Two‐stage load‐scheduling model for the incentive‐based demand response of industrial users considering load aggregators

The demand response (DR) resources provided by modern industrial users tend to be diversified because of the popularisation of renewable energy. In this context, for the problem of satisfaction and uncertainty in the DR, a load-scheduling model considering load aggregators (LAs) is presented. In the multi-level DR scheduling system, the users and aggregator simultaneously participate in the decision; thus, the proposed methodology is a two-stage optimisation process. The first-stage optimisation considers the load interruption strategies of complex industrial processes, where a multi-objective optimisation model is established to coordinate the user benefits and satisfaction. This model is solved by non-dominated sorting genetic algorithm-II (NSGA-II) and the entropy weight double-base point method to obtain the optional interruptible load (IL) contracts for production processes. The second-stage optimisation maximises the economic returns of the LA considering the uncertainty of the resource's response, where chance-constraint programming is applied to solve the problem and select the appropriate IL contract. The effectiveness of the proposed methodology is examined according to the actual industrial production process. The multi-objective coordination effect of production load-scheduling is shown in an example. Finally, the effects of joint resource scheduling and different confidence levels on the profit of the aggregator are analysed.

[1]  Joao P. S. Catalao,et al.  Customer-driven demand response model for facilitating roof-top PV and wind power integration , 2017 .

[2]  Tianqi Hong,et al.  Dynamic Demand Response Using Customer Coupons Considering Multiple Load Aggregators to Simultaneously Achieve Efficiency and Fairness , 2018, IEEE Transactions on Smart Grid.

[3]  Lokesh Kumar Panwar,et al.  Demand response aggregator coordinated two-stage responsive load scheduling in distribution system considering customer behaviour , 2017 .

[4]  Matti Lehtonen,et al.  Distribution network reliability improvements in presence of demand response , 2014 .

[5]  F. Alvarado,et al.  Designing incentive compatible contracts for effective demand management , 2000 .

[6]  Peter Boait,et al.  Accommodating renewable generation through an aggregator-focused method for inducing demand side response from electricity consumers , 2013 .

[7]  Pierluigi Siano,et al.  Contribution of emergency demand response programs in power system reliability , 2016 .

[8]  Suryanarayana Doolla,et al.  Responsive End-User-Based Demand Side Management in Multimicrogrid Environment , 2014, IEEE Transactions on Industrial Informatics.

[9]  Nirwan Ansari,et al.  The Progressive Smart Grid System from Both Power and Communications Aspects , 2012, IEEE Communications Surveys & Tutorials.

[10]  Gao Ciwe,et al.  Bi-level Optimal Dispatch and Control Strategy for Air-conditioning Load Based on Direct Load Control , 2014 .

[11]  Xu Wang,et al.  Bidding strategy analysis of virtual power plant considering demand response and uncertainty of renewable energy , 2017 .

[12]  Zhi Chen,et al.  Electric Demand Response Management for Distributed Large-Scale Internet Data Centers , 2014, IEEE Transactions on Smart Grid.