m,T Group Maintenance Policies
暂无分享,去创建一个
[1] Kyung S. Park. Optimal Number of Minimal Repairs before Replacement , 1979, IEEE Transactions on Reliability.
[2] E. A. Elsayed,et al. An optimum group maintenance policy , 1983 .
[3] Yonah Wilamowsky,et al. A replacement schedule for multicomponent life‐limited parts , 1982 .
[4] Alessandro Birolini,et al. On the Use of Stochastic Processes in Modeling Reliability Problems , 1985 .
[5] David Assaf,et al. On Optimal Replacement Policies , 1982 .
[6] Marcel F. Neuts,et al. Matrix-geometric solutions in stochastic models - an algorithmic approach , 1982 .
[7] Shunji Osaki,et al. Optimum Policies for a Standby System with Preventive Maintenance , 1977 .
[8] Dileep R. Sule,et al. Determination of Coordinated Maintenance Scheduling Frequencies for a Group of Machines , 1979 .
[9] Toshio Nakagawa,et al. Optimal Number of Failures before Replacement Time , 1983, IEEE Transactions on Reliability.
[10] J. J. Brennan,et al. The performance of cannibalization policies in a maintenance system with spares, repair, and resource constraints , 1986 .