Implementing Integrated Project Delivery on Department of the Navy Construction Projects
暂无分享,去创建一个
[1] Kelly J. Schmader. Partnered Project Performance in the U.S. Naval Facilities Engineering Command , 1994 .
[2] Barbara Colledge,et al. Relational Contracting: Creating Value Beyond the Project , 2005 .
[3] Durward K. Sobek,et al. Toyota's Principles of Set-Based Concurrent Engineering , 1999 .
[4] Durward K. Sobek,et al. The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .
[5] Ossama Salem,et al. Lean Construction: From Theory to Implementation , 2006 .
[6] Patrick C. Suermann. Evaluating The Impact Of Building Information Modeling (BIM) On Construction , 2009 .
[7] Jens Ove Riis,et al. Lean Project Management , 1993 .
[8] Michael J. Horman,et al. Organizing Constructability Knowledge for Design , 2005 .
[9] Matthijs Prins,et al. Design & Build: An Effectiveness Study , 2012 .
[10] Glenn Ballard,et al. Positive Vs. Negative Iteration in Design , 2000 .
[11] G. Howell,et al. Integrated Project Delivery An Example Of Relational Contracting , 2005 .
[12] Scott Gallagher,et al. The Toyota Way , 2005, IEEE Transactions on Engineering Management.
[13] R Ruben Favié,et al. Ranking Construction Project Characteristics , 2008 .
[14] Farook Hamzeh,et al. Improving Construction Workflow- The Role of Production Planning and Control , 2009 .
[15] Michael J. Horman,et al. High Performance Building Design Process Model , 2005 .
[16] Luis F. Alarcón,et al. Implementing Lean Production Strategies in Construction Companies , 2003 .
[17] William A. Lichtig,et al. The Integrated Agreement for Lean Project Delivery , 2010 .
[18] M. Swainston,et al. Early contractor involvement , 2006 .
[19] Jeffrey J. Kilian,et al. Construction Litigation for the U.S. Naval Facilities Engineering Command, 1982–2002 , 2005 .
[20] Bozidar Stojadinovic,et al. Set-Based Design: Case Study on Innovative Hospital Design , 2008 .
[21] Jesus M. de la Garza,et al. Last Planner Technique: A Case Study , 2000 .
[22] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .