Automated process discovery from event logs in BIM construction projects
暂无分享,去创建一个
Yue Pan | Limao Zhang | Limao Zhang | Yue Pan
[1] Zhiwu Li,et al. Mining event logs for knowledge discovery based on adaptive efficient fuzzy Kohonen clustering network , 2020, Knowl. Based Syst..
[2] Zhiliang Ma,et al. Data-driven decision-making for equipment maintenance , 2020 .
[3] G. Rothblum,et al. Developing a COVID-19 mortality risk prediction model when individual-level data are not available , 2020, Nature Communications.
[4] Diogo R. Ferreira,et al. Business process analysis in healthcare environments: A methodology based on process mining , 2012, Inf. Syst..
[5] David K. H. Chua,et al. A simulation model to study the impact of early information on design duration and redesign , 2011 .
[6] Wil M. P. van der Aalst,et al. Workflow mining: discovering process models from event logs , 2004, IEEE Transactions on Knowledge and Data Engineering.
[7] Xiang Xie,et al. Digital twin-enabled anomaly detection for built asset monitoring in operation and maintenance , 2020, Automation in Construction.
[8] Yue Pan,et al. A BIM-data mining integrated digital twin framework for advanced project management , 2021 .
[9] Jing Sun,et al. IFCCompressor: A content-based compression algorithm for optimizing Industry Foundation Classes files , 2015 .
[10] Limao Zhang,et al. Transparent Digital Twin for Output Control Using Belief Rule Base , 2021, IEEE Transactions on Cybernetics.
[11] van S Stijn Schaijk. Building Information Model (BIM) based process mining:enabling knowledge reassurance and fact-based problem discovery within the Architecture, Engineering, Construction and Facility Management Industry , 2016 .
[12] Sander J. J. Leemans,et al. Process and Deviation Exploration with Inductive Visual Miner , 2014, BPM.
[13] Walter Terkaj,et al. A Virtual Factory Data Model as a Support Tool for the Simulation of Manufacturing Systems , 2015 .
[14] Boudewijn F. van Dongen,et al. On the Role of Fitness, Precision, Generalization and Simplicity in Process Discovery , 2012, OTM Conferences.
[15] Cristóbal Romero,et al. A survey on educational process mining , 2018, WIREs Data Mining Knowl. Discov..
[16] Arthur M. Valle,et al. Applying process mining techniques in software process appraisals , 2017, Inf. Softw. Technol..
[17] Wil M. P. van der Aalst,et al. Fuzzy Mining - Adaptive Process Simplification Based on Multi-perspective Metrics , 2007, BPM.
[18] Wil M. P. van der Aalst,et al. Process Mining - Discovery, Conformance and Enhancement of Business Processes , 2011 .
[19] Ludovic Galas,et al. Characterization of neuropeptides which control cerebellar granule cell survival, migration and differentiation , 2015, SpringerPlus.
[20] Hajo A. Reijers,et al. Discovering Social Networks from Event Logs , 2005, Computer Supported Cooperative Work (CSCW).
[21] Zhaohui Wu,et al. An Efficient Recommendation Method for Improving Business Process Modeling , 2014, IEEE Transactions on Industrial Informatics.
[22] Robert John Lark,et al. BIM for infrastructure: An overall review and constructor perspective , 2016 .
[23] Limao Zhang,et al. Roles of artificial intelligence in construction engineering and management: A critical review and future trends , 2021 .
[24] Amir H. Behzadan,et al. Knowledge-Based Simulation Modeling of Construction Fleet Operations Using Multimodal-Process Data Mining , 2013 .
[25] Limao Zhang,et al. BIM log mining: Learning and predicting design commands , 2020 .
[26] Moe Thandar Wynn,et al. Towards Privacy-Preserving Process Mining in Healthcare , 2019, Business Process Management Workshops.
[27] Wichian Premchaiswadi,et al. Process modeling and bottleneck mining in online peer-review systems , 2015, SpringerPlus.
[28] Rafael Sacks,et al. Assessing research issues in Automated Project Performance Control (APPC) , 2007 .
[29] Wil M. P. van der Aalst,et al. Data Science in Action , 2016 .
[30] Wichian Premchaiswadi,et al. Time performance analysis of medical treatment processes by using disco , 2015, 2015 13th International Conference on ICT and Knowledge Engineering (ICT & Knowledge Engineering 2015).
[31] Ayca Tarhan,et al. A Goal-Driven Evaluation Method Based On Process Mining for Healthcare Processes , 2018, Applied Sciences.
[32] Mazdak Nik-Bakht,et al. IFC-based process mining for design authoring , 2020 .
[33] Xiaowei Luo,et al. Utilizing BIM and Carbon Estimating Methods for Meaningful Data Representation , 2016 .
[34] Ashutosh Tiwari,et al. Modelling collaboration using complex networks , 2011, Inf. Sci..
[35] Song Wu,et al. Application and extension of the IFC standard in construction cost estimating for tendering in China , 2011 .
[36] Jorge Munoz-Gama,et al. Process mining in healthcare: A literature review , 2016, J. Biomed. Informatics.
[37] Leonid Churilov,et al. Discrete-event simulation and system dynamics for management decision making , 2014 .
[38] Koen Vanhoof,et al. A business process mining application for internal transaction fraud mitigation , 2011, Expert Syst. Appl..
[39] Zhao Xu,et al. Developing an IFC-Based Database for Construction Quality Evaluation , 2018 .
[40] Arash Shahi,et al. Automated Schedule and Progress Updating of IFC-Based 4D BIMs , 2017, J. Comput. Civ. Eng..
[41] Hanbin Luo,et al. A BIM-based construction quality management model and its applications , 2014 .
[42] Nan Zhang,et al. Intelligent optimal design of floor tiles: A goal-oriented approach based on BIM and parametric design platform , 2021 .
[43] Raja R. A. Issa,et al. ONTOLOGY BASED PARTIAL BUILDING INFORMATION MODEL EXTRACTION , 2011 .
[44] Arkady B. Zaslavsky,et al. Context Aware Computing for The Internet of Things: A Survey , 2013, IEEE Communications Surveys & Tutorials.
[45] Rajeev Motwani,et al. The PageRank Citation Ranking : Bringing Order to the Web , 1999, WWW 1999.
[46] Moe Thandar Wynn,et al. Quality-informed semi-automated event log generation for process mining , 2020, Decis. Support Syst..
[47] Ashish Sureka,et al. Process mining multiple repositories for software defect resolution from control and organizational perspective , 2014, MSR 2014.
[48] Limao Zhang,et al. Clustering of designers based on building information modeling event logs , 2020, Comput. Aided Civ. Infrastructure Eng..
[49] Bhargav Dave,et al. A framework for integrating BIM and IoT through open standards , 2018, Automation in Construction.
[50] Farook Hamzeh,et al. Simulating the dynamics of social agents and information flows in BIM-based design , 2018, Automation in Construction.
[51] SepúlvedaMarcos,et al. Process mining in healthcare , 2016 .
[52] C. Petri. Kommunikation mit Automaten , 1962 .
[53] Yin-Fu Huang,et al. Mining web logs to improve hit ratios of prefetching and caching , 2008, Knowl. Based Syst..
[54] Damián Pérez Alfonso,et al. Inductive Visual Miner Plugin Customization for the Detection of Eventualities in the Processes of a Hospital Information System , 2016 .
[55] Jack Chin Pang Cheng,et al. Data-driven predictive maintenance planning framework for MEP components based on BIM and IoT using machine learning algorithms , 2020 .
[56] Reda Alhajj,et al. Effective web log mining and online navigational pattern prediction , 2013, Knowl. Based Syst..
[57] Jonathan E. Bard,et al. Endothelialization of arterial vascular grafts by circulating monocytes , 2020, Nature Communications.
[58] Pnina Soffer,et al. Building a valuable event log for process mining: an experimental exploration of a guided process , 2019, Enterp. Inf. Syst..
[59] Jon Kleinberg,et al. Authoritative sources in a hyperlinked environment , 1999, SODA '98.
[60] Ming Gu,et al. The IFC-based path planning for 3D indoor spaces , 2013, Adv. Eng. Informatics.
[61] Sander J. J. Leemans,et al. Discovering Block-Structured Process Models from Event Logs - A Constructive Approach , 2013, Petri Nets.
[62] Peter E.D. Love,et al. Real time progress management: Re-engineering processes for cloud-based BIM in construction , 2015 .
[63] Yacine Rezgui,et al. Towards a semantic Construction Digital Twin: Directions for future research , 2020, Automation in Construction.
[64] Jack Chin Pang Cheng,et al. Integrating 4D BIM and GIS for Construction Supply Chain Management , 2019, Journal of Construction Engineering and Management.
[65] Jan Mendling,et al. Managing Process Model Complexity Via Abstract Syntax Modifications , 2011, IEEE Transactions on Industrial Informatics.
[66] Phillip S. Dunston,et al. Integrating IoT into operational workflows for real-time and automated decision-making in repetitive construction operations , 2018, Automation in Construction.
[67] Pardis Pishdad-Bozorgi,et al. A review of building information modeling (BIM) and the internet of things (IoT) devices integration: Present status and future trends , 2019, Automation in Construction.