On Satisfying Timing Constraints in Hard-Real-Time Systems
暂无分享,去创建一个
[1] M. Gonzalez,et al. Periodic Job Scheduling in a Distributed Processor System , 1976, IEEE Transactions on Aerospace and Electronic Systems.
[2] David S. Johnson,et al. Scheduling Tasks with Nonuniform Deadlines on Two Processors , 1976, J. ACM.
[3] Jia Xu,et al. Multiprocessor Scheduling of Processes with Release Times, Deadlines, Precedence, and Exclusion Relations , 1993, IEEE Trans. Software Eng..
[4] Graham McMahon,et al. On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness , 1975, Oper. Res..
[5] Sartaj Sahni,et al. Scheduling Independent Tasks with Due Times on a Uniform Processor System , 1980, JACM.
[6] Charles U. Martel,et al. Preemptive Scheduling with Release Times, Deadlines, and Due Times , 1982, JACM.
[7] Teofilo F. Gonzalez,et al. Preemptive Scheduling of Uniform Processor Systems , 1978, JACM.
[8] Terry Shepard,et al. A model of the F18 mission computer software for pre-run-time scheduling , 1990, Proceedings.,10th International Conference on Distributed Computing Systems.
[9] Barbara B. Simons,et al. Multiprocessor Scheduling of Unit-Time Jobs with Arbitrary Release Times and Deadlines , 1983, SIAM J. Comput..
[10] Aloysius K. Mok,et al. Multiprocessor On-Line Scheduling of Hard-Real-Time Tasks , 1989, IEEE Trans. Software Eng..
[11] J. Xu,et al. Pre-run-time scheduling of processes with exclusion relations on nested or overlapping critical sections , 1992, Eleventh Annual International Phoenix Conference on Computers and Communication [1992 Conference Proceedings].
[12] J.A. Stankovic,et al. Misconceptions about real-time computing: a serious problem for next-generation systems , 1988, Computer.
[13] Aloysius Ka-Lau Mok,et al. Fundamental design problems of distributed systems for the hard-real-time environment , 1983 .
[14] Jacek Blazewicz,et al. Deadline Scheduling of Tasks with Ready Times and Resource Constraints , 1979, Inf. Process. Lett..
[15] Alexander D. Stoyen,et al. Real-Time Euclid: A language for reliable real-time systems , 1989, IEEE Transactions on Software Engineering.
[16] Chung Laung Liu,et al. Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment , 1989, JACM.
[17] Jane W.-S. Liu,et al. Scheduling Periodic Jobs That Allow Imprecise Results , 1990, IEEE Trans. Computers.
[18] Hermann Kopetz,et al. Distributed fault-tolerant real-time systems: the Mars approach , 1989, IEEE Micro.
[19] Alan C. Shaw,et al. Reasoning About Time in Higher-Level Language Software , 1989, IEEE Trans. Software Eng..
[20] David Lorge Parnas,et al. On synchronization in hard-real-time systems , 1988, CACM.
[21] Krithi Ramamritham,et al. Preemptive Scheduling Under Time and Resource Constraints , 1987, IEEE Transactions on Computers.
[22] Gene D. Carlow. Architecture of the space shuttle primary avionics software system , 1984, CACM.
[23] Krithi Ramamritham,et al. A Window Protocol for Transmission of Time-Constrained Messages , 1990, IEEE Trans. Computers.
[24] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[25] Jacek Blazewicz,et al. Scheduling Dependent Tasks with Different Arrival Times to Meet Deadlines , 1976, Performance.
[26] David Lorge Parnas,et al. Concurrent control with “readers” and “writers” , 1971, CACM.
[27] W. A. Horn. Some simple scheduling algorithms , 1974 .
[28] Sudarshan K. Dhall,et al. An On Line Algorithm for Real-Time Tasks Allocation , 1986, IEEE Real-Time Systems Symposium.
[29] Aloysius K. Mok,et al. Evaluating tight execution time bounds of programs by annotations , 1989 .
[30] P. M. Melliar-Smith,et al. Formal Specification and Mechanical Verification of SIFT: A Fault-Tolerant Flight Control System , 1982, IEEE Transactions on Computers.
[31] Jacek Blazewicz,et al. Scheduling Multiprocessor Tasks to Minimize Schedule Length , 1986, IEEE Transactions on Computers.
[32] Sudarshan K. Dhall,et al. On a Real-Time Scheduling Problem , 1978, Oper. Res..
[33] Charles U. Martel,et al. Scheduling Periodically Occurring Tasks on Multiple Processors , 1981, Inf. Process. Lett..
[34] Sartaj Sahni,et al. Nearly On Line Scheduling of a Uniform Processor System with Release Times , 1979, SIAM J. Comput..
[35] Omri Serlin,et al. Scheduling of time critical processes , 1899, AFIPS '72 (Spring).
[36] David S. Johnson,et al. Two-Processor Scheduling with Start-Times and Deadlines , 1977, SIAM J. Comput..
[37] Dan Gusfield,et al. Bounds for Naive Multiple Machine Scheduling with Release Times and Deadlines , 1984, J. Algorithms.
[38] Pierre N. Robillard,et al. Scheduling with earliest start and due date constraints on multiple machines , 1975 .
[39] Robert E. Tarjan,et al. Scheduling Unit-Time Tasks with Arbitrary Release Times and Deadlines , 1981, SIAM J. Comput..
[40] J. Leung,et al. A Note on Preemptive Scheduling of Periodic, Real-Time Tasks , 1980, Inf. Process. Lett..
[41] Krithi Ramamritham,et al. Scheduling Tasks with Resource Requirements in Hard Real-Time Systems , 1987, IEEE Transactions on Software Engineering.
[42] Kenneth R. Baker,et al. Sequencing with due-dates and early start times to minimize maximum tardiness , 1974 .
[43] Dennis W. Leinbaugh. Guaranteed Response Times in a Hard-Real-Time Environment , 1980, IEEE Transactions on Software Engineering.
[44] Jan Karel Lenstra,et al. Recent developments in deterministic sequencing and scheduling: a survey : (preprint) , 1981 .
[45] David Lorge Parnas,et al. Scheduling Processes with Release Times, Deadlines, Precedence, and Exclusion Relations , 1990, IEEE Trans. Software Eng..
[46] Lui Sha,et al. Priority Inheritance Protocols: An Approach to Real-Time Synchronization , 1990, IEEE Trans. Computers.
[47] Mario J. Gonzalez. Deterministic Processor Scheduling , 1977, CSUR.
[48] John A. Stankovic,et al. Real-time computing systems: the next generation , 1988 .
[49] Pierre N. Robillard,et al. Scheduling with earliest start and due date constraints , 1971 .