Replacement Policies for Periodic Damage Models

A new periodic damage model is proposed in this paper, where the damage produced by shocks is only measured at periodic times, without considering the stochastic shocks and the cumulative process of damage in discrete times. We model five replacement policies for the periodic damage models using three approaches of whichever triggering event occurs first, whichever triggering event occurs last, and replacing over a planned measure, which are named as replacement first, replacement last, over-damage replacement, over-damage replacement first, and over-damage replacement last, respectively. In analytical ways, we obtain their optimum replacement policies to minimize the expected cost rates and compare them to find which model is more economical. Finally, numerical examples are given to illustrate the validity of the presented models.

[1]  Khac Tuan Huynh,et al.  A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events , 2011, Reliab. Eng. Syst. Saf..

[2]  Dragan Banjevic,et al.  Optimum inspection interval for a system under periodic and opportunistic inspections , 2012 .

[3]  Toshio Nakagawa,et al.  Maintenance Overtime Policies in Reliability Theory , 2015 .

[4]  Dragan Banjevic,et al.  Periodic inspection optimization model for a complex repairable system , 2010, Reliab. Eng. Syst. Saf..

[5]  C. Chu,et al.  An improved exact algorithm for single-machine scheduling to minimise the number of tardy jobs with periodic maintenance , 2016 .

[6]  T Duchesne,et al.  Alternative Time Scales and Failure Time Models , 2000, Lifetime data analysis.

[7]  Toshio Nakagawa,et al.  Optimization problems of replacement first or last in reliability theory , 2012, Eur. J. Oper. Res..

[8]  Shey-Huei Sheu,et al.  Extended preventive replacement policy for a two-unit system subject to damage shocks , 2015 .

[9]  Toshio Nakagawa,et al.  Optimal Backup Policies for a Database System with Incremental Backup , 2002 .

[10]  Ferenc Szidarovszky,et al.  New one cycle criteria for optimizing preventive replacement policies , 2016, Reliab. Eng. Syst. Saf..

[11]  R. D. McDowall Computer (In)security – 2: computer system backup and recovery , 2001 .

[12]  Toshio Nakagawa,et al.  First and Last Triggering Event Approaches for Replacement With Minimal Repairs , 2016, IEEE Transactions on Reliability.

[13]  Li Yang,et al.  A delay time model for a mission-based system subject to periodic and random inspection and postponed replacement , 2016, Reliab. Eng. Syst. Saf..

[14]  Sharareh Taghipour,et al.  Periodic Inspection Optimization of a k-Out-of-n Load-Sharing System , 2015, IEEE Transactions on Reliability.

[15]  Toshio Nakagawa,et al.  Shock and Damage Models in Reliability Theory , 2006 .

[16]  Toshio Nakagawa,et al.  Optimal periodic and random inspections with first, last and overtime policies , 2015, Int. J. Syst. Sci..

[17]  Wenbin Wang,et al.  Ergodicity of forward times of the renewal process in a block-based inspection model using the delay time concept , 2012, Reliab. Eng. Syst. Saf..

[18]  J. S. Chen,et al.  Single-machine scheduling with flexible and periodic maintenance , 2006, J. Oper. Res. Soc..

[19]  Hamid Reza Golmakani,et al.  Periodic inspection optimization model for a two-component repairable system with failure interaction , 2012, Comput. Ind. Eng..

[20]  Yeu-Shiang Huang,et al.  Non-periodic preventive maintenance with reliability thresholds for complex repairable systems , 2015, Reliab. Eng. Syst. Saf..

[21]  R. Jiang,et al.  An efficient quasi-periodic inspection scheme for a one-component system , 2017 .

[22]  A. W. Marshall,et al.  Shock Models and Wear Processes , 1973 .

[23]  Toshio Nakagawa,et al.  Which is better for replacement policies with continuous or discrete scheduled times? , 2015, Eur. J. Oper. Res..

[24]  Satoshi Fukumoto,et al.  Optimal backup policy for a database system with incremental and full backups , 2003 .

[25]  Dong Ho Park,et al.  Optimal maintenance level for second-hand product with periodic inspection schedule , 2015 .

[26]  Toshio Nakagawa,et al.  A summary of periodic and random inspection policies , 2010, Reliab. Eng. Syst. Saf..