An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks

In transit systems there is a critical trade-off between the level of service and operating costs. At the planning level, for a given network design, this trade-off is captured by the timetabling (TT) and vehicle scheduling (VS) problems. In the TT problem we try to maximize the number of passengers benefited by well timed transfers, while in the VS problem we seek to minimize the operating costs, which are related to the fleet size. This paper presents two integer linear programming models for the TT and VS problems, and combines them in a bi-objective integrated model. We propose and implement an ∊-constraint method to jointly solve this TT and VS bi-objective problem. This allows to analyze the trade-off between these two criteria in terms of Pareto fronts. Numerical experiments show that our proposed approach can solve scenarios with up to 50 bus lines.

[1]  Jin-Kao Hao,et al.  Transit network timetabling and vehicle assignment for regulating authorities , 2010, Comput. Ind. Eng..

[2]  M. Caramia,et al.  Multi-objective Management in Freight Logistics: Increasing Capacity, Service Level and Safety with Optimization Algorithms , 2008 .

[3]  José M. P. Paixão,et al.  Vehicle Scheduling for Public Mass Transit — An Overview , 1995 .

[4]  Avishai Ceder,et al.  Public Transit Planning and Operation: Theory, Modeling and Practice , 2007 .

[5]  Omar Jorge Ibarra Rojas,et al.  Multiperiod synchronization bus timetabling , 2015 .

[6]  Jinsheng Shen,et al.  Regional Bus Operation Bi-level Programming Model Integrating Timetabling and Vehicle Scheduling , 2007 .

[7]  I. Y. Kim,et al.  Adaptive weighted-sum method for bi-objective optimization: Pareto front generation , 2005 .

[8]  Jin-Kao Hao,et al.  Transit Network Re-timetabling and Vehicle Scheduling , 2008, MCO.

[9]  Yasmin A. Rios-Solis,et al.  Synchronization of bus timetabling , 2012 .

[10]  Yasmin A. Rios-Solis,et al.  Multiperiod Bus Timetabling , 2016, Transp. Sci..

[11]  Helena Ramalhinho Dias Lourenço,et al.  Iterated Local Search , 2001, Handbook of Metaheuristics.

[12]  Albert P. M. Wagelmans,et al.  Models and Algorithms for Single-Depot Vehicle Scheduling , 2001, Transp. Sci..

[13]  Avishai Ceder,et al.  Optimal Multi-Vehicle Type Transit Timetabling and Vehicle Scheduling , 2011 .

[14]  Anitha Eranki,et al.  A Model to Create Bus Timetables to Attain Maximum Synchronization Considering Waiting Times at Transfer Stops , 2004 .