Constructive heuristic algorithm for sub-transmission system planning
暂无分享,去创建一个
Armando M. Leite da Silva | Luiz A. da Fonseca Manso | Femando A. de Assis | Leonidas C. de Resende | Fabio L. dos Santos
[1] Mohamed A. El-Sharkawi,et al. Modern heuristic optimization techniques :: theory and applications to power systems , 2008 .
[2] A. M. Leite da Silva,et al. Performance comparison of metaheuristics to solve the multi-stage transmission expansion planning problem , 2011 .
[3] Mohamed A. El-Sharkawi,et al. Modern Heuristic Optimization Techniques , 2008 .
[4] George J. Anders,et al. Transmission expansion planning: A discussion on reliability and “N−1” security criteria , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.
[5] Saeid Jalilzadeh,et al. A new approach for Subtransmission System expansion planning with genetic alghorithm , 2010, International Congress on Ultra Modern Telecommunications and Control Systems.
[6] A.M.L. da Silva,et al. Tabu Search Applied to Transmission Expansion Planning Considering Losses and Interruption Costs , 2008, Proceedings of the 10th International Conference on Probablistic Methods Applied to Power Systems.
[7] G. Latorre,et al. Classification of publications and models on transmission expansion planning , 2003 .
[8] Roy Billinton,et al. Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .
[9] Brian Stott,et al. Decoupled Newton Load Flow , 1972 .
[10] Alvaro Sanchez,et al. ANDREA: A long-term dynamic planning tool for subtransmission electricity networks , 2009, 2009 6th International Conference on the European Energy Market.