Economic Performance of an EWMA Chart for Monitoring MMSE-Controlled Processes
暂无分享,去创建一个
[1] J. Bert Keats,et al. Combining SPC and EPC in a Hybrid Industry , 1998 .
[2] Fugee Tsung,et al. Joint Monitoring of PID-Controlled Processes , 1999 .
[3] Kwok-Leung Tsui,et al. A mean-shift pattern study on integration of SPC and APC for process monitoring , 1999 .
[4] Douglas C. Montgomery,et al. Integrating Statistical Process Control and Engineering Process Control , 1994 .
[5] Wei Jiang,et al. An economic model for integrated APC and SPC control charts , 2000 .
[6] Harriet Black Nembhard,et al. INTEGRATED PROCESS CONTROL FOR STARTUP OPERATIONS , 1998 .
[7] George E. P. Box,et al. Statistical process monitoring and feedback adjustment: a discussion , 1992 .
[8] S. A. Vander Wiel,et al. Monitoring processes that wander using integrated moving average models , 1996 .