THE UPGRADING OF THE TLS INJECTOR BUMPER AND SEPTUM POWER SUPPLIES FOR TOP-UP OPERATION

Due to the inevitable requirement of routine top-up mode operation at TLS (Taiwan Light Source), the reliability of all components in TLS injector has been reevaluated in the past several months. Among all possible subsystems to be reinforced, the bumper and septum power supplies revealed urgent need to be upgraded while being operated continuously in the user shifts. In this report, the modification of the charging mechanism of the pulsed power supplies is described. The modular feature of the newly-built units provides fast replacement capability in case of components failure. The unified specifications for all components have greatly reduced the effort in preparing spare parts. The test results of these units are presented in this report.

[1]  Jenny Chen,et al.  CONTROL INTEGRATION FOR THE INJECTOR IN SRRC , 1999 .

[2]  H. Wiedemann Particle accelerator physics , 1993 .

[3]  T. S. Ueng,et al.  The upgrade of SRRC booster extraction system , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).

[4]  J. Chen TUNE MEASUREMENT OF SRRC BOOSTER DURING RAMPING , 2000 .

[5]  K. Hsu,et al.  Performance of SRRC 1.3 GeV electron booster synchrotron , 1995 .

[6]  K. T. Hsu,et al.  Performance of the rejuvenated injector control system in SRRC , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).

[7]  G. G. Stokes "J." , 1890, The New Yale Book of Quotations.