PE 배관 맞대기 융착을 위한 열판의 개발

Many processes have been introduced to join PE pipes, but most of these methods have lots of disadvantages such as costs and lack of reliability, etc. Recently due to the benefits of cost, safety and reliability, the butt welding has been paid much attention to joint PE pipes. In case of butt welding, the heat plate which is used to melt PE pipes is the most critical equipment. In this study, after developing the heat plate of new shape, the PE double wall pipes with misalignments were butt-welded by using the conventional and developed heat plates and comparison of weld-zones and tensile test was performed. As the results of tensile test, weld-zones using developed heat plate have strength of 147.7 ~ 251.0% of weld-zones using conventional heat plate.