zones) need to be controlled for reducing construction accidents, especially for a large project or multiple projects.

[1]  Ivan T. Robertson,et al.  Improving safety by the modification of behaviour , 1994 .

[2]  Jimmie Hinze,et al.  Identifying Root Causes of Construction Injuries , 1998 .

[3]  Tariq Haroon Ahmad,et al.  Project management with CPM , 1976 .

[4]  John G. Everett,et al.  Costs of accidents and injuries to the construction industry , 1996 .

[5]  Chi Ming Tam,et al.  Effectiveness of safety management strategies on safety performance in Hong Kong , 1998 .

[6]  Jimmie Hinze,et al.  Addressing construction worker safety in the design phase: Designing for construction worker safety , 1999 .

[7]  Simo Salminen Serious occupational accidents in the construction industry , 1995 .

[8]  John A. Gambatese,et al.  Designing for Construction Worker Safety , 2006 .

[9]  Lia Buarque de Macedo Guimarães,et al.  Safety and production: an integrated planning and control model , 2004 .

[10]  Dongping Fang,et al.  Factor analysis-based studies on construction workplace safety management in China , 2004 .

[11]  Stuart D. Anderson,et al.  Strategies for Achieving Excellence in Construction Safety Performance , 1996 .

[12]  Edward J. Jaselskis,et al.  A survey of construction site safety in Honduras , 1994 .

[13]  Nabil Kartam,et al.  Integrating Safety and Health Performance into Construction CPM , 1997 .

[14]  Daniel Fong,et al.  Factors affecting safety performance on construction sites , 1999 .

[15]  Jimmie Hinze,et al.  Experience Modification Rating As Measure of Safety Performance , 1995 .

[16]  Wei-Chih Wang,et al.  MODEL FOR EVALUATING NETWORKS UNDER CORRELATED UNCERTAINTY--NETCOR , 2000 .

[17]  Alexander Laufer,et al.  ASSESSMENT OF SAFETY PERFORMANCE MEASURES AT CONSTRUCTION SITES , 1986 .

[18]  E. W. Davis,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[19]  Julio C. Martinez,et al.  Stroboscope: State and resource based simulation of construction processes. , 1996 .

[20]  Jimmie Hinze,et al.  Costs of Construction Injuries , 1991 .

[21]  Donn E. Hancher,et al.  Analysis of Safety Indicators in Construction , 1998 .